Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

58--PROCESSOR,SIGNAL,SO, IN REPAIR/MODIFICATION OF

Closed
N0038325QT206Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334290
New
Federal
SIGNAL DISTRIBUTION
Solicitation # N0010426QYA2T
This contract involves repair services for a signal distribution system under solicitation number N0010426QYA2T, issued by the Naval Supply Weapon Systems Support Mechanical office within the Department of Defense. The contract requires the contractor to perform repairs to meet specific operational and functional requirements based on designated Cage Codes and reference numbers, adhering to approved repair standards, technical orders, drawings, and manufacturing instructions. Quality assurance mandates government source inspection, adherence to inspection and testing per original manufacturer specifications, and comprehensive record-keeping for inspections extending 365 days post-delivery. All materials must be mercury-free to ensure safety on submarines and surface ships, with strict protocols for any permissible mercury use. Packaging and preservation must comply with military packaging standards. Offers need to include detailed pricing, repair turnaround time measured from asset return to government acceptance, and cost breakdowns if applicable. The contract stipulates that all freight is FOB origin and requires bilateral award with contractor acceptance. Changes to design or materials are restricted and require prior government approval. Access to necessary specifications, standards, and technical documents is outlined, with instructions for obtaining classified or restricted information. Distribution statements govern document sharing, ensuring security as per naval instructions. Only authorized distributors of the original manufacturer's item will be considered for award, with proof required during the proposal submission. The solicitation deadline is December 22, 2025, and the contract is aligned with NAICS code 334290.
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in 2 months

AI Contract Overview

Show more

This contract involves the procurement of 28 units of a signal processor designated for repair or modification, identified by NSN 7R-5845-016872619-P8, under TDP version 001. The delivery terms specify FOB origin, indicating that the contractor is responsible for shipping the items to the government’s designated location. All related contractual documents, including contracts, purchase orders, task orders, delivery orders, and modifications, are considered issued once transmitted via mail, fax, email, or other electronic methods, with the government's acceptance of the contractor's proposal serving as a bilateral agreement to issue these documents accordingly. Early and incremental deliveries are encouraged and preferred, facilitating flexible supply chain management. The procurement is managed by the Department of Defense’s Naval Supply Systems Support, located in Philadelphia, PA. Interested parties can access relevant military and federal standards, specifications, and other standardized documents through the DoD Single Stock Point (DODSSP) via the ASSIST-Online platform or by direct request, with assistance available through designated help desks. The solicitation was posted on January 22, 2025, with a response deadline of March 10, 2025. The primary point of contact for inquiries is Destiny N. Wiatr, reachable via email or phone, ensuring clear communication channels for potential vendors or interested entities.

General Info

Procurement contract for 28 signal processors, delivery FOB origin, early shipment preferred.

NAICS

334290 - Other Communications Equipment Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N791.13|LP7|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report||TBD|N00383|TBD|TBD|SEE SCHEDULE |TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|334290|750||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor?s facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular business dayafter receipt and the Action Date entered in CAV must be dated to reflect theactual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract.Required RTAT: 90 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint foreachNSN(s). Total assets to be repaired monthly after initial delivery commencesX/month (contractor fill in #). A throughput of ##____ per month reflects nothroughput constraint. Induction Expiration Date: 365 days after contract award date. Anyassetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS Contracting officer. Reconciliation:A reconciliation modification will be issued after finalInspection and acceptance of all assets inducted under the subsequentcontract.for each unit at the negotiated RTAT. Such prices are based on theContractor meeting the RTAT requirements described within the schedule page.Ifhe Contractor does not meet the applicable RTAT requirement, consideration willbe assessed and subject to negotiation.All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) r related to the instant procurement are considered to be "issued" by the Government when copies are either depositedinthe mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government?s acceptance of the contractorsproposalconstitutes bilateral agreement to "issue" contractual documentsasdetailed herein. Early and incremental deliveries accepted and preferred. INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Mercury Systems; drawing number ( ;1VQH4; ) ;701253-02; , Revision ;LATEST; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: PROCESSOR,SIGNAL,SO ;701253-02; P/N, ;0RH 5845 016872619 P8; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. PROCESSOR,SIGNAL,SO ;Mercury Systems; Company Name , ;3680 CENTERVIEW DRIE SUITE 100, CHANTILLY VA 20151-3048; Address , ;1VQH4; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 336413
New
Federal
16--STEERING UNIT,AIRCR, IN REPAIR/MODIFICATION OF
Solicitation # N0038326RSB15
This solicitation under contract number N0038326RSB15 requests repair and modification services for 82 units of the Aircraft Steering Unit, NSN 7RH 1620 014752013, with a firm fixed-price structure required unless otherwise advised. All work must be performed at Triumph Actuation Systems’ facility in East Lyme, Connecticut, and contractors must be pre-approved sources according to NAVSUP WSS guidelines; proposals lacking full source approval documentation will be disqualified. The repair scope mandates restoration of each unit to Ready for Issue (RFI) condition following approved technical drawings, specifications, and overhaul manuals, with all repairs subject to strict configuration management controls requiring prior government approval for any changes to processes, sources, or facilities. The use of prohibited materials such as MIL-W-81381 wire is strictly forbidden, replaced by SAE-AS22759 series wire, and all parts must be new unless written exception is granted by the Procuring Contracting Officer. Contractors must implement a certified quality management system compliant with ISO 9001 and SAE AS9100, maintain a robust calibration program meeting ANSI/NCSL Z540.3 or equivalent standards, and conduct rigorous receiving inspections of all purchased materials with documented dimensional and material certifications retained for a minimum of 12 months. All repair and inspection procedures, including sequential process diagrams and test specifications, must be submitted for government review and approval, and failure analysis, nonconforming material handling, and corrective action reports must be provided to the government upon request. Critical provisions govern Beyond Economical Repair (BER) and Missing on Induction (MOI) determinations, which require written concurrence from DCMA and explicit direction from the PCO before proceeding, and any Over and Above Repair (OAR) work must also receive prior authorization and documentation. The contract prohibits cannibalization without NAVSUP WSS and BDE approval, mandates adherence to MIL-STD-130 markings, includes a 12-month warranty for noncomplex supplies, and enforces Buy American and veteran/women/disabled worker equality requirements. All proposals must be submitted electronically by July 27, 2026, and must include full compliance with security, transportation, payment, and certification clauses applicable to defense procurement.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332722
New
Federal
BOLT,MACHINE
Solicitation # N0038327QTA09
Solicitation N0038327QTA09, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of machine bolts, specifically NSN 5306-01-706-0165 (Reference 81205 BACB30PW4P16). The government intends to make a single award to a responsible offeror based on the most advantageous offer, with past performance weighted as more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System (SPRS) to assign color ratings. Amendment 0001 updated the required quantity from 2 to 1 and cancelled CLIN 0001AA. The contract requires delivery within 90 days on an FOB Destination basis. Strict adherence to quality management systems such as ISO 9001 or SAE AS9100 is mandatory. Packaging and marking must comply with MIL-STD-2073, MIL-STD-129, and MIL-STD-130, with specific requirements for Item Unique Identification (IUI) and electrostatic discharge protection where applicable. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow (WAWF) system. The procurement also incorporates various Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS) clauses regarding the Buy American Act, cybersecurity, and the prohibition of certain foreign telecommunications equipment.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 334511
New
Federal
COMPUTER,FUEL MANAG
Solicitation # N0038327QAA08
Solicitation NO0383-27-Q-AA08, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside for the teardown, evaluation, repair, overhaul, and modification of Fuel Management Computers (NSN 6610-01-523-8319, P/N 512010-03-01). The primary objective is to return these units to a Ready for Issue (RFI) condition. A critical technical requirement includes the mandatory replacement of all seven transorbs on the internal Fuel Interface Card (PN512023-04-01) as part of standard repair procedures. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Specific prohibitions include the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The contract mandates strict adherence to quality and technical standards, including ISO 9001/SAE AS9100 for quality management and ANSI/NCSL Z540.3 or ISO-10012-1 for calibration. Performance is subject to government inspection and acceptance at the origin, with a required delivery timeframe of 90 days FOB Destination. The award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Additional administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and compliance with MIL-STD-2073-1 for packaging and MIL-STD-129 for marking.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 22 days
View Details
NAICS: 332722
New
Federal
SCREW,MACHINE
Solicitation # N0038326QTA66
The solicitation seeks quotes for MACHINE SCREWS under solicitation number N0038326QTA66, issued by the Naval Supply Systems Command Weapon Systems Support, with theNAICS code 332722 and a response deadline of May 29, 2026 at 4:30 PM EST. All submissions must be emailed to [email hidden], and late submissions will not be considered. The solicitation employs competitive procedures, but if only one acceptable quote is received, the Government will transition to sole source negotiations. The award will be made to the offeror whose quote is technically acceptable and most advantageous to the Government, with price and lead time as key evaluation factors. Early and incremental deliveries are preferred. The contract applies specifically to P-8 CAT 1 and CAT 2 items and incorporates additional commercial item requirements under FAR 52.212-4, including mandatory notification and approval for any engineering changes affecting interchangeability, performance, safety, reliability, FAA certification, or part re-identification. Contractors must provide documentation such as Service Bulletins or OEM change notifications and obtain written authorization prior to implementing any such changes. The contract also incorporates numerous federal requirements including Buy American provisions, Equal Opportunity for Workers with Disabilities, Annual Representations and Certifications under Deviation 2025-O0003 and 2025-O0004, and instructions for invoice and receiving report submissions. Contract documents are considered officially issued upon electronic transmission or mail deposit. The primary point of contact is Carolyn A. Clark, reachable via email or telephone at [phone hidden], with performance and delivery to be coordinated within the U.S., specifically through the Philadelphia office.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS