Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 20, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

48--VALVE,SOLENOID, IN REPAIR/MODIFICATION OF

Awarded
N0038323QH101Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332919
New
DIBBS
COUPLING HALF, QUICK
Solicitation # SPE7M3-27-T-0769
This solicitation, issued by the DLA Weapons Support Fluid Handling Division, is for the procurement of one quick coupling half, identified by NSN 4730-01-579-8245. The requirement specifies a delivery timeframe of 20 days after order, with an original required delivery date of May 31, 2024. The item is to be delivered FOB Origin to the Armament Inspectorate in Warszawa, Poland. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically prohibiting the use of additive manufacturing unless authorized and restricting the intentional addition of mercury or mercury-containing compounds. Compliance requirements are extensive, including CMMC Level 2 Self-Assessment, safeguarding of covered defense information, and adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging. Inspection and acceptance are both set at the point of origin, with Certificate of Conformance procedures authorized under FAR 52.246-15. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with the Buy American Act and Balance of Payments Program for quotes exceeding the micro-purchase threshold. The solicitation is open to full and open competition, with specific price evaluation preferences noted for HUBZone small business concerns.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 5 hours ago

DEADLINE

in 11 days
NAICS: 332919
New
Federal
47--CONNECTION,FLEXIBLE
Solicitation # N0010426QYAGN
Solicitation N0010426QYAGN, issued by NAVSUP Weapon Systems Support Mechanicsburg, is a request for quotations for the manufacture and delivery of flexible connections (NSN 4730-01-144-5975). The required items must conform to the design represented by Cage Code 18444, reference number 299941-100. A critical technical requirement is that all materials must be mercury-free, as they are intended for use on submarines and surface ships. The government retains an option to order an additional quantity of up to 100 percent of the original order for 365 days after receipt at the same price. The closing date for the receipt of offers has been extended via multiple amendments to December 14, 2026, at 4:30 PM local time. The resulting award will be a bilateral agreement requiring written acceptance from the contractor. Offerors who are not the Original Equipment Manufacturer must provide the OEM's company name, CAGE code, and a signed letter of authorization. Evaluation of quotations will be based on supplier performance risk via the Supplier Performance Risk System (SPRS) and compliance with Buy American and Trade Agreements policies. Quality assurance requires inspection and acceptance at the origin, with mandatory physical identification per MIL-STD-130 and packaging according to MIL-STD-2073. Invoicing and payment must be processed electronically through the Wide Area Workflow (WAWF) system.
Navsup Weapon Systems Support Mech

POSTED

about 10 hours ago

DEADLINE

in about 2 months
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QNE98
This solicitation, issued by NAVSUP Weapon Systems Support Mechanicsburg, is for the procurement of 175 ball valve parts kits (NSN 4820-01-425-4163). The material is designated as Special Emphasis Level I, meaning it is used in crucial shipboard systems where failure could result in serious personnel injury, loss of life, or loss of the vessel. Consequently, the contract mandates strict quality assurance, including a requirement for the contractor to maintain a quality system compliant with ISO-9001 or MIL-I-45208. The kits consist of a ball made from SAE-AMS-6931 and seats made from MD71-GG Mearthane, both requiring rigorous quantitative chemical and mechanical analysis. Key technical requirements include hydrostatic testing for each ball at 1875 PSI for 30 minutes, with dye penetrant inspection as an acceptable substitute for manufacturers lacking test fixtures. All welding and brazing must adhere to specific S9074 and 0900-LP standards, requiring prior approval of qualification data. The contractor must submit a Certificate of Compliance and all objective quality evidence via the Wide Area Workflow (WAWF) system to Portsmouth Naval Shipyard for review and acceptance before shipping. Final inspection follows a zero-defect acceptance policy, with sampling based on ANSI/ASQ-Z1.4. The government intends to make a single fixed-price award based on the most advantageous offer, prioritizing past performance over price. Packaging must comply with MIL-STD-2073-1, and all shipments must be prepaid to the destination. Offerors must provide a Quality Assurance Manual to be eligible for award and must certify that the materials are mercury-free. All configuration changes or deviations require formal review and approval by the Contracting Officer through Engineering Change Proposals or waiver requests.
Navsup Weapon Systems Support Mech

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
STEM,FLUID VALVE
Solicitation # N0010426QZB64
Solicitation N00104-26-Q-ZB64 is a fixed-price request for quotations from NAVSUP Weapon Systems Support for the manufacture of a Fluid Valve Stem (NSN 4820-01-496-3210). This item is designated as a Critical Safety Item and Special Emphasis Material Level I, as its failure could result in catastrophic loss of life or the ship. The government will provide the necessary barstock (NIIN 014959538X2) as Government Furnished Material, and the contractor must maintain strict heat traceability throughout production. The stem must be manufactured in accordance with NAVSEA drawing 803-5959307 and related specifications, using ASTM-B348 Grade 23 or SAE-AMS-4931 material. Weld repairs on titanium parts are strictly prohibited. The contract mandates rigorous quality assurance and certification standards, requiring a quality system compliant with ISO-9001 and specific calibration standards such as ISO-10012 or ANSI-Z540.3. Key requirements include dye penetrant inspection, a zero-defect lot acceptance policy, and the submission of a comprehensive Certificate of Compliance and test results via the Wide Area Workflow system prior to shipment. All deliverables must be preserved and marked according to MIL-STD-2073 and MIL-STD-129. Award will be made to the most advantageous offeror, with past performance weighted as more important than price.
Navsup Weapon Systems Support Mech

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 332919
New
Federal
48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF
Solicitation # N0010427QZA04
This fixed-price contract, solicitation number N00104-27-Q-ZA04, is issued by the Navsup Weapon Systems Support Mech for the manufacture or refurbishment of hydraulic actuators. The scope of work requires the contractor to inspect, clean, and refurbish the items in accordance with Drawing 30093-40940 and MS NO. 5640-081-346 REV A CHG-4. Final delivery of the material must be completed within 86 days of the contract's effective date, with the ship-to destination located in Kittery, Maine. The award is designated as a DO rated order under the Defense Priorities and Allocations System, signifying its importance for national defense. Key requirements include physical identification per MIL-STD-130 and strict adherence to preservation, packaging, and marking standards such as MIL-STD-2073-1 and MIL-STD-129. If additive manufacturing is utilized, the contractor must provide comprehensive traceability data via DD1423 reporting. The contract includes a one-year warranty for supplies of a noncomplex nature and mandates the use of the Wide Area Workflow (WAWF) system for electronic invoicing and receiving reports. Evaluation for award is based on the Supplier Performance Risk System, assessing item, price, and supplier risk. All transportation to and from the repair site is paid for by the US Navy.
Navsup Weapon Systems Support Mech

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
STEM, VALVE
Solicitation # N0010426QNE90
This solicitation, issued by NAVSUP Weapon Systems Support Mechanicsburg, is for the procurement of a Valve Stem (NSN 1HM 4820-01-548-5698) to be delivered within 120 days. The item is designated as Special Emphasis material (Level I, Scope of Certification) because it is used in crucial shipboard systems where failure could result in catastrophic loss of life or vessel. Due to this criticality, the contract mandates strict quality controls, including a requirement for the contractor to maintain an ISO-9001 quality system and undergo Government Quality Assurance at source via the Defense Contract Management Agency. Technical requirements specify the use of ASTM-B150 Alloy C63200, mandatory oxygen cleaning per MIL-STD-1330, and a strict mercury-free composition. The award will be made to the offeror determined to be most advantageous to the Government, with past performance weighted as more important than price. Key deliverables include the hardware and comprehensive test certifications submitted via Wide Area Workflow (WAWF) to the Portsmouth Naval Shipyard for review and acceptance prior to shipment. Packaging must adhere to MIL-STD-2073 and MIL-STD-129 standards, with specific red labeling for Level 1 materials. The procurement is DO certified for national defense under the Defense Priorities and Allocations System and is conducted as a simplified acquisition.
Navsup Weapon Systems Support Mech

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
VALVE,REGULATING,FL
Solicitation # SPRMM127QKA27
This fixed-price solicitation, issued by DLA Mechanicsburg under solicitation number SPRMM127QKA27, requires the manufacture and delivery of two regulating valves (VALVE,REGULATING,FL) based on the design represented by Cage Code 99643, reference number 84140-1. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) criteria, with a 10 percent price evaluation preference applied to HUBZone small business concerns. Offerors must be authorized distributors of the original manufacturer and are prohibited from providing refurbished material. Technical drawings are not available for this item, and the contractor is responsible for ensuring the product meets all quality requirements, including physical identification per MIL-STD-130 and packaging according to MIL-STD-2073-1. The contract mandates the use of PIEE-WAWF for the electronic submission of invoices and receiving reports, and any requests for modifications must be processed through the Workflow Pro (WFP) Mod Assist module. Inspection and acceptance will occur at the origin. Key compliance requirements include CMMC Level 1 self-certification, adherence to the Buy American Act, and strict prohibitions relating to Chinese military companies. Contractors must maintain inspection records for 365 days following final delivery and are required to provide the Original Equipment Manufacturer's CAGE code and part number when submitting quotes.
SPRMM1 DLA Mechanicsburg

POSTED

about 10 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$27,602.16

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

1

N0038323QH101.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N722.18|B4P|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo|Source|TBD|N00383|TBD|TBD|See Schedule|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (JAN 23)|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This is a requirement for the repair of NIIN 013193027. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 43 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 000 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Price Reductions Any assets for which the contractor does not meet the required RTAT will incura price reduction of XXXX per unit. This adjustment will be implemented via aReconciliation Modification at the end of contract performance. Pricereductions made pursuant to this section shall not limit other remediesavailable to the Government for failure to meet required RTATs, including butnot limited to the Government's right to terminate for default. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 1.6 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.6.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: VALVE,SOLENOID ;VALVE,SOLENOID 4810-013193027; NSN , ;59211 27441482-04; Part Number, Shall be performed IAW: VALVE,SOLENOID ;N/A; Publication (s). 1.6.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.7 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;PARKER HANNIFIN; drawing number ( ;59211; ) ;27441482-04; , Revision ;LATEST; and all details and specifications referenced therein. 1.8 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.9 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: VALVE,SOLENOID ;27441482-04; P/N, ;4810-01-319-3027; NSN, ;ALL REPAIR MANUALS, DRAWINGS, AND SPECIFICATIONS.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. VALVE,SOLENOID ;PARKER HANNIFIN CUSTOMER SUPPORT MILITARY DIVISION; Company Name , ;4300 ALTON PARKWAY IRVINE STATE: CA 92618-1814; Address , ;59211; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES NOTE 1. THE CONTRACTOR SHALL REPAIR AND TEST EACH ITEM USING APPROVED ATP ACCEPTED BY THE GOVERNMENT. THE CONTRACTOR MUST ALSO IDENTIFY ALL SPECIAL TOOLS AND TEST EQUIPMENT REQUIRED FOR REPAIRS/OVERHAULS/MODIFICATIONS OF SUBJECT ITEM(S) IN THE CONTRACT. NOTE 2. WHEN SOLICITATION/CONTRACT CITES NAVSUPWSSIA18, NAVSUPWSSIA19, OR EQUIVALENT "CONFIGURATION MANAGEMENT" CLAUSE, WHERE CLASS I ECP(S) ARE PREPARED I/A/W DI-CMAN-80639B AND FOR CLASS II DEVIATION/WAIVER(S) ARE PREAPARED I/A/W DI-CMAN-80640C WITH ALL REQUIRED INFORMATION, THEN DD FORM 1423 DOCUMENTS FOR SUCH SHALL NOT BE ATTACHED AS A CDRL REQUIREMENT TO THIS SOLICITATION/ CONTRACT.

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation N00383-26-Q-AA77, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the teardown, evaluation, repair, upgrade, and modification of three electrical control panels (NSN 6110-01-433-5020, P/N 014344585). This procurement is governed by Basic Ordering Agreement N00383-25-G-AQ01 and requires all units to be returned to a Ready For Issue condition. The contractor is responsible for providing all labor, materials, and tooling, with a specific prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. The required Repair Turnaround Time is 50 days after receipt of the asset, and the induction expiration date is 365 days after the contract award. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Technical requirements include adherence to ISO 9001/SAE AS9100 quality systems and MIL-STD-2073 packaging standards. Inspection and acceptance will occur at the origin. Offerors must submit their quotations by November 30, 2026, at 4:30 PM local time. Payment will be processed electronically through the Wide Area WorkFlow system. Key administrative provisions include Buy American requirements, security prohibitions regarding Chinese military companies, and strict guidelines for handling Beyond Economical Repair and Missing on Induction assets.
Motor and Generator Manufacturing

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS