Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

500 E. 4th Ave (Block 20) Mixed-Use Development

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

E. 4th Avenue, S. Delaware Street, S. Claremont Street, San Mateo, CA, 94401

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Mateo
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Fahteen KhanAssociate Planner
Connor TutinoProject Manager

Interested Companies (1)

David J. Powers & AssociatesSan Jose, CA

Full Description

Show more
The 500 E. 4th Ave (Block 20) Mixed-Use project would demolish all existing structures on-site and construct a seven-story, approximately 167,489 square-foot mixed-use building with two levels of below grade parking. The building would be a maximum height of 85 feet and would include approximately 99,025 square feet of office space, 17,205 square feet of common area per floor, and 72 multi-family residential units.

More opportunities from California → City of San Mateo

Same awarding agency

NAICS: 236220
SLED
922-980 S. Claremont Street Project
Solicitation # PA- 2024- 062
The 922-980 S. Claremont Street Project, identified by solicitation PA-2024-062, is a development initiative by the City of San Mateo to establish a self-storage facility on a 1.37-acre site. The project involves the rehabilitation of three existing single-story buildings totaling 25,186 square feet and the construction of a new two-story storage building of approximately 51,873 square feet, including a basement level. Together, these four buildings will provide 76,767 square feet of space comprising 591 storage units, 717 storage lockers, 118 wine storage units, and approximately 2,028 square feet of office space. Additional site improvements include a 20-space surface parking lot, landscaping, frontage improvements, and both on- and offsite utility connections. The project is subject to strict environmental and safety compliance, including the California Environmental Quality Act and a Mitigated Negative Declaration. Because the site is identified as a leaking underground storage cleanup site, the contract mandates a comprehensive Site Management Plan and a project-specific Health and Safety Plan. Key requirements include specialized OSHA training for personnel, baseline medical examinations, and rigorous soil characterization and approval processes for the disposal or reuse of impacted soil. Construction is anticipated to take approximately 1.5 years, with an estimated schedule running from April 2026 through December 2027. Technical analyses have confirmed that proposed wastewater flows are lower than existing levels, eliminating the need for sewer main improvements.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS