Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

56--Building Materials for Badlands National Park South Unit Housing Project Quarters for District Ranger

Active
Q13000030049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract outlines the construction of a new energy-efficient housing unit for the District Ranger at the South Unit of Badlands National Park, replacing an outdated double-wide trailer that has been in use for 15 years. The new single-story residence will be approximately 1,680 square feet with three bedrooms, constructed using modern materials and techniques to serve as a model for future housing in the district. Key features include a concrete foundation, 2x6 framed walls with R-19 fiberglass insulation, hardiboard exterior siding, Marvin thermopane windows, steel-clad exterior doors, propane HVAC, and durable roofing materials. The house will sit adjacent to the District Ranger Office, outside the 100-year floodplain, with a gravel driveway approximately 100 yards long. Existing septic and potable water systems will remain in use. Construction is scheduled to begin around June 1, 2003, and be completed by September 30, 2003, with the house first built at a maintenance yard and then transported to the site. The estimated cost range is between $25,000 and $100,000. The procurement process is designated as a "Best Value" competition under FAR 12, with solicitation details available exclusively through the Department of the Interior’s online platform. The goal is to upgrade the housing conditions in the South District, enhancing security and sustainability with a well-planned, modern residential structure.

General Info

Construct new energy-efficient 1,680 sq ft District Ranger house by September 2003, replacing trailer.

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)

Place of Performance

Badlands National Park Pennington County Interior, South Dakota 57750, CO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
Scope of Work South Unit Housing Project-Badlands National park New Construction of Quarters for District Ranger Introduction Over the past 20 years the need for housing in the South District has been a critical issue for the security in the area. The existing house consists of a 15 year old, double wide house trailer unit that that needs to be replaced with an energy efficient structure residence to serve as a model for other housing units in the District. Objectives It is planned to remove the existing double wide structure from the south unit area and to replace it with a modern frame built house that will serve as the main housing unit for the South District ranger. Improved building materials, energy efficient walls, windows, doors and roofing materials to be used in place of standard trailer type design and construction. Modern materials and finishing techniques to be incorporated throughout the structure. South District House/ Location/ Components The footprint of the single story, three bedroom house is to be approximately 1680 sf (i.e. 28ft X 60ft.) and will be located adjacent to the District Ranger Office. The structure to consist of a concrete block or poured concrete foundation, 2?X 6?frame material for walls, and a manufactured roof truss system. The heating/cooling plant to consist of a propane HVAC system. Exterior siding shall consist of hardiboard 7/16?? x 4? x 9?. The entrance driveway shall consist of stone and gravel, approximately 100 yards in length. The housing unit to be located outside the 100 year flood plain. Other considerations include but are not limited to the following: Driveway/entrance road-sand and gravel to be hauled in from local gravel pit Foundation- concrete footers with concrete block or poured concrete walls Wall/frame construction-2x6 syp wood frame with R 19 fiberglass wall insulation, ? sheet rock wallboard, primed and finish painted. Windows/ doors -Windows to be Marvin wood metal clad thermopane glass or equal. Exterior doors to be steel clad , interior doors to be 6 panel birch wood doors Roof system Propanel -2 metal sheeting will be used for roofing over 15 lb felt. Paint - Sherwin Williams Promar 100 for outside paint and Promar 200 for inside painting Electrical - Main panel to be 200 amp service Plumbing - Main supply lines will be copper, drain lines to be PVC schedule 40 . Sinks, toilets, bathtubs, faucets, to be American Standard or equal HVAC - Heat to be propane, AC to be refrigeration Septic system- Existing system to be used which is a 1500 gallon septic tank with leach field. Potable water system - Existing system to be used which is a commercial water company . A professional house mover will do transport/relocation of house from Cedar pass maintenance area to White River visitor center area . Schedule Construction of the housing unit to begin on or about June 1, 2003 and be completed by September 30, 2003. The house will be constructed in the maintenance yard and transported to the south unit building site. Cost Range is Between $25,000 and $100,000.00. Solicitation will be available only by connecting with the DOI Website at http://ideasec.nbc.gov O/A May 7, 2003.Tthis procurement is being conducted as a "Best Value" procurement using the rules of FAR 12.NAICS:444190 P&S:5640

Similar Contracts

Same NAICS industry code

NAICS: 236115
New
26-139 Panic Hardware Installation & correcting egress door swing
Solicitation # 26-139
Solicitation 26-139 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc. to correct non-compliant door swing and clearance conditions at four electrical rooms in Edinburgh, Indiana. The project requires the removal and reinstallation of commercial door leaves, frames, and hinges to ensure doors swing outward in the direction of egress, preventing encroachment into corridors and maintaining required electrical working clearances. The contractor must furnish and install listed panic hardware allowing one-motion emergency exit and perform all necessary patching and finishing to match adjacent surfaces. All work must adhere to NFPA 101 Life Safety Code, NFPA 70 National Electrical Code 2020, and local Indiana building and fire codes. Proposals must be submitted as a single lump sum contract with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Mandatory requirements for bidders include attending a site visit on November 4, 2026, providing a valid Indiana Contractor's License, and certifying compliance with Davis Bacon Act wage rates. The successful contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work must commence within 14 days of the Notice to Proceed, and final acceptance is contingent upon a substantial completion walk-through and the submission of certified payroll records and a completed SF 1413.
Atterbury Job Corps. – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236115
New
SLED
F&W, Residential House, Resident Fish Hatchery - Sturgeon
Solicitation # RFP-Template_format_fixed_CCT_Sturgeon-Residence-10-1-2026-xbmk.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for the design, site development, and construction of a move-in-ready residence at the Sturgeon Fish Hatchery site in Bridgeport, Washington. The project entails the creation of a code-compliant, one-story dwelling of approximately 1,598 square feet featuring three bedrooms, two bathrooms, and an attached two-car garage. The contractor is responsible for all labor, engineering, permits, and utilities, with the Teton floor plan by Adair Homes serving as the design reference. Proposals must be submitted by 3:00 p.m. PST on October 30, 2026, and must include a detailed cost proposal, a realistic project schedule, and a statement of qualifications. Award selection is based on a criteria evaluation process that considers total proposed cost, personnel qualifications, project understanding, experience, and Tribal Employment Rights Office (TERO) preferences. Preference is heavily weighted toward Colville Business Enterprises, and a responsible Indian Offeror may be awarded the contract if their price is within 10 percent of the lowest non-Indian offer. Financial requirements include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Final acceptance of the project requires a certificate of occupancy, completion of all punch-list items, and the provision of warranties and owner training.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in about 24 hours
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS