56 CS FOC to Flightline and Wx Equipment, Luke AFB
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract is a 100% Women-Owned Small Business set-aside for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The scope of work involves connecting the Radar Approach Control to several key facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment stations. The installation will utilize a combination of existing manhole/handhole duct systems and direct burial, with a requirement that all materials be rust-proof and corrosion-resistant. The project must be completed within 120 days of award, with a total period of performance not to exceed 180 calendar days. The contract will be awarded to the lowest priced, technically acceptable quote, with evaluations based on design, a quality control plan, and supplier performance history. Proposals are limited to 25 pages and must include separate technical and pricing volumes, as lump sum pricing is not permitted. Contractors must comply with strict base access security protocols, environmental guidelines regarding hazardous materials and lead-based paint, and technical standards such as TIA 526-7 for fiber optic testing. Final acceptance is contingent upon a project walk-through and the signing of AF Form 747 by the Contracting Officer.
General Info
Place of Performance
Set-Aside
Documents
11Read all 11 documents
Due in 14 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 11 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Combined Synopsis
Set-aside changed from Small Business Set Aside - Total to SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15).
The notice description changed.
Notice details unchanged. Attachments may have changed.
The notice description changed.
The notice description changed.
Notice details unchanged. Attachments may have changed.
Response deadline changed from Nov 9, 2026 to Nov 12, 2026. The notice description changed.
Response deadline changed from Nov 12, 2026 to Nov 30, 2026. The notice description changed.
Notice details unchanged. Attachments may have changed.
Response deadline changed from Nov 30, 2026 to Dec 7, 2026.
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
FINAL EXTENSION: Proposals are due no later than 30 November at 1300. NO ADDITIONAL EXTENSIONS WILL BE PROVIDED. Responses to Site Visit Q&A will be posted by 13 November 2026 at 1300 Arizona Time.
The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend.
Only SBA Certified Women Owned Small-Businesses are eligible for this requirement.
**THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED**
Attendance will be limited to 2 representatives for each contractor.
To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to •••••@•••••.•••Sign up to see this detail, no later than 26 October 2026 at 1500 Arizona Time.
Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN
To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport.
When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements.
**QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time**
***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026***
This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.
See attached Solicitation and supporting documents for additional information.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → FA4887 56 Cons Cc
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
