Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on October 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Contract with ST Lucie County Bocc

Title in Florida FACTS: 4673-11-R St. Lucie County, Portofino Shores II Lift Station

Awarded
H1071State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under solicitation H1071, the Florida Division of Emergency Management and St. Lucie County have entered into a Hazard Mitigation Grant Program agreement to install backup power at the Portofino Shores II Lift Station in Fort Pierce, Florida. The project involves the purchase and installation of a permanent generator with a 20kW capacity, or a size determined by an electrical engineer, along with an automatic transfer switch, a supply diesel tank, an equipment pad, and necessary electrical connections. This infrastructure is designed to prevent sewage overflows during power outages by ensuring continuous operation of the lift station. The total award amount for this project is 64,642.95 dollars, following a budget increase from the original grant of 63,226.17 dollars. The performance period extends from April 21, 2024, through April 30, 2027. To ensure resilience, the generator and electrical components must be protected against a 500-year flood event and comply with National Flood Insurance Program requirements and ASCE 7 wind anchoring standards. All work must be performed in strict accordance with Federal, State, and Local rules and regulations, including National Electrical Code working clearance requirements.

General Info

Florida and St. Lucie County grant $64,642.95 for backup power at Portofino Shores.

Contract Value

$64,642.95

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

April 30, 2027

Documents

2
PDF, High priority: read this firstmodification
High
PDF, High priority: read this firstcontract-document
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program (HMGP) project, the Sub-Recipient shall provide backup power to the Portofino Lift Station located in Fort Pierce, Florida 34951. Coordinates: (27.540619, -80.389361). The HMGP project shall provide protection by purchasing and installing a permanent generator at the Portofino sewer lift station with a 20kW capacity or the adequate size determined by the vendor/or an electrical engineer during the bid process, to appropriately support this utility. The project includes constructing an equipment pad, installing an automatic transfer switch (ATS), a supply diesel tank and electrical connections. Currently this infrastructure is unprotected without any source of backup power during power outages. An interruption in the electric power supply would result in a loss of service of the lift station which would lead to sewage overflows. The project shall decrease the risk of electrical power loss to the lift station and shall prevent sewage overflows during future power outages. The generator and electrical components shall be protected against a 500-year (0.2% annual chance) flood event by implementing specific activities or by locating the generator outside the Special Flood Hazard Area (SFHA), comply with applicable National Flood Insurance Program (NFIP) requirements and shall be protected against wind with a rated enclosure and appropriate anchoring based on its location requirements per ASCE 7 standards. The selected site shall provide sufficient space to maintain and fuel the generator and shall comply with the National Electrical Code working clearance requirements. Activities shall be completed in strict compliance with Federal, State and Local applicable Rules and Regulations.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS