Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

48--VALVE,BALL

Active
N0010426RZB52Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a Level One Program ball valve for critical naval shipboard systems, where failure could result in catastrophic consequences including loss of life or vessel. The valve must strictly comply with Naval Sea Systems Command Drawing 6985328 Assembly "C" and a comprehensive list of referenced specifications, drawings, and technical standards covering material composition, metallurgical properties, and fabrication processes. Key components such as the body, ball, stems, seats, and fasteners are defined with exact material grades including HY-100 steel, UNS N06625, UNS N10276, and Ti-6Al-4V, each requiring specific chemical and mechanical certification. Non-destructive testing protocols including ultrasonic, magnetic particle, and dye penetrant inspections are mandated at multiple stages of production, with acceptance criteria tied directly to defined military and industry standards. The seat material must be MC903 cast nylon with strict physical property controls, and all Teflon coatings must adhere to specified Chemours formulations and application guidelines. All materials require full traceability from raw stock to finished component via unique heat-lot identifiers permanently marked on the part or securely affixed tags, with documentation maintained through every processing step including subcontracted operations. Certifications for chemical composition, mechanical properties, and test results must be provided for each item and must be unsigned, unqualified statements of compliance—electronic signatures are acceptable if properly controlled and uniquely attributable to authorized individuals. First Article Testing and process control plans are mandatory and require prior NAVSEA approval, with re-certification every five years. The contract enforces stringent quality system compliance based on ISO-9001 with ancillary requirements from ISO-10012 and ISO-17025, and authorizes government inspection at source. Security requirements are elevated due to the classified nature of supporting documents, mandating a minimum U.S. confidential clearance for offerors. The order is rated for national defense priority under DPAS regulations, and strict Buy American and small business set-aside rules apply. Delivery is specified at 1,500 days ARC with only two units required, and partial or early delivery is permitted at no additional cost. All documentation, certifications, and compliance data must be submitted electronically, and any deviations or waivers require explicit written approval from the Contracting Officer.

General Info

Procurement of 12 ball valves for Portsmouth Naval Shipyard, set aside for certified small businesses.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

2 updates
PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|b| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material ||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| PROGRESS PAYMENTS (DEVIATION 2026-O0022)(FEB 2026)|4||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| LIST OF AWARD ATTACHMENTS|5|||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|FFP| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| This amendment is being released to reduce the quantity from 12 to 2. The required delivery schedule is revised to 1,500 days ARC. \ This amendment is being issued to remove WSSTERMMZ01. 1.This is a procurement for the Level One Program. 2.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 3.Drawings can be accessed thru: sam.gov. 4.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 5.Partial and early delivery of requirement is authorized and desired and is at no additional cost to either the vendor or the Government. 6.NAVSUP WSS will be considering past performance in the evaluation of offers. See Clause 252.204-7024. 7.This award will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 8.This is a rated order certified for national defense use and the Contractor will follow all requirements of the Defense Priorities and Allocations System Regulation (15 CFR 700), see clause 52.211-14. 9.NECO bids will not be accepted, offers must include original RFP and email it to michael.e.thoman2.civ@us.navy.mil 10. Offerors must have a valid U.S. security clearance of confidential orhigher in order to respond to this RFP (N0010426RZB51), because the RFPincludes anannex classified at the confidential level which will be releasedonly to offerors possessing the appropriate clearance. All classified materialmust be handled in accordance with the National Industrial Security ProgramOperating Manual(NISPOM) (32 CFR Part 117).11.The following proposed deliveryschedule applies: 11.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 18 working days after receipt. Final delivery of material (800 days) 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;4384676 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.3.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=EB-2000 |96169| C|SP |D| | | | DRAWING DATA=EB-2937 |96169| B|SP |D| | | | DRAWING DATA=H553-7801B11 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B111 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B124 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B134 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B147 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B182 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B20 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B21 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B226 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B256 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B274 |53711| B|ER |D| | | | DRAWING DATA=H553-7801B3 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B318 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B329 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B340 |53711| B|ER |D| | | | DRAWING DATA=H553-7801B38 |53711| B|ER |D| | | | DRAWING DATA=H553-7801B408 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B454 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B54 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B545 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B60 |53711| B|ER |D| | | | DRAWING DATA=H553-7801B64 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B66 |53711| A|ER |D| | | | DRAWING DATA=H553-7801B67 |53711| A|ER |D| | | | DRAWING DATA=4384676 |53711| C| |D| | | | DRAWING DATA=4677382 |53711| C| |D| | | | DRAWING DATA=5959311 |53711| C| |D| | | | DRAWING DATA=5959311C5 |53711| A|ER |D| | | | DRAWING DATA=6985328 |53711| B| |D| | | | DRAWING DATA=7016077 |53711| B|DW |D| | | | DRAWING DATA=7016077B105 |53711| A|ER |D| | | | DRAWING DATA=7016077B108 |53711| A|ER |D| | | | DRAWING DATA=7016077B113 |53711| A|ER |D| | | | DRAWING DATA=7016077B115 |53711| A|ER |D| | | | DRAWING DATA=7016077B119 |53711| A|ER |D| | | | DRAWING DATA=7016077B129 |53711| A|ER |D| | | | DRAWING DATA=7016077B132 |53711| A|ER |D| | | | DRAWING DATA=7016077B137 |53711| A|ER |D| | | | DRAWING DATA=7016077B150 |53711| A|ER |D| | | | DRAWING DATA=7016077B152 |53711| A|ER |D| | | | DRAWING DATA=7016077B156 |53711| A|ER |D| | | | DRAWING DATA=7016077B160 |53711| B|ER |D| | | | DRAWING DATA=7016077B162 |53711| A|ER |D| | | | DRAWING DATA=7016077B163 |53711| A|ER |D| | | | DRAWING DATA=7016077B165 |53711| A|ER |D| | | | DRAWING DATA=7016077B173 |53711| A|ER |D| | | | DRAWING DATA=7016077B174 |53711| A|ER |D| | | | DRAWING DATA=7016077B177 |53711| A|ER |D| | | | DRAWING DATA=7016077B194 |53711| A|ER |D| | | | DRAWING DATA=7016077B198 |53711| A|ER |D| | | | DRAWING DATA=7016077B2 |53711| A|ER |D| | | | DRAWING DATA=7016077B205 |53711| B|ER |D| | | | DRAWING DATA=7016077B22 |53711| A|ER |D| | | | DRAWING DATA=7016077B30 |53711| A|ER |D| | | | DRAWING DATA=7016077B39 |53711| C|ER |D| | | | DRAWING DATA=7016077B41 |53711| A|ER |D| | | | DRAWING DATA=7016077B57 |53711| B|ER |D| | | | DRAWING DATA=7016077B66 |53711| B|ER |D| | | | DRAWING DATA=7016077B73 |53711| A|ER |D| | | | DRAWING DATA=7016077B76 |53711| A|ER |D| | | | DRAWING DATA=7016077B81 |53711| A|ER |D| | | | DRAWING DATA=7016077B83 |53711| A|ER |D| | | | DRAWING DATA=7016077B9 |53711| A|ER |D| | | | DRAWING DATA=7016077B93 |53711| A|ER |D| | | | DRAWING DATA=7016077B98 |53711| A|ER |D| | | | DRAWING DATA=7016077B99 |53711| A|ER |D| | | | DRAWING DATA=7069126 |53711| A|DW |D| | | | DRAWING DATA=7069126A10 |53711| A|ER |D| | | | DRAWING DATA=7069126A12 |53711| A|ER |D| | | | DRAWING DATA=7069126A3 |53711| A|ER |D| | | | DRAWING DATA=7069126A4 |53711| A|ER |D| | | | DRAWING DATA=7069126A6 |53711| A|ER |D| | | | DRAWING DATA=7069126A8 |53711| A|ER |D| | | | DRAWING DATA=7069127 |53711| A|DW |D| | | | DRAWING DATA=7069127A10 |53711| B|ER |D| | | | DRAWING DATA=7069127A5 |53711| A|ER |D| | | | DRAWING DATA=7069127A7 |53711| A|ER |D| | | | DRAWING DATA=7069127A9 |53711| A|ER |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-B381 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-B564 | | | |220401|A| | | DOCUMENT REF DATA=ASTM-D638 | | | |100315|A| | | DOCUMENT REF DATA=ASTM-D792 | | | |200701|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=SAE AMS 2631 | | |G |220701|A| | | DOCUMENT REF DATA=EB/GD SPEC 2937 | | |B |900906|A| | | DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=QPL 25027 | | |17 |000207|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=T9074-AD-GIB-010/1688 | | |1 |120713|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=T9074-BD-GIB-010/0300 | | |2 |121218|A| | | 3. REQUIREMENTS 3.1 ;The 12 inch Hull and Backup Ball Valve must be in accordance with Naval Sea Systems Command Drawing 6985328 Assembly "C" and all invoked DRNs and liabilities included with this contract/purchase order, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Part Number 90-1C, with details on drawing 7016077 (Item 90-1); Material - ;T9074-BD-GIB-010/0300, Appendix E, Grade HY-100; Part - ;Safe End, Part Number 90-4C, with details on drawing 7016077 (Item-90-4); Material - ;EB SPEC 2937 or ASTM-B564, alloy UNS N06625 (In accordance with Supplementary Note S2.A. on Drawing 7016077); Part - ;Upper Bushing, Part Number 90-6C, with details on drawing 7016077 (Item 90-6); Material - ;ASTM-B564, Alloy UNS N10276 (In accordance with Supplementary Note S2.A. on Drawing 7016077); Part - ;Ball, Item 123C, with details on drawing 7016077 (Item 120); Material - ;Forged 6AL-4V to SAE-AMS-6931 (In accordance with Supplementary Note S2.B. on Drawing 7016077) or ASTM-B381, Grade F-5 with the following modified mechanical properties: Ultimate Tensile Strength - 125,000 psi Minimum (Longitudinal direction) Elongation in 4D - 10% Minimum Yield Strength - 115,000 psi Minimum Reduction of Area Minimum 20%; Part - ;Seats (Q3) - Part Numbers 114 and 115, with details on drawing 7016077 (Items 114 and 115); Material - MC903 (Type 6 cast nylon produced with polyepsilon caprolactam by the direct polymerization process) as manufactured by the Polymer Corporation or equal in accordance with Electric Boat Division Specification 2000. (Properties Specified Below Only) Item Property Test Method Value (A) Melting Point ASTM E794 or ASTM D3418 221 deg C +/- 9 (B) Relative Viscosity ASTM D789 (Notes 1 and 4) 2000 Minimum (C) Specific Gravity ASTM D792 1.15-1.17 at 23 deg C (D) Dimensional Change Notes 2 & 4 0.2% Maximum (E) Tensile Impact ASTM D1822 Type S 80 ft-lbs/in'2 Specimen (Notes 5 & 6) Minimum (Note 3) (F) Tensile Yield Stress ASTM D638 (Note 6) 9000 psi Min. (Note 3) (G) Compressive Strength^ ASTM D695 (Note 6) 9000 psi Min. (Note 3) ^(at 1 percent Offset) (H) Water Absorption 24 hour ASTM D570 1.3 percent Maximum Saturation ASTM D570 7.0 percent Maximum (I) Rockwell "M" Hardness ASTM D785 75 Minimum Note 1: The test specimen must be finely ground particulates. After immersion the material must be checked daily for dissolution and must dissolve no longer than one hundred twenty (120) hours from the start of immersion. Within twenty-four (24) hours of the test specimen determined to be fully dissolved, it must be tested for viscosity. Note 2: Dimensional stability testing must be performed in accordance with the dimensional stability method per ASTM D5989 or equivalent. The percent change in each dimension, outside diameter, inside diameter and thickness must not be greater than the value specified. Note 3: These values are minimum averages. Separate specimens results may vary by 25%. Note 4: Any change to an already established heat or annealing cycle to achieve both relative viscosity and/or dimensional stability must be presented to the procuring activity for approval along with justification for the change. Note 5: Tensile-impact test specimens are to be type S in accordance with ASTM D1822, or round cylindrical specimens in accordance with MIL-DTL-32286, Paragraph 3.8 Note 6: Prior to test, the specimens must be dried in accordance with Federal Specification L-P- 410A, Paragraph 4.4.5. Part - ;Access Cover, Part Number 4C, with details on drawing 7016077 (Item 4); Material - ;EB SPEC 2937 or ASTM-B564, alloy UNS N06625 (In accordance with Supplementary Note S2.A. on Drawing 7016077); Part - ;Stems, Part Number 5C, with details on drawing 7016077 (Item 5); and Part Number 107C, with details on drawing 7016077 (Item 107); Material - ;SAE AMS 6931, composition TI-6AL-4V, (In accordance with Supplementary Note S2.B. on Drawing 7016077); Part - ;Stud, Continuous Thread, Part Number 8C, modified to drawing note 7027 and with details on drawing 7016077 (Item 8); Material - ;QQ-N-286; PART - ;Nut, Self Locking, Part Number 9, with details on drawing 7016077 (Item 9); MATERIAL - QQ-N-281, class A annealed (hot finished or cold drawn) or class B cold drawn. All material must be from the same class. SELF-LOCKING ELEMENT- ASTM-D4066, Group 01, Class 1, Grade 1 Part - ;Disc, Part Number 14C, with details on drawing 7016077 (Item 14); Material - ;EB SPEC 2937 or ASTM-B564, alloy UNS N06625 (In accordance with Supplementary Note S2.A. on Drawing 7016077); 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - ;Ultrasonic Inspection for Soundness (Prior to any machining); Item - ;Body, Part Number 90-1C (100% of each Body); Performance - ;T9074-BD-GIB-010/0300 Appendix E; Acceptance - ;T9074-BD-GIB-010/0300 Appendix E; Test - ;Magnetic Particle Inspection (After final machining); Item - ;Body, Part Number 90-1C; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Ultrasonic Inspection on Starting Material; Item - ;Ball, Part Number 123C; Performance - ;SAE-AMS-2631 Class B; Acceptance - ;SAE-AMS-2631 Class B; Test - ;Ultrasonic Inspection (before final machining); Item - ;Stems, Part Numbers 5C and 107C; Performance - ;SAE AMS-6931 and SAE AMS-2631; Acceptance - ;SAE AMS-2631; Test - ;Dye Penetrant Inspection (after final machining); Item - ;Stems, Part Numbers 5C and 107C; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Ultrasonic Inspection (prior to machining); Item - ;Access Cover, Part Number 4C; Disc, Part Number 14C; Safe End, Part Number 90-4C; Upper Bushing, Part Number 90-6C; Performance - ;Supplementary note S2.A.(5).(A) of drawing 7016077; Acceptance - ;Supplementary note S2.A.(5).(A) of drawing 7016077; Test - ;Dye Penetrant Inspection (after final machining); Item - ;Access Cover, Part Number 4C; Disc, Part Number 14C; Safe End, Part Number 90-4C; Upper Bushing, Part Number 90-6C; Performance - ;T9074-AS-GIB-010/271 and Supplementary note S4.D of drawing 7016077; Acceptance - ;Supplementary note S2.A.(5).(B) of drawing 7016077; Test - ;Liquid Penetrant Inspection; Item - ;Stud, Continuous Thread, Part Number 8C; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Dye Penetrant Inspection for Non-Magnetic Grades; Item - ;Nut, Part Number 9; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent removal techniques must not be used on thread) Acceptance - ;NASM25027; Attribute - Annealing and Age Hardening Item - ;Stud, Continuous Thread, Part Number 8C; Performance - QQ-N-286 Test - ;Alloy Identity Test; Item - ;Access Cover, Part Number 4C; Disc, Part Number 14C; Safe End, Part Number 90-4C; Performance - ;Paragraph 4.6 of Electric Boat Specification 2937; Acceptance - ;Paragraph 4.6 of Electric Boat Specification 2937; Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027; Acceptance - ;NASM25027; Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ;ASTM-D4066, Group 01, Class 1, Grade 1; Attribute - Certificate of Compliance Item - Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. Test - Pressure Tests Item - Each Assembly Performance - ;Supplementary Note S5 of Drawing 7016077; Acceptance - ;Supplementary Note S5 of Drawing 7016077; Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - Quality Conformance/Compliance Inspection Item - ;HY-100 starting material; Performance - ;T9074-BD-GIB-010/0300; Acceptance - ;T9074-BD-GIB-010/0300; Attribute - ;Eddy Current Test; Item - ;Cladding Thickness for joints: J0207, J0210, J0218, and J0219; Performance - ;Supplementary Note S3.E.(5).(A) of drawing 7016077; Test - ;Visual and Magnetic Particle Inspection (Root and Final Layer); Item - ;Joints: J0201, J0202, J0203, J0204, J0205 and J0206; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Visual and Dye Penetrant Inspection (Final Layer After Machining) (Cladding); Item - ;Joints: J0207, J0208, J0209; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;MIL-STD-2035, Class 2; Test - ;Visual and Dye Penetrant Inspection (Final Layer After Machining) (Cladding); Item - ;Joint: J0210; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;MIL-STD-2035, Class 2; Test - ;Dye Penetrant Inspection (Root); Item - ;Joints: J0211 and J0216; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Visual and Dye Penetrant Inspection (Final Layer); Item - ;Joints: J0211 and J0216; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Visual and Dye Penetrant Inspection (Root and Final Layer) (Cladding); Item - ;Joints: J0212, J0213; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 2; Test - ;Visual and Dye Penetrant Inspection (Root and Final Layer) (Cladding); Item - ;Joints: J0214 and J0215; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 1; Test - ;Visual and Dye Penetrant Inspection (Root); Item - ;Joint: J0217; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 1; Test - ;Visual and Dye Penetrant Inspection of Inner diameter and Outer Diameter (After Machining); Item - ;Joint: J0217; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 1; Test - ;Visual and Dye Penetrant Inspection (Final Layer After Machining) (Cladding); Item - ;Joints: J0218 and J0219; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Visual and Dye Penetrant Inspection (Final Layer After Machining) (Cladding); Item - ;Joints: J0220 and J0221; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 1; Test - ;Dye Penetrant Inspection of Inner diameter and Outer Diameter (After Machining); Item - ;Joint: J0222; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 2; 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 Radiography is required on ;Joint J0217 and must be identified to the weld joint; . 3.6 ;NAVSEA letter 08M/90-08645 dated 10 May 1990 is not necessary for the subject contract.; 3.7 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;4384676 Revision C; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.8 ;The seat thickness must be 1.582 +/- 0.005 inches for Seats, Part Numbers 114 and 115 on drawing 6985328. The stack height requirement of ER7016077B66 does not apply.; 3.9 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.10 ;Applicable portion of Stem, Part Number 107C, must be Teflon coated in accordance with note 2.C. of General Notes Drawing 5959311.; 3.11 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.12 ;Surface waviness must be verified prior to Teflon coating.; 3.13 Chemours Company (formerly DuPont) Teflon Coating 850G-204 and 852G-201. Use of Chemours Company (formerly DuPont) Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;2.C; of drawing ;5959311; . 3.13.1 Naval Ordnance Systems Command OD 10362 First Revision dated 15 Aug 1961 is provided by Contract Support Library Reference Number CSD018 in ECDS at https://register.nslc.navy.mil/ 3.13.2 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing. 3.14 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099; in ECDS at https://register.nslc.navy.mil/ 3.15 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.16 Forging Sketches and FAT for Forgings - Forging Sketches and First Article Testing for forgings are required for ;Safe End, Part Number 90-4C, Upper Bushing, Part Number 90-6C, Access Cover, Part Number 4C and Disc, Part Number 14C; per ;Supplementary Notes S2.A.(2) and S2.A.(3) of Drawing 7016077; . 3.17 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 88A100240X; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.18 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.18.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.18.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.19 K-MONEL Fasteners - K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as required by MIL-DTL-1222. (The Hardness tests must be performed on a full size fastener.) 3.19.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222. 3.19.2 Headed fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order. 3.20 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.21 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.21.1 In order to qualify for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar. c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar. e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e. 3.21.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the "Alternate Mechanical Testing" provision. 3.21.3 Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above. 3.22 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.22.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.22.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.22.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.23 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.24 Specification Change - For QQ-N-281, Class B material: 1 - Footnote 9 to Table II of QQ-N-281 does not apply. 2 - When starting material is Round Bar greater than 3" dia, the mechanical properties of Hex Bar apply. 3.25 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.26 Certification is required for the following as identified further below: - Process Control Plan - Qualification Plan - Qualification Testing (First Article) All manufacturing facilities which have been approved to an earlier revision of this specification are required to meet the recertification requirements of T9074-BD-GIB-010/0300 Revision 2. An updated Process Control Plan incorporating any changes necessary to meet the requirements of T9074-BD-GIB-010/0300 Revision 2 must be submitted. Re-certification of the first article approval of vendor facilities, processes, and manufacturing methods is required every 5 years and must meet all the requirements of T9074-BD-GIB-010/0300. The certification must be current at the delivery date of procured products. 3.26.1 Qualification Testing (First Article Inspection) - See DI-NDTI-80809 (First Article Test Report) - Certification is required for the following test on the items listed below: Test - First Article Inspection Item - ;HY-100 Starting Material; Performance - T9074-BD-GIB-010/0300 Acceptance - T9074-BD-GIB-010/0300 Previous FAT approvals that were based upon previous specifications are not valid for meeting the requirements of T9074-BD-GIB-010/0300 Revision 2, unless otherwise approved by NAVSEA. The Contractor may request the FAT submission requirement be waived by providing the PCO with evidence of NAVSEA approval, provided it meets the requirements of this contract/purchase order. 3.26.2 Process Control Plan - See DI-NDTI-80809 (Process Control Plan) - Certification is required for the following attribute on the items listed below: Attribute - Process Control Plan Item - ;HY-100 Starting Material; Performance - T9074-BD-GIB-010/0300 The PCP must be reviewed and approved by NAVSEA prior to initiating First Article Testing. The Contractor may request the PCP submission requirement be waived by providing the PCO with evidence of NAVSEA approval. 3.26.3 Qualification Plan - See DI-NDTI-80809 (Qualification Plan) - Certification is required for the following attribute on the items listed below: Attribute - Qualification Plan Item - ;HY-100 Starting Material; Performance - T9074-BD-GIB-010/0300 The QP must be reviewed and approved by NAVSEA prior to initiating First Article Testing. The Contractor may request the QP submission requirement be waived by providing the PCO with evidence of NAVSEA approval. 3.27 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286 material and material to manufacture the Ball, Item 123C; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.28 Welding - When welding processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with T9074-AD-GIB-010/1688 by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding. 3.29 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.30 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.30.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.30.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.30.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.31 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.32 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.32.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.33 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.34 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.34.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.34.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.34.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.34.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.34.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.35 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.35.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.35.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.36 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.36.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.36.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.36.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.36.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.36.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.37 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.37.1 Visual examination upon receipt to detect damage during transit. 3.37.2 Inspection for completeness and proper type. 3.37.3 Verification of material quality received. 3.37.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.37.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.37.6 Identification and protection from improper use or disposition. 3.37.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.37.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.37.9 Material returned to the contractor must be handled as GFM. 3.38 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.38.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.39 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.39.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.39.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.39.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.39.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.40 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.40.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.40.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. 3.40.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.40.4 ELECTRONIC SIGNATURES. 3.40.5 Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. 3.40.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. 3.40.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.40.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.40.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.40.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.40.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.40.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.40.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.40.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.41 Material Handling - The written material control process must include the following: 3.41.1 All raw materials must have traceability markings (except as specified below). 3.41.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.41.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.41.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to spe

Similar Contracts

Same NAICS industry code

NAICS: 332919
New
Federal
48--VALVE, GLOBE, REGThis contract pertains to the procurement of a globe control valve under solicitation N0010426REA76, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical division, and is structured as a firm-fixed-price agreement with mandatory compliance to specific military and industry standards. The contractor must adhere to detailed technical and quality assurance requirements outlined in the Individual Repair Part Ordering Data (IRPOD), which takes precedence over other contract documents in case of conflict, with an established order of precedence for resolving discrepancies among cited specifications, drawings, and standards. All technical data, including drawings, STRs, and repair part documentation, must be obtained from the secure logistics website, requiring pre-registration and password access, and contractors are prohibited from combining revisions of documents unless approved by the Contracting Officer. The contractor is required to implement and maintain a government-acceptable inspection system, retain complete inspection records, and comply with packaging specifications under MIL-PRF-23199 and MIL-STD-2073, particularly regarding cleanliness controls and the use of heat-sealed envelopes, while the use of fire retardant packaging is explicitly excluded. The contract requires submission of pre-manufacturing procedure packages and certified test and inspection reports within specified timelines—45 days after award and at contract end date respectively—and mandates separate submission packages for each unique contract, NSN, and item combination. All deliverables must conform to DD Form 1423 data requirements, including correct use of inspection and acceptance codes, distribution statements, and submission frequency indicators, with pricing governed by one of four data groups based on usage and development effort. The government retains the right to impose a stop-work order, and stringent security and cybersecurity maturity certifications apply. Vendor waivers or deviations from technical requirements must be formally submitted with full technical justification and supporting data, and must be reviewed by the Quality Assurance Representative before being forwarded to the Post-Award Contracting Officer. The offeror must submit a complete, signed proposal prior to the August 28, 2026 deadline, and pricing is valid for 60 days post-closing unless otherwise specified. Small business representation is required, mercury is prohibited in materials, and all contractual documents are considered issued upon electronic transmission. Failure to comply with any requirement, including those related to equal opportunity, security prohibitions, or cybersecurity certification, may result in disqualification or contract non-performance.
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
REDUCER,PIPEThis contract, issued under solicitation number N0010426QFG37 by the Naval Supply Systems Command Weapon Systems Support at Mechanicsburg, Pennsylvania, is a combined solicitation for a pipe reducer designated as SPECIAL EMPHASIS material, Level I, due to its critical role in shipboard systems where failure could result in catastrophic loss of life, vessel, or critical systems. The item, a 1-1/2 x 1 inch NPS reducer, must comply strictly with Buships Drawing 803-1385945, Piece 2, and be manufactured from MIL-C-15726, alloy C71500 in Temper 060 or M20-Soft, with mandatory quantitative chemical and mechanical certification traceable to heat or lot numbers. All material must be permanently marked for traceability per MIL-STD-792, with exceptions for small surfaces requiring durable tags, and all certifications must be submitted via WAWF to Portsmouth Naval Shipyard under DODAAC N50286, with inspection and acceptance authority held by N39040 and notification via PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped without prior written acceptance. The contractor must maintain an ISO-9001 quality system aligned with ISO-10012 and ISO/IEC 17025 calibration standards, with documented procedures available for government audit, and must permit Government Quality Assurance at source. All welding and brazing, including repair and production, must follow S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, with procedures and welder qualifications submitted for Navy approval prior to any work. Weld filler metal must be certified with lot numbers and conformity statements, and all welds require NDT certification tied to joint and layer. The contract demands 100% verification of material certifications, traceability markings, and NDT reports, with zero-defect acceptance sampling per ANSI/ASQ Z1.4. Waivers and deviations must be formally submitted via email, classified as Critical, Major, or Minor, and approved by the Contracting Officer. The order is DO-rated under the Defense Priorities and Allocations System, subject to Emergency Acquisition Flexibilities, and mandates strict adherence to Buy American and Mercury-Free requirements. The full submission deadline
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE/ACTUATOR ASSYThis contract pertains to the repair of a VALVE/ACTUATOR ASSY under solicitation N0010426QLC26, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The Government requires a Repair Turnaround Time (RTAT) of 180 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, to final Government acceptance. Delivery is FOB Origin, and all freight is managed by Navy CAV or Proxy CAV per NAVSUPWSSFA24 or NAVSUPWSSFA25. The contract mandates Government Source Inspection, and any failure to meet the RTAT without excusable cause will result in a per-unit, per-month price reduction, up to a specified maximum limit, with no limitation on other remedies including termination for default. The offering must include a firm-fixed-price quote with unit and total pricing, along with the proposed RTAT, and if longer than 180 days, an explanation of capacity constraints. The contract incorporates numerous mandatory clauses including Buy American Act requirements, cybersecurity maturity model certification, Small Business Subcontracting Plan, Security Prohibitions and Exclusions, and Mandatory Use of Workflow Pro (WFP) Mod Assist Module. All repairs must adhere to the original manufacturer’s specifications and drawings, and items must be marked in compliance with MIL-STD-130 Rev N. Substitutions of parts require prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications for changes. The contractor must maintain complete inspection records for 365 days after final delivery and ensure compliance with packaging standards under MIL-STD-2073. Only authorized distributors of the original manufacturer may bid, requiring proof of authorization on company letterhead. The Government reserves the right to exercise an option to increase quantities under the same unit price, and the contract is subject to reconciliation modifications for pricing adjustments due to delays. All technical documents provided are subject to distribution statements controlling accessibility, and NOFORN or Official Use Only documents require special requests through designated Navy channels.
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 4 hours
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALVThis contract pertains to the repair and refurbishment of a ball valve parts kit designated as special emphasis material due to its critical role in shipboard systems, where failure could result in catastrophic consequences including loss of life or vessel. All work must comply with stringent quality requirements, including full traceability of materials from raw stock to final assembly, with mandatory certifications for chemical and mechanical properties of components such as the ball (SAE-AMS-6931 or centrifugally cast 6AL-4V titanium) and seats (Torlon 4503, 4203, or 4203L polyamide-imide per Electric Boat Specification 4147). The repair must restore items to "like new" or "A" condition, with strict limitations on rework—specifically, balls may only be reworked to a minimum diameter of 8.359 inches, and any defects exceeding specified tolerances must be dispositioned. All welds, brazing, and surface treatments must adhere to approved procedures, with submission of qualified processes and welder certifications prior to work commencement, and chemical testing required for surface coatings to meet strict iron/nickel content limits. Contractors must maintain a certified quality management system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternatively MIL-I-45208 with MIL-STD-45662, and are subject to government quality assurance inspections at source. Material traceability is absolute: every component must bear a permanent, legible marking (MIL-STD-792), directly linking it to its certification data submitted via the Wide Area Work Flow (WAWF) system to Portsmouth Naval Shipyard (N50286) for review and approval prior to shipment. Certification data must be submitted at least 20 days prior to delivery and accepted before any material is released, with final delivery constrained to within 365 days of contract effective date. The contract mandates submission of not-to-exceed pricing, a beyond-repair cost estimate, and excludes shipping costs as government transportation is provided. Offers require a demonstrated quality control manual, and past performance is evaluated. All submissions must be electronic and traceable, and any deviations or waivers require formal approval from the Contracting Officer, classified as critical, major, or minor, with detailed justification. This is a Level I repair under a small business set-aside
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VLVThis contract pertains to the procurement of a Parts Kit for a size 2.5 inch Ball Valve, designated as SPECIAL EMPHASIS Level I material due to its critical role in a shipboard system where failure could result in loss of life, ship damage, or system failure. The item consists of a ball and two mating seats, manufactured to exacting specifications including SAE-AMS-QQ-S-763 Class 304 Condition A for the ball and Torlon 4503, 4203, or 4203L polyamide-imide for the seats, per Electric Boat Specification 4147. Strict traceability is mandated from raw material through final assembly, requiring unique heat/lot/batch markings on all components, with non-metallic seats requiring durable tagging instead of direct marking. All materials must comply with NAVSEA SS800-AG-MAN-010/P-9290 toxicity and flammability requirements, and undergo oxygen cleaning per MIL-STD-1330. The ball’s spherical surface waviness must not exceed 0.0005 inches per inch of surface, and surface waviness verification must occur prior to Teflon coating. Chemical and mechanical certification reports must be provided for all metallic components, with testing completed prior to fabrication, and certification documents must contain positive, unqualified statements of compliance with no disclaimers. The contractor must maintain a quality system compliant with ISO-9001 and either ISO-10012 or ANSI-Z540.3 with ISO-17025, or alternatively MIL-I-45208 and MIL-STD-45662, subject to government review and audit at source. All welds, brazing, and repair operations must adhere to S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, with procedures and qualification data submitted for approval before execution. Non-destructive testing, intergranular corrosion testing, and weld metallurgical verification are required for specific components, and all test records must be traceable to individual parts. A Certificate of Compliance is required for every item, including traceability to markings, contract number, NSN, and verification of compliance with all applicable specifications. Delivery requires submission of certification data through WAWF to Portsmouth Naval Shipyard, with no material permitted to
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
REPAIR MODULE,STRAIThe contract pertains to the procurement of the REPAIR MODULE, STRAI under solicitation number SPRMM126QMH07, issued by DLA Mechanicsburg under the Department of Defense, with a response deadline of August 12, 2026. It mandates strict adherence to MIL-STD-130 Rev N for marking, requires the item to be produced under the specified CAGE code 1QZK3 and reference number 080KDH-S0801211, and prohibits any design, material, or part number changes without prior written approval from the NAVICP-MECH Contracting Officer, with substitution codes clearly defined. Quality assurance responsibilities rest entirely with the contractor, who must maintain complete inspection records for 365 days after final delivery and ensure all items meet exact specifications, regardless of whether inspections are explicitly detailed. Packaging must comply with MIL-STD-2073 as referenced in the contract schedule. The procurement is conducted under Emergency Acquisition Flexibilities, allowing contractual documents to be considered issued upon electronic transmission or mail deposit, with award based on Lowest Price Technically Acceptable criteria. Contractors must submit invoices and receiving reports via PIEE-WAWF and comply with mandatory use of Workflow Pro and cybersecurity certification requirements. Non-manufacturers must disclose the OEM’s CAGE code and part number, and authorized distributors must provide proof of authorization. Inspection and acceptance occur at the source, and all materials must be delivered to the specified location without change to the F.O.B. point unless approved. The contract includes provisions for production facility changes only under strict conditions including a $250 administrative cost reduction and no impact on small business obligations or delivery timelines. Additional requirements include compliance with security prohibitions, small business representations, and adherence to controlled document handling protocols with distribution statements, including NOFORN restrictions for sensitive materials, all managed through NAVSUP WSS contacts and electronic systems like PIEE and EDA.
SPRMM1 DLA Mechanicsburg

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 332919
New
Federal
VALVE,REGULATING,FLThis contract solicitation, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, seeks repair services for the VALVE, REGULATING, FL under solicitation number N0010426QLC21. The Government requires a strict Repair Turnaround Time (RTAT) of 180 days, measured from the physical receipt of the defective asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, to final Government acceptance. Contractors must quote a firm-fixed price and guarantee this timeline, with penalties applied per unit per month for unexcused delays, up to a yet-to-be-specified maximum amount. The contract mandates Government Source Inspection, adherence to MIL-STD-130 marking standards, and compliance with all original manufacturer specifications and technical documentation. All repairs must be performed under the contractor’s approved quality system, with complete inspection records retained for 365 days after final delivery. The contract incorporates multiple Federal Acquisition Regulation clauses and DoD-specific requirements, including Buy American Act compliance, cybersecurity maturity model certification, small business subcontracting obligations, and security prohibitions. Delivery is FOB Origin, with freight handled by Navy CAV or Proxy CAV as defined in applicable NAVSUP directives. An option clause allows the Government to increase the quantity of repaired units after award, at the quoted unit price, within the timeframe specified in FAR 52.217-6. Contractors must be authorized distributors of the original manufacturer and provide proof of authorization. The contract also includes provisions for assessing a non-repairable (BR/BER) evaluation fee, not to exceed a specified limit, and requires detailed comparisons between repair cost and new unit price and lead time. All responses must include the unit price, total price, and RTAT, with any deviation from the 180-day requirement explicitly justified. The solicitation closes on July 29, 2026.
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 4 hours
View Details
NAICS: 332919
New
Federal
48--VALVE,BALLThis contract pertains to the procurement of a Level One Program ball valve, designated for critical shipboard use where failure could result in severe consequences including loss of life or vessel. The valve must comply with stringent quality and certification standards, specifically designated as SPECIAL EMPHASIS material, requiring full traceability from raw material to final assembly. All components must meet exacting material specifications including HY-100 steel, UNS N06625, UNS N10276, and Ti-6Al-4V, with mandatory chemical and mechanical certifications tied to traceable heat-lot numbers. Non-destructive testing requirements are comprehensive, encompassing ultrasonic, magnetic particle, dye penetrant, and liquid penetrant inspections at multiple stages of fabrication, with acceptance criteria defined by specific military and industry standards. Welding, brazing, and heat treatment processes are strictly controlled, with prohibitions against repair welding on certain high-integrity components. The contract mandates rigorous first article testing, qualification plans, and process control documentation, all subject to NAVSEA approval. Electronic signatures are accepted for certifications but must be uniquely authenticated and securely controlled. All material must be traceable through every manufacturing step, with permanent markings or durable tags ensuring identity from raw stock to final assembly. Delivery is required within 1,500 days ARC, with partial deliveries authorized, and includes mandatory compliance with Buy American provisions, cybersecurity maturity requirements, and national defense priorities. The contract enforces a total small business set-aside, requires offerors to hold at least a confidential security clearance due to classified annexes, and prohibits NECO bids. The procurement includes detailed specifications for O-ring grooves, Teflon coatings, thread forms, and pressure test tolerances, with all certification data submitted electronically via the ECDS system. The contracting office is NAVSUP WSS Mechanicsburg, and submissions must be sent to the designated Navy email with the original RFP.
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in 12 days
View Details
NAICS: 332919
New
Federal
VALVE,SAFETY RELIEFThis contract solicitation, issued by the Defense Logistics Agency (DLA) Mechanicsburg under solicitation number SPRMM126QGF38, seeks the manufacture and delivery of a SAFETY RELIEF VALVE in accordance with strict military and quality standards. The requirement mandates compliance with MIL-STD-130 Rev N for item marking and adherence to specified Cage Code and reference number 5P967 UB2NCNN12CMPP. All suppliers must be authorized distributors of the original equipment manufacturer, and proof of authorization must be submitted with their offer. The contract applies inspection and acceptance provisions at source, with packaging required to meet MIL-STD-2073 unless otherwise specified. The contractor is fully responsible for quality assurance, including maintaining inspection records for 365 days after final delivery, and may not alter design, material, or part numbers without prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications governing allowable changes. Delivery is subject to fixed-price terms, with award based on the Lowest Price Technically Acceptable (LPTA) evaluation method. All contractual actions, including submission of quotations, must be conducted electronically via the Procurement Integrated Enterprise Environment (PIEE), with invoices and receiving reports submitted through WAWF. Respondents are required to provide contact information, including an email for follow-up, and must disclose the OEM’s CAGE code and part number if not the manufacturer. The solicitation explicitly states that drawings and technical data are unavailable, and all applicable documents must be obtained independently via official DOD sources. Compliance with security prohibitions, small business representations, and mandatory workflow use is required, and any changes to production facilities must be formally requested and accompanied by a $250 administrative cost reduction. Electronic submission via EDI must include explicit exceptions, and failure to do so may result in award based solely on solicitation terms. Responses are due by August 28, 2026, and all documents are governed by distribution restrictions outlined in OPNAVINST 5510.1, particularly regarding NOFORN and export-controlled technical data. Registration for EDA access and notification setup through NAVSUP WSS is strongly recommended to monitor contract issuance and modifications.
SPRMM1 DLA Mechanicsburg

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALVThis contract mandates the supply of a specialized ball valve parts kit designated as SPECIAL EMPHASIS Level I material, critical to the operation of a shipboard system where failure could result in catastrophic consequences including loss of life or vessel. The kit consists of a ball and two mating seats, with strictly defined materials: the ball must be manufactured from SAE-AMS-6931 or centrifugally cast 6AL-4V titanium meeting specified mechanical properties, while the seats must be made exclusively from Mearthane Products Inc.’s MD71-GG Mearthane, with exact hardness, tensile strength, and other physical properties mandated. All materials require full chemical and mechanical certification traceable to unique heat, lot, or batch identifiers permanently marked on the components, with non-metallic seats requiring tagging instead of direct marking. The contractor must maintain an ISO-9001 quality system, validated by MIL-I-45208 or MIL-STD-45662 calibration standards, and must implement rigorous traceability controls from raw material through final assembly, including verification at every subcontracted step. All welds, brazing, and repairs require documented procedures and personnel qualifications, with submittal of weld procedure specifications and qualification data to the Navy before any work begins, and any repairs to castings or forgings require formal waiver approval. Delivery is subject to a strict 365-day timeline from contract effective date, with all certification documentation—including inspection reports, test results, and certificates of compliance—submitted electronically via WAWF to Portsmouth Naval Shipyard (N50286) and reviewed and accepted prior to any shipment. The certification must reference applicable standards, identify traceability markings on each part, and include a signed statement of full compliance without disclaimers or qualifiers, with re-certification required for any process that alters material properties. Government inspection at source is mandatory, with the Defense Contract Management Agency overseeing quality assurance and reviewing non-destructive testing procedures. The requirement is classified as a DO-rated order under the Defense Priorities and Allocations System and falls under a total small business set-aside. Access to classified drawings (Confidential level) may be required post-award, and a facility clearance may be necessary. Material handling, storage, and marking must comply with MIL-STD-792, and any use of mercury or mercury compounds is strictly prohibited. The contract enforces zero-defect acceptance criteria for inspections, 100% verification of certification data, and detailed engineering
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALVThis contract pertains to the supply of a specialized parts kit for a trash disposal unit ball valve, designated as critical safety material due to its use in a vital shipboard system where failure could result in catastrophic consequences including loss of life or the ship itself. The parts include a ball, upper seat, and lower seat, each subject to stringent material, manufacturing, and inspection requirements. The ball must conform to SAE AMS-6931 or a specific Grade C-5 centrifugally cast 6AL-4V titanium alloy with defined mechanical properties, while the seats must be made exclusively from Mearthane Products Inc.'s MD71-GG graphite-filled urethane, meeting exact hardness, tensile strength, compression, impact, and water absorption standards. All materials require full traceability from raw stock to final component via unique heat-lot or batch markings, permanently applied per MIL-STD-792, with specific marking locations mandated for each part. Certifications for chemical and mechanical properties must be provided for every lot, with no disclaimers allowed, and all test reports must directly link to the physical item through traceability identifiers. The contract mandates comprehensive quality assurance protocols, including ISO-9001 compliance with supporting calibration standards, and requires a formal quality system certified by the Government prior to production. All welding, brazing, and non-destructive testing must adhere to designated Navy specifications such as S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with procedures and qualifications submitted for advance approval. Hydrostatic testing of each ball is mandatory, with acceptance criteria tied to confidential pressures referenced only by drawing number, and alternative dye penetrant inspection allowed under strict conditions. Final acceptance requires 100% verification of certification documents, traceability markings, and test results, with zero-defect lot acceptance criteria applied. All certifications and documentation must be submitted through the Wide Area Work Flow system to Portsmouth Naval Shipyard using designated DODAACs and email notifications, with no shipment permitted without prior written acceptance. The contract further enforces Buy American provisions, Mercury-free requirements, strict control over subcontractors, and configuration management through Engineering Change Proposals, while requiring all parties to comply with classified document handling protocols per DD Form 254 for Confidential-level data. Delivery is constrained to within 365 days of contract effective date, with certifications due 20 days prior to shipment and review
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 333611
New
Federal
CASE,COMPRESSOR,NONThis solicitation, issued under Emergency Acquisition Flexibilities, seeks repair services for the CASE, COMPRESSOR, NON, with a required turnaround time of 202 days from physical receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system. Only firm-fixed-price or not-to-exceed quotes for repair are acceptable; test and evaluation pricing alone will not be considered. The contract mandates strict adherence to Item Unique Identification standards under DFARS 252.211-7003, MIL-STD-130 Marking, and MIL-STD-2073 Packaging, with all work performed by an authorized repair source. Contractors must provide a monthly throughput capacity and acknowledge a 365-day induction expiration window after award, beyond which repairs require bilateral agreement. Failure to meet the turnaround time triggers a pre-defined per-unit, per-month price reduction, with no penalty for excusable delays such as government-caused holds, and potential termination for default remains reserved. All submissions must include unit and total repair prices, new unit cost, RTAT, T&E fee caps for BR/BER items, CAGE codes for award, inspection, and shipping facilities, a cost breakdown with profit rate, and an expiration date of at least 90 days. Submission is exclusively via email to KATE.C.HEIDELBERGER.CIV@US.NAVY.MIL, with mandatory compliance with Wide Area Workflow Payment Instructions and mandatory use of Workflow Pro’s Assist Module. The solicitation is a total small business set-aside issued under Deviation 2026-O0037, and the awardee must be an authorized distributor of the original manufacturer’s item, requiring proof of authorization on company letterhead. The contract incorporates military standards for inspection, quality assurance, and documentation retention for 365 days post-final delivery, and requires precise reporting of asset transactions in CAV within five business days of receipt. Distribution of technical data is controlled under OPNAVINST 5510.1 with designated distribution codes, and requests for “NOFORN” or “Official Use Only” documents must be submitted through proper channels. The contracting office is located in Mechanicsburg, PA, with performance tied to Navy CAV or Proxy CAV logistics, and all responses are due by August 28, 2026.
Turbine and Turbine Generator Set Units Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
JACKBOX SWITCHThis contract pertains to the manufacture of the JACKBOX SWITCH, identified by part number 62107-0001, under solicitation N0010426QAC19 issued by the Navsup Weapon Systems Support Mech office in Mechanicsburg, PA. The contract mandates strict adherence to military standards for design, marking, and configuration control, requiring compliance with MIL-STD-130 for mechanical parts, MIL-STD-1285 for electrical and electronic components, and MIL-STD-973 for configuration management, including formal submission of engineering change proposals, deviations, and waivers. All items must meet specified material and physical requirements, and the contractor bears full responsibility for quality assurance, including maintaining inspection records for 365 days after final delivery. Government source inspection per FAR 52.246-2 is required, and sampling does not permit submission of defective material. Delivery is mandated within 90 days, and packaging must conform to MIL-STD-2073 as referenced in the schedule. The procurement is subject to a total small business set-aside and includes cybersecurity maturity model certification requirements, priority rating for national defense use, and specific security prohibitions. The contractor must comply with all labeling and marking standards, and sourcing is restricted to vendors listed under OD36190; substitutions require prior government testing and approval. Documentation access for controlled items, including NOFORN and classified materials, must follow specified procedures through designated government offices. Payment instructions are routed through Wide Area Workflow using the provided email, and all contractual documents are considered officially issued upon electronic transmission. The contract incorporates current and applicable government regulations, deviations, and certifications effective through 2026, with the response deadline set for August 17, 2026.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of a CIRCUIT CARD ASSEMBLY under a fixed-price arrangement with strict compliance requirements outlined by Department of Defense standards. The work must adhere to MIL-STD-130 for unique identification and MIL-STD-1686 for electrostatic discharge control, with repairs performed according to the contractor’s approved technical procedures and manufacturer specifications. The item must be marked properly, free of mercury contamination, and any substitution of parts requires prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications governing the nature of changes. The contractor is responsible for all inspections, must maintain detailed records for one year after final delivery, and ensure packaging complies with MIL-STD-2073. The contract includes a 1-year warranty on supplies, a mandatory requirement to use Workflow Pro (WFP) Mod Assist for payment processing, and compliance with Buy American and small business set-aside provisions. A 180-day option provision allows the government to increase the order quantity without re-solicitation, and pricing for this option must be included in the proposal. Evaluation for award will be based on the lowest aggregated total price including the option. The repair must be completed within an estimated 145-day RTAT period, encompassing both refurbishment and return shipment to the Navy. Additionally, distribution of technical documents is restricted under OPNAVINST 5510.1, with specific codes governing access, and only authorized distributors of the original manufacturer may submit offers. Security, export controls, and subcontractor compliance are tightly regulated, including prohibitions on mercury use and mandates for protective labeling if mercury is an essential component. All contractual documents are deemed issued upon electronic transmission, and failure to meet delivery timelines may result in enforceable penalties unless excused by extenuating circumstances.
Bare Printed Circuit Board Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332510
New
Federal
LOCKPLATE,F-R,2SThe contract pertains to the procurement of a Lockplate, F-R, 2S under solicitation N0010426QEC09, issued by the Naval Supply Systems Command Weapon Systems Support Mechanic, with a response deadline of August 28, 2026. Pricing is valid for 60 days after the closing date unless otherwise specified, and vendors must review the mandatory Individual Repair Part Ordering Data (IRPOD) available via the BPMI website, which requires pre-registration. The contract incorporates a hierarchy of governing documents, with contract amendments taking precedence over the schedule, terms and conditions, and then IRPOD, followed by technical specifications, drawings, and standards. Contractors must use referenced documents in their entirety and obtain prior written approval from the Contracting Officer for any deviations or use of later revisions. Compliance with cleanliness control standards such as MIL-STD-767 and MIL-STD-2041 is required where invoked, with packaging governed by MIL-PRF-23199 and MIL-DTL-24466 green poly bags under specific conditions, while fire-retardant packaging is no longer required. Mercury or mercury-containing compounds are strictly prohibited from contact with supplied hardware. Quality assurance requirements are defined in the IRPOD, and contractors must maintain complete inspection records accessible to the government throughout performance and beyond. All contractual documents are considered issued upon electronic transmission, email, or fax, with acceptance of the proposal forming a bilateral agreement. Technical data packages (TDPs) referenced via DD Form 1423 include detailed instructions on data submission, including delivery frequency, approval codes, distribution restrictions, and pricing groups, with specific codes governing inspection and acceptance authority at source or destination. Contractors must submit certified test and inspection reports per DI-QCIC-8872, in separate packages for each unique NSN and item nomenclature, and obtain PCO authorization prior to shipment. Distribution of technical documents follows DoDI 5230.24 with six defined codes limiting dissemination to U.S. government agencies, DoD contractors, or restricted entities. The contract mandates use of Wide Area Workflow for payment and requires compliance with cybersecurity maturity model certification levels, total small business set-aside provisions, and security exclusions. Transportation by sea and priority rating under national defense programs further apply. Vendor waivers or deviations must include full justification, technical data supporting the proposed change, and evaluation demonstrating no adverse impact on fit, form, or function
Hardware Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
61--FUSE BLK/EMI A11, IN REPAIR/MODIFICATION OFThis contract solicitation, numbered N0010426QDB12, solicits repair services for the FUSE BLK/EMI A11 component under a firm-fixed-price arrangement, with a mandatory Repair Turnaround Time (RTAT) of 78 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must comply with the original manufacturer’s specifications, and the contractor is required to adhere to MIL-STD-130 Rev N for item marking and MIL-STD-2073 for packaging. The Government will conduct mandatory inspections, and the contractor must maintain complete inspection records for 365 days post-delivery. Freight is FOB Origin and managed by the Navy under the CAV Statement of Work; all quotes must include unit and total prices along with the proposed RTAT, and failure to meet the 78-day requirement necessitates disclosure of capacity constraints. Repair performance is subject to a detailed subcontracting plan, Buy American provisions, cybersecurity maturity certification, and compliance with Defense Federal Acquisition Regulation Supplement clauses, including the mandatory use of Workflow Pro and the release of offeror information under Navy protocols. The awardee must hold authorization as an official distributor of the original manufacturer, and proof of authorization must accompany the proposal. The contract includes strict prohibitions against unapproved design, material, or part number substitutions, with any changes requiring written approval from the NAVICP-MECH Contracting Officer and classification under specific Code designations. Pricing must account for all costs related to repairing items in unwhole, damaged, or incomplete condition, and if an item is deemed beyond repair, a negotiated teardown and evaluation fee not to exceed a specified amount may apply. The contract also incorporates clauses on security exclusions, annual representations, cybersecurity readiness, and small business subcontracting obligations. All technical documentation referenced must be obtained through official DoD sources, with distribution restrictions governed by seven defined codes and safeguarding requirements under OPNAVINST 5510.1. Proposals are due by August 18, 2026, and the award will be bilateral, requiring the contractor’s written acceptance before execution. The award will be managed by the Navy Supply Systems Command in Mechanicsburg, Pennsylvania, and all communication must be directed to the designated point of contact.
Current-Carrying Wiring Device Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 334514
New
Federal
66--VENTURI METER, IN REPAIR/MODIFICATION OFThis contract solicitation, numbered N0010425QDE06, is for the repair and modification of a VENTURI METER under a firm-fixed-price structure, with a required Repair Turnaround Time (RTAT) of 175 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. The Government mandates strict compliance with MIL-STD-130 for item marking and requires all repairs to adhere to manufacturer specifications, authorized technical orders, and approved repair standards. The CAGE code 53711 and reference number 6128170 identify the specific item to be repaired, and any changes to design, material, or part number must be formally approved via written change order, with specific codes documenting the nature of the modification. Contracting officers will inspect and accept repaired items, and all inspection records must be maintained for 365 days post-delivery. Freight is managed by the Navy, and the contractor must accurately report asset transactions in CAV within five business days. The solicitation includes a clause requiring proof of authorization as a distributor of the original manufacturer’s item, and pricing must encompass all costs associated with repairing potentially unwhole, damaged, or incomplete units. A Teardown & Evaluation fee may be negotiated if the asset is deemed beyond repair, capped at a not-to-exceed amount yet to be specified. The Government reserves the right to exercise an option to increase quantity under the terms of FAR 52.217-6, and all awards will be issued bilaterally, contingent upon the contractor’s written acceptance. Performance is governed by the Clause 52.222-90 inclusion following the FAR overhaul, and the contract aligns with the Buy American Act and Annual Representations and Certifications, with an induction expiration deadline set at 365 days. The response deadline is August 18, 2026, and all proposals must include unit price, total price, and actual RTAT, with deviations from the government's requirement requiring documented capacity constraints. The point of contact is Aryel A. Ryan, with communications directed to the provided Navy email address.
Totalizing Fluid Meter and Counting Device Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract pertains to the repair of CIRCUIT CARD ASSEMBLY items under an emergency acquisition authority, issued as a solicitation with the number N0010426QQB83 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The requirement mandates that all repairs adhere strictly to the original manufacturer’s technical specifications, drawings, and approved procedures, with compliance governed by MIL-STD-130 for marking and ANSI/ESD S20.20 for electrostatic discharge control. All work must be performed by authorized distributors of the original equipment manufacturer, who must submit proof of authorization with their quote. The contract requires a Firm-Fixed-Price structure, with the contractor responsible for inspection, testing, and documentation throughout the repair process, and all repairs must meet a designated Return to Repair Turnaround Time (RTAT) measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system. The contract stipulates that freight is FOB Origin and handled by the Navy under the Commercial Asset Visibility Statement of Work, with Government Source Inspection mandatory. Contractors must provide detailed pricing including unit and total costs, RTAT, and justification for any pricing outside historical norms, along with comparisons between repair costs and new purchase prices. If an item is deemed beyond repair, a separate testing and evaluation fee applies, capped at a specified amount. Modifications to part numbers, materials, or design require prior written approval from the contracting officer, classified under specific change codes. All records must be maintained for 365 days post-delivery. The order is issued under and incorporates by reference any existing Basic Ordering Agreement, with BOA terms prevailing in case of conflict. The contract also enforces Buy American requirements, security prohibitions, small business subcontracting obligations, and mandatory use of Workflow Pro for payment and documentation, with all submissions due by August 28, 2026.
Bare Printed Circuit Board Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details