Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on October 5, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

48--VALVE,GLOBE

Awarded
N0010421QFD71Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332919
New
Federal
STRAINER,SEDIMENT
Solicitation # N0010426QEG40
Solicitation N00104-26-Q-EG40 is a total small business set-aside request for quotation issued by NAVSUP Weapon Systems Support Mech for the procurement of sediment strainers, NSN 4730-01-527-9800. The contract follows a lowest priced, technically acceptable award basis, with a delivery requirement of 180 days FOB Destination. Technical compliance is governed by TDP Version 004 and the Individual Repair Part Ordering Data, with a strict order of precedence placing contract amendments and the schedule of supplies above technical drawings and specifications. All items must adhere to MIL-I-45208 quality standards and MIL-STD-2073 packaging requirements, specifically requiring green poly packaging per MIL-PRF-23199. Key deliverables include a procedure package containing drawings and pre-manufacturing submittals due within 45 days after award, and a final package of Vendor Certified Reports of Test and Inspection due at the end of the contract. The contractor must maintain an inspection system acceptable to the government, with inspection and acceptance occurring at the contractor's plant. Special restrictions include a prohibition on the intentional use of mercury and strict export controls, as certain technical documents are designated as Not Releasable to Foreign Nationals. Administrative requirements include the use of the Wide Area Workflow system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, domestic preferences, and safety notifications.
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
48--VALVE ASSEMBLY,MANI, IN REPAIR/MODIFICATION OF
Solicitation # N0038325QT557
The Navy's NAVSUP Weapon Systems Support in Philadelphia is conducting market research to identify qualified contractors capable of repairing a specific commercial item used on the P-8A Poseidon aircraft, identified by NSN 7RH 4810 016062525 P8 and part number 71784. This component is a commercial common item, meaning it is unmodified from its original commercial off-the-shelf (COTS) form, and the government does not possess proprietary technical data or drawings necessary for repair. The P-8A, derived from the Boeing 737-800, incorporates both military and commercial components, and the repair requirement emphasizes the need for FAA-certified parts with proper FAA authorization from certified repair stations under 14 CFR Part 145. Interested small businesses, including service-disabled veteran-owned, HUBZone, and 8(a) firms, are encouraged to respond by providing details such as company name, Cage Code, part number, OEM status, FAA certification, technical capacity, and small business classification. The procurement may be set aside for small businesses or awarded through full and open competition based on responses. The NAICS code for this procurement is 332919. This market research is not a solicitation and does not obligate the government to award a contract; responses are voluntary and must be submitted via email by September 2, 2025. The information gathered will help determine the appropriate procurement method.
Navsup Weapon Systems Support

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QFE36
This contract pertains to the procurement of a ball valve parts kit designated as SPECIAL EMPHASIS material due to its critical role in shipboard systems, where failure could result in catastrophic consequences including loss of life or the vessel itself. The work requires full refurbishment of components to “like new” or “A” condition under a Firm Fixed Price (FFP) structure, including teardown, inspection, and repair, with a required beyond-repair pricing alternative. Material traceability is strictly enforced, mandating unique markings on all parts such as the ball and seats to link directly to chemical and mechanical test certifications. The ball must conform to SAE AMS-6931 or ASTM-B367 Grade C-5 specifications, while the seats must be manufactured exclusively from Mearthane Products Inc.’s MD71-GG material with strict limits on hardness, tensile strength, and water absorption. Welding, brazing, and Teflon coating must adhere to specific naval standards, and all procedures require prior government approval. The contractor must maintain ISO-9001 or MIL-I-45208 quality systems, with mandatory government inspection at source and submission of 100% documented test results and certificates through WAWF prior to shipment. All certification data must be submitted via the Wide Area Work Flow system to Portsmouth Naval Shipyard for review and acceptance, with no material permitted to ship until formal acceptance is granted. The delivery schedule requires submission of certification data 20 days prior to delivery, followed by a six-day review window, with final delivery due no later than 158 days after contract effective date. The contract mandates compliance with Buy American provisions, DoD prioritization (DO rating), and exclusion of mercury and mercury-containing substances. Traceability must be preserved through all manufacturing and subcontracting processes, with physical markings permitted only on certain surfaces and tagging required for delicate components. Defects on the ball stem slot are acceptable only under strict dimensional limits, and rework of the ball is confined to a minimum diameter of 8.359 inches; any further deviation results in disposition as beyond repair. The prime contractor is responsible for oversight of all subcontractors, ensuring their processes align with contract quality requirements, and all nonconformances must be documented and reported to the Government. The solicitation is issued under emergency acquisition flexibilities, with past performance considered in award decisions, and final acceptance is contingent on full compliance with every technical, quality, and documentation requirement outlined in the contract.
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QFE37
This contract pertains to the refurbishment of a critical ball valve parts kit for naval shipboard systems, where failure could result in catastrophic consequences including loss of life or vessel. The work requires full repair of components to “like new” or “A” condition under a firm fixed price, including teardown, inspection, and reassembly according to specified NAVSEA drawings 7285297 and 8617511. All materials, including a ball made from SAE AMS-6931 or centrifugally cast 6AL-4V titanium and seats made exclusively from MD71-GG Mearthane urethane supplied by Mearthane Products Inc., must meet exact chemical and mechanical properties with traceable certification. The contract mandates stringent traceability from raw material through every manufacturing step, requiring permanent, legible markings on all parts and full documentation of heat lot numbers, test results, and inspections. Material certifications must be positive, unqualified, and submitted electronically via WAWF to Portsmouth Naval Shipyard before any shipment, with final acceptance required prior to delivery. Quality assurance is governed at the highest level, classifying this as Special Emphasis Material (Level I) subject to full Government source inspection and adherence to ISO-9001, ISO-10012, and ISO/IEC 17025 standards, with MIL-I-45208 and MIL-STD-45662 as acceptable alternatives. Welding, brazing, and hardfacing must conform to S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with all procedures and welder qualifications submitted in advance. Every component must undergo 100% inspection for traceability, certification accuracy, and compliance, with zero defect tolerance during final acceptance sampling. The contract further requires submission of a beyond repair price, exclusion of mercury, compliance with Buy American provisions, and adherence to Defense Priorities and Allocations System (DPAS) ratings. All subcontractors must meet identical quality requirements, and any deviations or waivers require formal approval from the Contracting Officer. Delivery is restricted to 71 days after contract effectiveness, and all certification data must be submitted electronically via WAWF to N50286, with notifications sent to the designated Navy email. The entire process is subject to audit and oversight via the Electronic Contractor Data Submission system
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 332919
New
DIBBS
VALVE-HAND, BYPASS
Solicitation # SPE7M1-27-T-1822
Solicitation SPE7M1-27-T-1822 is a small business set-aside request for the procurement of one bypass valve hand, identified by NSN 4820015957205. The requirement is issued by the DLA Weapons Support Maritime Supply Chain with a required delivery date of November 3, 2026, and a delivery window of five days after award. This is a restricted source item requiring engineering source approval from the government design control activity, with approved sources including Control Solutions LLC and AMZ Alabama Inc. Delivery is specified as FOB Origin, with the shipping and parcel destination located at the NAVSUP Weapon Systems Support Joint Consolidation Point in Mechanicsburg, Pennsylvania. The contract mandates strict adherence to technical and quality standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must follow DLA packaging requirements under RP001. Inspection and acceptance will occur at the point of origin. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Compliance with various FAR and DFARS clauses is required, including those regarding the Buy American Act, cybersecurity incident reporting, and the prohibition of Class I ozone-depleting chemicals. Offerors must be registered in the System for Award Management and may be subject to the HUBZone price evaluation preference.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 21 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$41,480.46

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

1

N0010421QFD71.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

NAICS code changed from 333999 to 332919.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA
Contacts

Full Description

Show more
CONTACT INFORMATION|4|N743.28|WVA|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS C AND E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| INSPECTION/ACCEPTANCE POINT|6||||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|42|548 DAYS|548||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|SEE DD 1423|contact@example.gov| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (SEP 2021)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited inthe mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed here in. This item requires Oxygen Cleaning and/or Navy Source Certification. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (548 days) Delivery days and past performance will be evaluation factors in determining awardee. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;M3171-1194A 0ASY6 B B DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A276 | | | |170315|A| | | DOCUMENT REF DATA=ASTM-A582 | | | |170315|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-1330 | | |D |070628|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-PRF-27617 | | |F |980217|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Complete 1/4 Inch 6000 psi Gauge Valve to be in accordance with Derbyshire Marine Products Drawing M3171-1194A, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body; Piece No. 1; Material - ;SAE AMS-QQ-S-763 Class 316 Condition A or 316L Condition A; Part - ;Bonnet; Piece No. 2; Material - ;ASTM A582 UNS S41600 Condition A; Part - ;Stem; Piece No. 3; Material - ;SAE AMS-QQ-S-763 Class 316 Condition A; Part - ;Bonnet Nut; Piece No. 4 and Cap; Piece No. 8; Material - ;SAE AMS-QQ-S-763 Class 304 Condition A or ASTM-A582 Type 303; Part - ;Nut; Piece No. 16; Material - ;ASTM A276 UNS S31600; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - Pressure Tests Item - Each Assembly Performance - ;General Note 8 for HYDROSTATIC TEST and General Note 9 for SEAT TIGHTNEES TEST; Acceptance - ;General Note 8 for HYDROSTATIC TEST and General Note 9 for SEAT TIGHTNEES TEST; Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Body; Piece No. 1, Stem; Piece No. 3, Bonnet Nut; Piece No. 4 and Cap; Piece No. 8; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. 30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes. 3.5 Oxygen Cleaning - This material must be cleaned, tested, packaged & labeled by trained personnel and procedures in accordance with MIL-STD-1330. 3.6 ;The stem bonnet lubricant must be MIL-PRF-27617 Type III.; 3.7 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.8 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;887056091; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.9 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.10 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.11.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.12 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.13 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.13.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.13.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.13.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.14 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.15 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.16 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.16.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.16.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.16.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract. 3.16.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.16.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.16.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.16.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.16.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.16.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.16.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.16.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.16.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.17 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.17.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.17.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.17.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.17.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.17.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.18 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.18.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.18.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.19 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.19.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.19.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.19.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.19.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.19.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.20 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.20.1 Visual examination upon receipt to detect damage during transit. 3.20.2 Inspection for completeness and proper type. 3.20.3 Verification of material quality received. 3.20.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.20.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.20.6 Identification and protection from improper use or disposition. 3.20.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.20.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.20.9 Material returned to the contractor must be handled as GFM. 3.21 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.21.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.22 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.22.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.22.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.22.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.22.4 ...

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 334417
New
Federal
SWITCH CONNECT ASSY
Solicitation # N0010426QEC48
The contract pertains to the procurement of SWITCH CONNECT ASSY under solicitation N0010426QEC48, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical (NAVSUP WSS-MECH) under the Department of Defense. Pricing is valid for 60 days post-closing date unless otherwise specified, and vendors must review the mandatory Individual Repair Part Ordering Data (IRPOD) via the BPMI e-Commerce site, requiring pre-registration and password access. The technical requirements are governed by the IRPOD, drawings, specifications, and Military Standards referenced in the solicitation, with strict order of precedence established: contract amendments supersede the schedule, which supersedes terms and conditions, and so on down to referenced documents. Contractors must use full revisions of all cited documents unless prior written approval is obtained from the Contracting Officer for deviations. Compliance with cleanliness standards such as MIL-STD-767 and MIL-STD-2041 dictates packaging requirements under MIL-PRF-23199, with specific use of MIL-DTL-24466 green poly bags permitted only under defined conditions. Mercury or mercury-containing compounds are strictly prohibited from contact with the supplied hardware. Quality assurance is governed by the IRPOD, and contractors must maintain complete inspection records available for government audit throughout performance and beyond. All contractual documents are deemed issued upon electronic transmission, including email or other commercial methods, and government acceptance constitutes bilateral agreement. Technical data and drawings marked NOFORN are subject to export controls and require prior approval from Naval Sea Systems Command for any release to foreign nationals. Distribution statements for unclassified documents fall under six defined codes, with F limiting distribution to U.S. entities only. Deliverables require submission of Certificates of Compliance per DI-MISC-81356 with each shipment, and the DD Form 1423 governs technical data package requirements including inspection and acceptance codes, submission frequency, and pricing groups. Small business representations are mandated under DEV 2026-O0037, and cybersecurity maturity certification requirements apply. The award is subject to a total small business set-aside, equal opportunity provisions for veterans and workers with disabilities, and prohibitions on the use of certain materials and labor practices including child labor. Packaging must comply with MIL-STD-2073 where applicable, and fire-retardant materials are no longer required. Vendors must comply with all terms regarding delivery timelines, waiver requests, and technical
Electronic Connector Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS