Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on June 22, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

54 -- Manitoba Trail Bridge Replacement

Awarded
AG-0120-S-06-0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This amendment for the Manitoba Trail Bridge Replacement project, solicitation AG-0120-S-06-0029, provides critical technical clarifications for prospective bridge manufacturers. Key specifications include the requirement for rough sawn untreated running planks to cover the full five-foot travel width of the treated timber decking, with final attachment methods and fastener details subject to approval. The specified preservative treatment for the bridge deck must be Copper Naphthenate in a light oil, as ACZA treated Doug Fir is not permitted. Additionally, the bridge must feature a rail height of 54 inches above the travel surface, utilizing the top chord of the truss as the handrail and welded wire fabric safety fencing as the primary barrier. This opportunity is a total small business set-aside managed by the USDA Forest Service Alaska Regional Office. Interested parties must submit their price quotations via fax, email, or mail, while ensuring that three hard copies of the required documentation are delivered to the Anchorage, Alaska office by June 28, 2006, at 10:00 am Alaska Time.

General Info

Contract Value

$57,559

NAICS

332312 - Fabricated Structural Metal Manufacturing

Place of Performance

Seward, AK 99664, AK

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → R10 Alaska Regional Office
Contacts2 people available
OfficeJUNEAU, AK, 99802, USA
Office AddressJUNEAU, AK, 99802, USA

Full Description

Show more
This amendment provides responses to questions received: Q. Statement of Work, III. Submittal Requirements, Part A, 1.a: Please clarify where the 3 rough swan untreated running planks go. Are these to placed on top of the 2 wood decking? If so, do they cover the entire surface of the 2 wood decking? A: The 3 X rough sawn untreated running planks are to be placed on top of the treated timber decking for the full travel width (i.e. 5-foot width) as stated in the SOW section referenced by individual raising the question. The fabrication plans to be provided as a deliverable to the FS by the successful bridge manufacturer will show the attachment method of the untreated timber running planks to the treated deck. Typically this is performed using a minimum 3/8" diameter galvanized ring shank spike sized for length not greater than the combined depth of the running surface (minus any countersinking) and the bridge deck. Further conversations will be required with the successful bridge manufacturer on pre-bored hole diameters, fastener size and installation patterns before final approval is given on these details. Q: Can the bridge deck be ACZA treated Doug Fir? This treatment is the norm for our steel truss bridges when decked with Doug Fir. Side Note: Our timber bridges are typically treated with CU NAP(Copper Naphthenate). A: No. Copper Naphthenate in a light oil (Type C Solvent) will be the specified preservative treatment. Q: What is the expected rail height(42"or 54")? Are there to be horizontal safety rails, vertical pickets, or is the welded fencing by itself to keep people from falling through the truss? Is there to be a handrail or is the top chord of the truss to function as a handrail? A: The rail height is to be 54" above the top of the travel surface of the bridge. There are no horizontal safety rails or vertical pickets. The WWF safety fencing will serve as the safety barrier on the steel superstructure. The top chord of the truss shall function as the handrail in this installation. Q: Can our quote be submitted to you via fax or E-mail? If not, what are the procedures required to package our quote? A: SOW Section III.A.2 requests three (3) hard copies of documentation to be submitted in addition to the price quotation. Quotes may be faxed to +1 (555) 000-0000 or mailed to USDA Forest Service, Chugach NF, 3301 C Street Suite 300, Anchorage AK 99503. Quotes may also be emailed to: contact@example.gov. Hard copy information in the correct number of copies requested should be delivered to the address provided by 28 June 2006 at 10:00 am Alaska Time.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS