Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 6, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

49 -- AGE Paint Booth

Closed
Reference-Number-20071206Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

333999 - All Other Miscellaneous General Purpose Machinery Manufacturing

Place of Performance

EGLIN AFB, FLORIDA 32542, FL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2823 Aftc Pzio
Contacts1 person available
OfficeEGLIN AFB, FL, 32542-5418, USA
Office AddressEGLIN AFB, FL, 32542-5418, USA
Contacts
William J CohenContract Specialist

Full Description

Show more
SOURCE OF SOUGHTFOR 46th MXS Aerospace Ground Equipment Paint Facility Bldg # 455 (AGE Paint Booth) Section 1 Filter Replacement 1. SCOPE OF WORK: The service provider shall supply equipment, tools, personnel, training and technical support necessary to replace 1st, 2nd and 3rd Stage exhaust filters as well as Plenum wall filters and pre-intake filters for the Aerospace Ground Equipment (AGE) Paint Booth. The service provider shall ensure work, services, and operations are in compliance with local, state, and federal laws and regulations. Additionally, the service provider shall comply with security and environmental requirements applicable to the state of Florida and Eglin Air Force Base. 1.1. GENERAL REQUIREMENTS: The service provider shall accomplish applicable tasks in accordance with manufacturer?s recommendations. 2. FIRST STAGE FILTERS 2.1. The service provider shall remove and replace 1st Stage filters with the following requirements: A. Filters will consist of approximately 8 each 30?x114?x2.5? rolls A J Dralle part number 30114CPABL. B. Will meet ?NESHAP? Performance Standards based on Test Method 319. C. On-site installation and disposal of used filters. If filters are deemed to be hazardous material, disposal will consist of packing old filters into base supplied containers and the base will dispose of the filters. The service provider shall be responsible for build up of containers. Containers will consist of a cardboard box lined with plastic. The government will make the determination on how the filters will be disposed of at the time of replacement. D. Filters shall have a manufacturer?s warranty included. E. Service provider must be able to respond within 8 hours of being notified to change First Stage Filters. The government will make every attempt to give service provider as much advanced notice that filters require replacement. F. On advanced notice notifications the service provider is required to perform replacement during the hours of 4:00 pm and 11:00 pm on weekdays or on weekends. 3. SECOND STAGE FILTERS 3.1. The service provider shall remove and replace 2nd Stage filters with the following requirements: A. Filters will consist of approximately 8 each 30?x114?x1? A J Dralle part number 30114MEPTBL B. Will meet ?NESHAP? Performance Standards based on Test Method 319. C. On-Site Installation and disposal of used filters. If filters are deemed to be hazardous material, disposal will consist of packing old filters into base supplied containers and the base will dispose of the filters. The service provider shall be responsible for build up of containers. Containers will consist of a cardboard box lined with plastic. The government will make the determination on how the filters will be disposed of at the time of replacement D. Filters shall have a manufacturer?s warranty included. E. Service provider must be able to respond within 8 hours of being notified to change Second Stage Filters. The government will make every attempt to give service provider as much advanced notice that filters require replacement. F. On advanced notice notifications the service provider is required to perform replacement during the hours of 4:00 pm and 11:00 pm on weekdays or on weekends. 4. THIRD STAGE FILTERS 4.1. The service provider shall remove and replace 3rd Stage filters with the following requirements: A. Filters will consist of approximately 10 each 24x48 10 pocket poly bag filters A J Dralle part number 2444XFP14PB B. Will meet ?NESHAP? Performance Standards based on Test Method 319. C. On-Site Installation and disposal of used filters. If filters are deemed to be hazardous material, disposal will consist of packing old filters into base supplied containers and the base will dispose of the filters. The service provider shall be responsible for build up of containers. Containers will consist of a cardboard box lined with plastic. The government will make the determination on how the filters will be disposed of at the time of replacement D. Filters shall have a manufacturer?s warranty included. E. Service provider must be able to respond within 8 hours of being notified to change Third Stage Filters. The government will make every attempt to give service provider as much advanced notice that filters require replacement. F. On advanced notice notifications the service provider is required to perform replacement during the hours of 4:00 pm and 11:00 pm on weekdays or on weekends. 5. PLENUM WALL FILTERS 5.1. The service provider shall remove and replace Plenum wall filters with the following requirements: A. Filters will consist of approximately 6 each 30?x114?x1 A J Dralle part number30114 6MTBL B. On-Site Installation and disposal of used filters. If filters are deemed to be hazardous material, disposal will consist of packing old filters into base supplied containers and the base will dispose of the filters. The service provider shall be responsible for build up of containers. Containers will consist of a cardboard box lined with plastic. The government will make the determination on how the filters will be disposed of at the time of replacement C. Filters shall have a manufacturer?s warranty included. D. Service Provider must be able to respond within 8 hours of being notified to change Plenum wall filters. The government will make every attempt to give service provider as much advanced notice that filters require replacement. E. On advanced notice notifications the service provider is required to perform replacement during the hours of 4:00 pm and 11:00 pm on weekdays or on weekends. 6. PRE INTAKE FILTERS FOR HEATERS 6.1. The service provider shall remove and replace inlet filters with the following requirements: A. Filters will consist of approximately 4 each 24?x44? 6 pocket filters located inside HAMU A J Dralle part number SCR24X44X8SCR6PB B. On-Site Installation and disposal of used filters. C. Filters shall have a manufacturer?s warranty included. D. Service provider must be able to respond within 8 hours of being notified to change pre intake filters. The government will make every attempt to give service provider as much advanced notice that filters require replacement. E. On advanced notice notifications the service provider is required to perform replacement during the hours of 4:00 pm and 11:00 pm on weekdays or on weekends. 7. PARTS AND MATERAILS 7.1. The service provider shall order and procure all parts and materials needed to remove and replace all filters. The government will allow up to a three percent increase in filter prices every 12 months after award of contract due to market increases. Service provider will need to provide supporting documentation to support cost increase. 8. MAINTENANCE SCHEDULE 8.1. The Government will notify service provider when filter replacement is required. The Government will coordinate with the service provider and schedule date and time to complete the required task. 9. FREQUENCY OF TASK: The Filter replacement program contract will be in operation from time of award with 4 option years. If the contracted operation reverts to in-house operations; the service provider shall cooperate with government personnel to ensure an orderly change over. In the event a follow-on contract is awarded to other than the incumbent, the incumbent service provider shall cooperate to the extent required to permit an orderly transition to the new service provider. Section 2 Maintenance 10. SCOPE OF WORK: The service provider shall supply equipment, tools, personnel, training, and technical support necessary to maintain a preventive and predictive maintenance program to ensure this facility maintains an acceptable level of operational readiness. The service provider shall ensure work, services, and operations are in compliance with local, state, and federal laws and regulations. Additionally, the service provider shall comply with security and environmental requirements applicable to the state of Florida and Eglin Air Force Base. 10.1. SPECIFIC TASKS: The service provider shall accomplish applicable tasks in accordance with manufacturer?s recommendations: 10.1.1. ANALYSIS REPORTS 10.1.1.1 The service provider shall provide preventive analysis report to appropriate government personnel. The report will correspond with the inspection cycle as defined in paragraph 10.4. The report will include the following: A. Verification of all items inspected. B. Identify any safety hazards which may require immediate attention. C. Specifically identify all deficiencies and recommend corrective action. D. Provide cost estimates for any unscheduled maintenance to government personnel. 10.1.2. EXHAUST SYSTEMS 10.1.2.1. The service provider shall inspect the fan belts, housing, foundation and duct work. 10.1.2.2. The service provider shall inspect fans for bearing wear, abnormal noise, motors and sheaves for any physical damage, and motor mounts for security. 10.1.2.3. The service provider shall ensure exhaust manometers are functioning properly, all damper actuators are functioning properly, and filters are not being bypassed. 10.1.2.4. The service provider shall inspect the exhaust enclosures, air inlets, ducts, and access doors through the termination of the system. 10.1.2.5. The service provider shall ensure accumulations of conveyed materials and residues shall be removed from enclosures, ducts and fittings. 10.1.2.6. The service provider shall follow manufacturer?s maintenance schedule and requirements. 10.1.3. CONTROLS AND ELECTRICAL SYSTEM 10.1.3.1. The service provider shall ensure all control panel switches are functioning properly, 10.1.3.2. The service provider shall inspect control panel wiring integrity, amp draws on all motors and verify they are within the motor rated limits, motor control center for any damage. 10.1.3.3. The service provider shall follow manufacturer?s maintenance schedule and requirements. 10.1.4. HEATED AIR MAKEUP UNITS (HAMU?s) 10.1.4.1. The service provider shall ensure HAMU?s are operating correctly. 10.1.4.2. The service provider shall inspect and clean burner assemblies. 10.1.4.3 The service provider shall follow manufacturer?s maintenance schedule and requirements. 10.1.5. CLEANING AND COATING OF PAINT BOOTH 10.1.5.1. The service provider shall strip and clean walls of paint booth up to the 8 foot mark. 10.1.5.2. The service provider shall coat the walls of the paint booth with a barrier coating. The chemical required for this process will be provided by the government. 10.1.5.3. The service provider shall clean paint booth floor and cover with floor paper. Paper must be High Strength Flame Resistant Floor Covering 10.1.5.4. The service provider shall follow manufacturer?s maintenance schedule and requirements. 10.1.6. FIRE SUPPRESSION SYSTEM 10.1.6.1. The service provider shall complete an inspection of the fire suppression system IAW UFC 3-600-02; the frequencies are covered in Table 2-2 on page 2-4. Technical guidance on the specific tasks is covered in NFPA 25. 10.2. GENERAL REQUIREMENTS: The service provider will accomplish the following general requirements. 10.2.1. ADDITIONAL MAINTENANCE 10.2.1.1. The service provider shall complete all non-scheduled maintenance required to maintain operational readiness. All maintenance not associated with the preventive maintenance program (i.e. component replacement due to component failure) will be approved by a government representative and invoiced under the Miscellaneous; Non-Scheduled Maintenance Contract Line Item Number (CLIN). 10.2.2. PARTS AND MATERAILS 10.2.2.1. The service provider shall order and procure all parts and materials needed to perform the preventive maintenance program. Any materials required to maintain operational readiness not included in the program will be invoiced under the Parts and Materials CLIN. 10.2.3. MAINTENANCE SCHEDULE 10.2.3.1. The service provider shall provide the government with a preventive maintenance schedule each month. The service provider is required to perform maintenance during the hours of 4:00 pm and 11:00 pm on weekdays or on weekends. The schedule will include date, time, and number of personnel required during the visit. 10.3. SECURITY REQUIREMENTS: The service provider shall accomplish a visitor?s support agreement through contracting and Security Forces prior to accessing Eglin Air Force Base. The service provider will not be allowed to enter any restricted areas unescorted. The service provider will ensure that all vehicles operated as part of this requirement are clearly labeled with the Contractor?s name and fully comply with all U.S. Air Force, Eglin Air Force Base, traffic rules, laws, and regulations. 10.4. FREQUENCY OF TASK: The Preventive Maintenance Program will be performed on a monthly basis unless a different time frame is specified under the description of the system being inspected. If the contracted operation reverts to in-house operations, the service provider shall cooperate with government personnel to ensure an orderly change over. In the event a follow-on contract is awarded to other than the incumbent, the incumbent service provider shall cooperate to the extent required to permit an orderly transition to the new service provider. Section 3 GOVERNMENT FURNISHED FACILITIES 11.1. FACILITY ACCESS: The 46th MXS will provide access to the MXS Aerospace Ground Equipment Paint Facility based on notification from the service provider of date and time access is required. POC will be Mr. Vertefeuille at the Contract Management Office. 850-882-4699 Email: vertefe@eglin.af.mil

More opportunities from Department Of Defense → FA2823 Aftc Pzio

Same awarding agency

NAICS: 334310
New
Federal
Conference Room Remodel
Solicitation # FA2823-26-Q-A113
Solicitation FA2823-26-Q-A113 is a total small business set-aside for a firm-fixed-price purchase order to modernize the audiovisual system in Building 104, Room 101 at Eglin Air Force Base, Florida. The project scope includes decommissioning legacy infrastructure and installing a Trade Agreements Act compliant system featuring a 20x5 foot Direct-view LED wall display, a 4K AV-over-IP distribution system, digital audio processing, and PTZ cameras to support unclassified hybrid collaboration and high-definition presentations. The contractor is responsible for all labor, materials, programming, and the delivery of an integrated conference table, with a required delivery schedule of no later than 120 days after receipt of order. A mandatory baseline service and maintenance agreement of at least four years must be included in the base price for CLIN 0001. Award will be determined using a Best Value Tradeoff process, evaluating technical capability, past performance, price, and SPRS data. Quotes must be submitted in three separate volumes covering technical capability, past performance, and price by October 26, 2026. All proposed equipment must be TAA compliant, and the AV LAN must remain fully isolated from the government network. Additionally, the contractor must provide an on-site commercial dumpster for waste disposal and adhere to MIL-STD-130 and MIL-STD-129 for the marking and labeling of high-value items costing $5,000 or more. Offerors must be registered in the System for Award Management and Wide Area WorkFlow to be eligible for award and payment.
Audio and Video Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 811121
Federal
FIRE APPARATUS INTERCOM SYSTEM UPLIFT AND INSTALLATION
Solicitation # FA282326Q0065
The Air Force Test Center, Operational Contracting Division at Eglin Air Force Base, Florida, is soliciting quotations for RFQ FA282326Q0065 to procure and install new 4-position onboard intercom systems for twelve fire apparatuses, including ten fire engines, one ladder truck, and one rescue vehicle. This firm-fixed-price contract requires the removal of legacy components and the installation of systems integrated with Motorola APX 6500 mobile radios, featuring wireless driver headsets with a minimum connectivity range of 500 feet. All work must be performed on-site at Fire Station 1 and comply with NFPA 1901 automotive and emergency vehicle wiring standards. The period of performance is 90 calendar days after award, with delivery terms set as FOB Destination. This acquisition is a 100 percent Small Business set-aside under NAICS code 811121, with a size standard of 9 million dollars. Award will be based on the Lowest-Priced Technically Acceptable (LPTA) solution, evaluating quotes on a strict acceptable or unacceptable basis regarding the Statement of Work. Offerors must be registered in SAM and provide firm-fixed pricing, business size status, and required representations and certifications by September 4, 2026. The contract incorporates various FAR and DFARS clauses, including strict requirements for safeguarding covered defense information, cybersecurity reporting, and prohibitions on certain foreign telecommunications equipment. Funding is contingent upon the availability of appropriated funds beyond October 1, 2026.
Automotive Body, Paint, and Interior Repair and Maintenance

POSTED

about 2 months ago

DEADLINE

in 11 months
View Details
NAICS: 541370
Federal
Fiber Cable Locate and Mapping ServicesThe contract encompasses specialized underground fiber cable locating and mapping services using ground penetrating radar technology to ensure precise identification of subsurface utilities prior to any excavation activities. Compliance with the 811 One-Call system is mandatory, requiring coordination with national utility notification protocols to prevent damage to buried infrastructure and maintain safety standards during construction or development operations. The work is classified under NAICS code 541370, indicating scientific and technical consulting services, and is structured as a subcontract within the Department of Defense’s procurement framework under the FA2823 AFTC PZIO office. Performance of the services is required at a location with a ZIP code of 32542, which is associated with Eglin Air Force Base in Florida, indicating the scope is tied to Defense Department infrastructure projects. The contract was posted on July 10, 2026, and while no solicitation number or set-aside details are provided, the emphasis on technical accuracy and regulatory compliance underscores the critical nature of the work in supporting secure and uninterrupted military communications networks. All activities must adhere to strict protocols for subsurface utility detection to mitigate risks of service disruption, environmental harm, or personnel injury.
Surveying and Mapping (except Geophysical) Services

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS