Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on November 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

49--ADAPTER, TEST, HARM, IN REPAIR/MODIFICATION OF

Closed
N0038326QLA42Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the procurement of three units of a test adapter (NSN 7R-4920-016238515-TX, TDP VER 001) intended for repair or modification purposes. Delivery terms are FOB origin, indicating that responsibility and ownership transfer to the buyer once the items leave the supplier's location. The contract is managed by the Naval Supply Weapon Systems Support under the Department of Defense, with the office located in Philadelphia, PA. All official contractual documents tied to this procurement are considered issued once they are sent via mail, fax, or electronic communication, and acceptance of the contractor’s proposal signifies a binding agreement. This effort is identified under solicitation number N0038326QLA42, with a presolicitation posted on November 26, 2025, and a response deadline of December 29, 2025. The point of contact for this procurement is Brian T. Kent, reachable by phone or email. While the place of performance location details are unspecified, the procurement remains under oversight from a government office without specific set-aside designations or a NAICS code listed. This contract reflects a structured process to ensure clear communication and formal documentation for the acquisition of specialized test equipment for government use.

General Info

Procurement of three test adapters FOB origin by Naval Supply Weapon Systems, contract N0038326QLA42.

NAICS

332710 - Machine Shops

Place of Performance

PA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N792.13|T64|n/a|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving report combo|source|tbd|n00383|tbd|tbd|see schedule|tbd||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334419|750||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO,A1A| This RFQ is for repair. NAVSUP WSS requests that contractors submit a quote that includes either a firm-fixed price or TT&E pricing as well as estimate costs to repair this item. The resulting award will be limited to government approved sources. The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: ADAPTER, TEST, HARM ;7RH-01-623-8515; NSN , ;74D755036-1005; Part Number, Shall be performed IAW: ADAPTER, TEST, HARM ;IAW contractors Pubs and repair process; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: ADAPTER, TEST, HARM ;74D755036-1005; P/N, ;7RH 016238515; NSN, ;repair/overhaul/inspec IAW applicable repair manuals, technical specifications,engineering orders and drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. ADAPTER, TEST, HARM ;THE BOEING COMPANY ; Company Name , ;DEFENSE, SPACE & SECURITY P O BOX 516 M/C S270-1360 SAINT LOUIS STATE: MO ZIP: 63166-0516 ; Address , ;76301; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 332722
New
Federal
BOLT,MACHINE
Solicitation # N0038327QTA09
Solicitation N0038327QTA09, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of machine bolts, specifically NSN 5306-01-706-0165 (Reference 81205 BACB30PW4P16). The government intends to make a single award to a responsible offeror based on the most advantageous offer, with past performance weighted as more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System (SPRS) to assign color ratings. Amendment 0001 updated the required quantity from 2 to 1 and cancelled CLIN 0001AA. The contract requires delivery within 90 days on an FOB Destination basis. Strict adherence to quality management systems such as ISO 9001 or SAE AS9100 is mandatory. Packaging and marking must comply with MIL-STD-2073, MIL-STD-129, and MIL-STD-130, with specific requirements for Item Unique Identification (IUI) and electrostatic discharge protection where applicable. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow (WAWF) system. The procurement also incorporates various Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS) clauses regarding the Buy American Act, cybersecurity, and the prohibition of certain foreign telecommunications equipment.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 334511
New
Federal
COMPUTER,FUEL MANAG
Solicitation # N0038327QAA08
Solicitation NO0383-27-Q-AA08, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside for the teardown, evaluation, repair, overhaul, and modification of Fuel Management Computers (NSN 6610-01-523-8319, P/N 512010-03-01). The primary objective is to return these units to a Ready for Issue (RFI) condition. A critical technical requirement includes the mandatory replacement of all seven transorbs on the internal Fuel Interface Card (PN512023-04-01) as part of standard repair procedures. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Specific prohibitions include the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The contract mandates strict adherence to quality and technical standards, including ISO 9001/SAE AS9100 for quality management and ANSI/NCSL Z540.3 or ISO-10012-1 for calibration. Performance is subject to government inspection and acceptance at the origin, with a required delivery timeframe of 90 days FOB Destination. The award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Additional administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and compliance with MIL-STD-2073-1 for packaging and MIL-STD-129 for marking.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 333998
New
Federal
PIVOT,SUPPORT
Solicitation # N0038327QMA20
Solicitation N00383-27-Q-MA20 is a fixed-price request for the procurement of 31 units of PIVOT, SUPPORT (part number 1680-LL-B6O-A003) for the Department of Defense, managed by Navsup Weapon Systems Support. The item is designated as flight critical, meaning only Government-approved sources may be solicited. Delivery is required within 90 days on an FOB Destination basis, with inspection and acceptance occurring at the origin. The contractor must adhere to ISO 9001 quality management standards and strict military packaging and marking requirements, including MIL-STD-2073, MIL-STD-129, and MIL-STD-147 for palletization. The Government intends to make a single award based on a best-value determination where past performance is considered more important than price. Past performance will be evaluated using the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. Invoicing and payment must be processed electronically through the Wide Area WorkFlow (WAWF) system. The contract incorporates various regulatory requirements, including the Buy American Act, hazardous material identification per FAR 52.223-3, and cybersecurity safeguarding under DFARS 252.204-7012. Offerors must maintain active registration in the System for Award Management (SAM) and provide necessary source approval documentation if not already an approved provider.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0038327QAA13
This solicitation, issued by NAVSUP Weapon Systems Support, seeks a contractor to perform the overhaul, upgrade, repair, testing, and inspection of various circuit card assemblies, including items with NSNs 5998-01-512-3463, 015123482, 015215180, 1680-01-619-4547, and 5998-01-620-1746. The primary objective is to return these assets to a Ready for Issue condition. The contract specifies a one-year induction period from the date of award, with final inspection and acceptance occurring at the origin. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, and must adhere to strict quality standards, including ISO 9001/SAE AS9100 and ANSI/NCSL Z540.3 for calibration. The government intends to make a single award based on a best-value determination, prioritizing past performance over price. Key operational requirements include the use of SAE-AS22759 series wire and compliance with MIL-STD-130 for markings and MIL-STD-2073-1 for packaging. The contract includes specific provisions for Beyond Economical Repair and Over and Above Repair determinations, both of which require DCMA concurrence. Invoicing and payment will be managed electronically through the Wide Area Workflow system. BAE Systems Controls Inc. is identified as a source for certain circuit card assembly repairs.
Bare Printed Circuit Board Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS