This Solicitation opportunity from Department Of Defense was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BOLT, MACHINE
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This solicitation, identified as SPE4A6-26-T-10GA, is a HUBZone set-aside for the procurement of 167 units of NSN 0001S00000061 under a fixed-price contract structure, with performance required at Cherry Point, NC, and delivery to occur FOB origin. The contract mandates strict adherence to first article testing requirements per FAR 52.209-3 and Alternate I, compelling the contractor to test one unit of item 5306/10965593 and submit a detailed test report within 60 calendar days of contract award, along with a 14-day advance notice before shipment for government verification. Production lot testing is also required, with the government selecting one random sample from the production lot after first article approval and conducting tests at the Redstone Technical Test Center; the contractor must prepare and ship the sample using traceable means with all required documentation including signed DD Forms 1222 and 250, material certifications, inspection sheets, manufacturing drawings, and a prepaid return label for Government use. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, specifying preservation methods, container types, and labeling requirements including CAGE codes, lot and serial numbers, and proper identification of proprietary information. The offeror must represent their small business status, including HUBZone eligibility, maintain active SAM registration, and comply with mandatory clauses covering cybersecurity, trafficking in persons, employment eligibility, hazardous materials, sustainable procurement, and safeguarding covered defense information under NIST SP 800-171 and DFARS 252.204-7012. All invoices must be submitted via WAWF, and the contractor is responsible for ensuring conformance to quality standards such as AS9100 and AS9120 throughout the manufacturing process. Testing and acceptance occur at the contractor’s origin facility, with the government retaining final inspection authority, and no fast pay provisions apply. The solicitation does not include pricing data, evaluation factors, or a defined statement of work, relying instead on technical data packages and referenced standards to define technical expectations.
General Info
Place of Performance
PHANTOM RD BLDG 147 BAY A, CHERRY POINT, NC, 28533-5040, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 5306 / 10965593 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 60 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
SPE4A6-26-T-10GA
SECTION A
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 5306-01-096-5593 Quantity: 167 EA Purchase Request: 7017486702QTY: 167 Delivery: 559 days ADO
More opportunities from Department Of Defense → ASC COMMODITIES DIVISION
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
