Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

5421 Bellevue Ave / PRJ - 1136705

Forecast
PRJ-1136705State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Diego Development Services Department is overseeing project PRJ-1136705, which involves a Coastal Development Permit for a lot line adjustment between two adjacent parcels located at 5421 and 5407 Bellevue Avenue. The 0.39-acre site is situated within the La Jolla Community Plan Area of Council District 1, falling under the RS-1-7 Base Zone and the Coastal Non-Appealable Overlay Zone. The project area is identified as being in geology hazard category 52 and a high paleontological sensitivity area. No construction is proposed as part of this project, and there is no change in land use or density. Consequently, the City of San Diego has determined the project to be categorically exempt from the California Environmental Quality Act under Section 15305 for Minor Alterations in Land Use Limitations. The official Notice of Exemption was filed and posted on October 22, 2025. Administrative oversight is managed by Senior Planner Courtney Holowach, and the project is legally described as Lots 11 through 14 in Block 26 of the Bird Rock Addition.

General Info

Coastal Development Permit for lot line adjustment at 5421 and 5407 Bellevue Avenue.

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A

Full Description

Show more
Coastal Development Permit for Lot Line Adjustment between two adjacent parcels, each with an existing single dwelling unit, located at 5421 and 5407 Bellevue Avenue. The 0.39-acre site is In the RS-1-7 Base Zone, Coastal (Non-Appealable) Overlay Zone within the La Jolla Community Plan Area, within Council District 1. It is surrounded by similar low-density single-family development. The project site is in geology hazard category 52 in a high paleontological sensItIv1ty area. No construction is proposed with this project. LEGAL DESCRIPTION: Lots 11 through 14, In Block 26, in Bird Rock Addition, m the City of San Diego, County of San Diego, State of California, according to Map thereof No. 1083, fried in the office of the County Recorder of San Diego County, September 3, 1907 and refilled January 27, 1908.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS