Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

4776 Pacheco Boulevard Eight-Lot Major Subdivision and Final Development Plan

Forecast
CDSD23-09643State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 4776 Pacheco Boulevard Eight-Lot Major Subdivision and Final Development Plan is a project led by the Contra Costa County Department of Conservation and Development to subdivide a 1.09-acre parcel in Martinez, California, into eight lots ranging from 4,000 to 5,987 square feet. The project involves the construction of eight new single-family residences using two specific floor plans, the removal of an existing residence and three trees, and the installation of frontage improvements along Weatherly Lane and Pacheco Boulevard. Due to site topography, five 3-foot retaining walls will be constructed. The project is governed by the 2005-2020 Contra Costa County General Plan and includes a preliminary Stormwater Control Plan to direct runoff via a flow-through planter to the existing concrete pipe in the Pacheco Boulevard right-of-way. Technical requirements include an updated geotechnical report approved by the Zoning Administrator and a peer review geologist, with mandatory monitoring of foundation work, drainage installation, and retaining wall construction. Final building inspections are subject to a hard hold until a geotechnical engineer's monitoring report is submitted. Environmental compliance is managed through a Mitigated Negative Declaration, with specific mandates for Cal/OSHA hazardous material disposal and adherence to cultural resource protocols regarding the notification of California Native American tribes and the NAHC. The project is subject to inspection by Contra Costa County Public Works, the Building Inspection Division, the Fire Protection District, and the Mt. View and Contra Costa Water Districts.

General Info

Eight lots planned on Pacheco Blvd, access via Weatherly Lane, retaining walls, two home plans, CEQA Mitigated Negative Declaration.

Agency

California → Contra Costa County

Place of Performance

Pacheco Boulevard and Weatherly Lane, Martinez, CA, 94553

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A

Full Description

Show more
The applicant (project sponsor) requests approval of a Vesting Tentative Subdivision Map for an eight-lot Major Subdivision application to subdivide a 47,695 square-foot (1.09-acre) parcel located at 4776 Pacheco Boulevard into a 5,270 square-foot Lot 1, a 4,000 square-foot Lot 2, a 4,000 square-foot Lot 3, a 5,000 square-foot Lot 4, a 4,900 square-foot Lot 5, a 4,000 square-foot Lot 6, a 4,800 square-foot Lot 7, and a 5,987 square-foot Lot 8. Access to the lots would be provided by Weatherly Lane, a private road that intersects Pacheco Boulevard east of the project site. A 9,738 square-foot portion of the parcel forms the southern portion of Weatherly Lane. The project includes frontage improvements along Weatherly Lane and Pacheco Boulevard, and removal of the existing single-family residence at the southwest corner of the project site along with three trees near the residence. Due to the existing topography of the subject parcel, five 3-foot tall retaining walls would be constructed adjacent to the graded building pads on Lots 1, 4, 5, 7, and 8. The applicant also requests approval of a Final Development Plan for construction of a new single-family residence on each lots. The new single-family residences would each be two stories in one of two floor plans. Plan 1 would be a 3-bedroom 2-1/2 bathroom 1,787 square-foot residence in 4 different Page 2 of 71 contemporary architectural facade styles, with a loft that could be converted into a fourth bedroom. Plan 2 would be a 4-bedroom 2-1/2 bathroom 1,871 square-foot residence with a loft in 4 different architectural façade styles. Given the existing topography of the site, stormwater runoff flows generally towards the northeast towards Pacheco Boulevard. The applicant has submitted a preliminary Stormwater Control Plan that directs runoff to a flow-through planter to be installed adjacent to the Pacheco Boulevard frontage. Runoff that does not percolate into the ground would be directed to the existing 36-inch concrete pipe in the Pacheco Boulevard right-of-way. The 4776 Pacheco Boulevard Lot Major Subdivision and Final Development Plan applications were deemed complete on June 24, 2024, which is before the adoption of the Contra Costa County 2045 General Plan by the Board of Supervisors on November 5, 2024. Thus, this project is subject to the goals and policies of the prior Contra Costa County General Plan, 2005-2020.

Similar Contracts

Same NAICS industry code

NAICS: 237210
SLED
2026-09 220 Old Common Road, Lancaster
Solicitation # 49144
The Commonwealth of Massachusetts, through the Division of Capital Asset Management and Maintenance, is seeking developers for the purchase and redevelopment of a 72.065-acre parcel at 220 Old Common Road in Lancaster. The project aims to transform the historic former Lancaster Industrial School for Girls into a walkable, New Urbanist neighborhood featuring multiple housing typologies. This initiative is driven by the Affordable Homes Act of 2024 and requires a balance of market-rate and affordable housing, with a target of 17.5 percent affordability and a maximum density of 386 units. The redevelopment is subject to stringent historic preservation standards, as the site is a National Historic Places District. Developers must adhere to the Secretary of the Interior's Standards for Rehabilitation and coordinate with the Massachusetts Historical Commission to mitigate adverse effects on historic properties. Technical requirements include compliance with a specific Regulating Plan, adherence to Kinder Morgan pipeline safety protocols, and the implementation of sustainability and decarbonization objectives outlined in Administrative Bulletin 25. Proposals are evaluated based on the development team's experience with similar scale projects and historic tax credits, design quality, financial feasibility, and the ability to maximize affordability and historic preservation. Submissions must include a development proposal, detailed financial information with a pro-forma, a fiscal impact summary for the Town of Lancaster, and a 35,000 dollar deposit. The final deadline for electronic proposal submission via Bid Express is December 17, 2026.
Commonwealth of Massachusetts, Executive Office for Administration & Finance, Division of Capital Asset Management & Maintenance, Office of Real Estate Management Services

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237210
SLED
TTM 20443 Lovemore Ranch
Solicitation # PROJ-2021-00169
Merrell-Johnson Companies, acting on behalf of Lovemore Investments LLC, is seeking approval for Tentative Tract Map No. 20443 to subdivide an 18.49-acre parcel in Joshua Tree, San Bernardino County, into 64 single-family residential lots and two lettered lots for open space and recreational facilities totaling 2.75 acres. The project includes the development of five private internal streets with primary access via Hillview Road. The scope of work encompasses grading, vegetation removal, and the installation of stormwater infrastructure, all of which must comply with the San Bernardino County Development Code, the Countywide Policy Plan 2020, and California Title 24 building energy efficiency standards. The project is subject to rigorous environmental oversight under the California Environmental Quality Act (CEQA), featuring a recirculated Initial Study and Mitigated Negative Declaration to address court-mandated updates to hydrology and stormwater impact assessments. Key requirements include obtaining an Incidental Take Permit from the California Department of Fish and Wildlife, conducting pre-construction surveys for desert tortoises, burrowing owls, and nesting birds, and employing both Native American and paleontological monitors during ground-disturbing activities. Technical compliance is measured by the San Bernardino County Hydrology Manual, requiring post-development peak flows to be no more than 90 percent of pre-development levels. Administrative oversight is managed by the San Bernardino County Land Use Services Department, with a public review period conducted from August 3 to September 2, 2026.
San Bernardino County

POSTED

12 days ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
RFQ.RFP #2-2627 Saw Mill Rd Affordable Housing Project
Solicitation # 2-2627
The Town of Guilford is soliciting competitive proposals from qualified firms to develop affordable housing on an 11-acre tract located on Saw Mill Road. The scope of work encompasses the full development of the site, including the installation of underground utilities for water, gas, electric, and septic systems, as well as site stabilization, plantings, and driveways. A key requirement of the project is the establishment of a deed restriction ensuring affordability for an initial 40-year term, with a mandatory renewal for an additional 40 years. The selected developer must provide a comprehensive concept covering zoning approach, density, unit types, energy efficiency strategies, and a detailed financial feasibility model. Proposals are due by December 1, 2026, and must include a statement of interest, detailed applicant qualifications from the last ten years, an organizational chart with key personnel resumes, and property management experience. Evaluation is based on a 100-point scale focusing on response quality, capacity to provide services, reputation and experience, and the financial plan, with bonus points available for expanded commitments to sustainability and affordability. Compliance with State of Connecticut CDBG funding requirements and Federal procurement standards is mandatory. Additionally, the contract requires adherence to the Little Miller Act regarding payment bonds for public works projects exceeding 100,000 dollars, as well as strict compliance with EEO, non-discrimination, and ADA regulations.
DAS Procurement

POSTED

13 days ago

DEADLINE

in 14 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS