Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on January 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

470c2 MosineeFY2026

Closed
260014153

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and consistency of its transformer maintenance. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices to improve technician safety, and performing detailed oil testing and analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for up to 20 agency staff members, and develop comprehensive standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award based on the offeror's capability, staffing plan, personnel availability, and cost-effectiveness. Qualified candidates must demonstrate experience with at least one project for a utility or industrial facility and one project combining oil sampling with infrared inspections. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed company profile, project methodology, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total value and may include one-year extension options. Payment will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, repair, and certification of emergency lighting systems to ensure full compliance with NFPA 101 (2024 Edition), NFPA 70 (National Electrical Code), and OSHA safety regulations. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. The award will be based on overall best value. Bidders must provide a detailed cost breakout on company letterhead and a bid bond guarantee of 20% for bids equal to or exceeding $25,000. Awarded contractors with bids at or above $25,000 must also provide performance and payment bonds from a surety company with at least an A- rating. The contractor is required to provide durable, uniquely numbered labels for all tested fixtures and deliver two complete operation and maintenance manuals, manufacturer warranties, and a one-year guarantee of workmanship upon substantial completion. Compliance requirements include adherence to the Davis-Bacon Act and Construction Wage Rate Requirements for Idaho, as well as FAR regulations regarding small business self-certification, debarment disclosure for subcontracts over $45,000, and the Buy American Act. Contractors must also comply with federal mandates for paid sick leave and the display of employee rights and wage determination notices. Final payment is contingent upon a joint substantial completion inspection and the resolution of all punch list items.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Mosinee School District is seeking proposals for a comprehensive network infrastructure upgrade across three campuses, including elementary, middle, and high schools. The project involves the procurement and installation of 29 WiFi 6/6E wireless access points, five Layer 3 Lite switches with POE+ capabilities, and approximately 314,700 feet of Cat6A cabling across 1,049 copper runs. Requirements include five-year software licenses for hardware, appropriate mounting brackets, and DAC cabling for switch stacking. Service providers must conduct an onsite review with the technical contact before submitting a proposal. Bids must provide detailed installation and routing plans, itemized labor costs separate from materials, and comprehensive documentation including as-built drawings and testing results. All proposed materials must include manufacturer documentation regarding environmental ratings and warranties. To avoid disqualification, vendors must sign and attach the Proposal Overview document and ensure all line items specify the manufacturer.

General Info

Mosinee School District seeks proposals for network hardware, Cat6A cabling, and installation services.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Mosinee School District
Contacts2 people available
OfficeMosinee, WI, 54455, USA
Office AddressMosinee, WI, 54455, USA
Contacts
Nathan BrostPrimary Contact
Cristy HeldtTechnology Administrator

Full Description

Show more
-Recipients of Service (count and list of entities): (3) - Elementary, High, Middle-
-WAP: -Estimated Quantity: 29 - Manufacturer: Aruba or equivalent. Composed of below- -Estimated Quantity: 4 - Manufacturer: Aruba 655 or equivalent- -Estimated Quantity: 25 - Manufacturer: Aruba 635 or equivalent- -Include cost of eligible software/licensing to operate WAPS, preference for 5 year license(s)- -WiFi 6/6E or better- -Will consider multi-gig capable wifi ports if justifiable as most cost effective for the future and integrates into the existing or anticipated switch model-
-Cabling: -Estimated total fiber/copper length: 314700 ft -Manufacturer: no preference- -Estimated Cat6A length: 314700 ft - -Estimated total Copper runs: 1049 -Estimated 500 quantity of copper patch cables, various lengths, properly specified- -Service Providers are expected to perform onsite reviews with the Technical Contact, prior to any proposal. Contact the Technical Contact to schedule.- -Proposed cable and ancillary items must be designed for long-term reliability and performance. Proposals are required to provide detailed information and meet the district's expectations for each of the following criteria: Manufacturer documentation regarding Expected Lifetime, Environmental Ratings, Proper Installation Method, and Relevant Warranties- - Installation and Routing Proposals must include a detailed plan for the installation and routing of the network media. The district is seeking the most cost-effective and practical approach for the project. Labor/Installation/Configuration/Activation must be a separate line item, not embedded with material costs.- -Note there may be need for plenum rated pulls for certain runs- -Include all necessary ancillary connectors/terminations, patch panels, jacks, support hooks, etc. and other miscellaneous items for an industry-standard install. All ancillary items should be itemized and justified in the proposal.- -Documentation and Labeling: All components, including cable runs and termination points, must be labeled per accepted international or local naming protocols. The final deliverable must include comprehensive documentation of all testing results for all runs to verify the quality and performance of the installation.- -As-Built Drawings: The district expects deliverable drawings that document the actual installation of the network cabling infrastructure project-
-Switches: -Estimated Quantity: 5 - Manufacturer: Aruba 6300M or equivalent- -Estimated ports per unit: 48 standard 1Gbps copper ports -- 4 uplink ports- -All proposed switches must support basic static routing (Layer 3 Lite) and standard VLAN functionality -Access ports should be POE/POE+ capable- -Number of Multi-gig ports per switch: 8 -Include cost of eligible software/licensing to operate switches, preference for 5 year license(s)- -All units must be non-blocking and full duplex capable- -Power supply capability and count appropriate to anticipated core load and POE budget- -Transceivers at proper quantity, modes and speeds may be included for interdevice and closet connectivity- -Include DAC cables if appropriate to stack to manufacturer standards and local needs-
-Cabling (DAC) : -10 or more feet of DAC cabling, estimated. Aruba or equivalent. Properly configured for speed and interface of switch stacking ports.-
-Rack (wap brackets):-Estimated Quantity: 29 - Manufacturer: Aruba or equivalent- -Brackets/mounting kits and other related items for hanging WAPS- -Installation, Configuration and Activation: Necessary Installation, Configuration and Activation for eligible services. For multiple service requests in general, ICA/Labor should be listed for each service request. If aggregated together, ICA must contain clear detail description of the allocation of ICA for each relevant service request. -Proposal Disqualification Warning: SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
-Important Reminders to Service Providers/Vendors: -1. Read the Proposal Overview (file name: Proposal Overview 2BSIGNED Not an RFP) downloadable from the 470 application RFPS. Note: remember to add the manufacturer to the line item in the price proposal, either in a separate column, or within the item description, if relevant.- -2. Once downloaded sign the Proposal Overview and name the file Proposal Overview - Service Provider (Actual Service Provider Name Inserted)- -3. Be sure to include this Proposal Overview file as an attachment to your submitted proposal to the district. -4. Reminder: The 470 application provides the District's best estimate of the number of items we are seeking in the "Quantity" field in order to indicate to potential service providers the size and scope of our project in the 470. Service providers are free to propose a higher or lower number in their proposals based on their assessment of our needs, if the proposals are clearly responding to our needs
Requested services (5 line items): - Category 2 — Internal Connections — Cabling - Category 2 — Internal Connections — Racks - Category 2 — Internal Connections — Switches And Necessary Software And Licenses - Category 2 — Internal Connections — Wireless Access Points And Necessary Software And Licenses
State/local procurement requirements: The district has policy and administrative regulations regarding purchasing requirements. Please contact the Technical Contact to acquire detailed rules and information that may be relevant to the negotiation processes.
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260014153/133228/20895077-USAC_FCC_FORM_470_APPLICATION_260014153_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260014153/133228/20882614-Proposal%20Overview%202BSIGNED%20Not%20an%20RFP.pdf

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS