Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on December 5, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

59--CABLE ASSEMBLY,SPEC

Closed
N0010423QFA34Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333998
New
DIBBS
ADAPTER, STRAIGHT, PIPE
Solicitation # SPE8E6-27-T-0524
Solicitation SPE8E6-27-T-0524 is for the procurement of 66 straight pipe-to-hose adapters for fire fighting, identified by NSN 4210-00-277-3376. The adapters must be manufactured from copper alloy with specific threading requirements: a 1 inch 11-1/2 NPT RH first end and a 1-1/2 inch 11-1/2 NPSH RH second end, adhering to MIL-DTL-52404C Type XVI, Class C. A metal casting process is identified for manufacture, requiring specific tooling. The contract mandates that mercury or mercury-containing compounds shall not be intentionally added to the hardware, except for specific functional exceptions. The procurement includes a mandatory First Article Test (FAT) consisting of three samples, which must be witnessed by a Government Quality Assurance Representative. A test report must be submitted within 90 days of award. Inspection and acceptance will occur at the origin, with delivery to the DLA Distribution DDSP New Cumberland facility. The need ship date is March 11, 2027, with an original required delivery date of September 11, 2027. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements. The solicitation is subject to various FAR and DFARS clauses, including the Buy American Act, NIST SP 800-171 cybersecurity requirements, and a price evaluation preference for HUBZone small businesses. Offers utilizing additive manufacturing are ineligible for award.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 14 hours ago

DEADLINE

in 11 days

General Info

NAICS

333998 - All Other Miscellaneous General Purpose Machinery Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline time changed from 8:30 PM UTC to 9:30 PM UTC on Dec 23, 2022.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.42|WWJ|7176051883|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00104|TBD|N50286|N50286|TBD|133.2|N/A|N/A|N/A|N/A|N/A|N/A|contact@example.gov| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 YEAR|365 DAYS AFTER LAST DELIVERY UNDER THIS CONTRACT ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|335931|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. The resulting award will not contain Government source Inspection (GSI) 2. FAR Clause 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance is changed from 7 days to 45 days after delivery of the supplies in accordance with the terms and conditions of the contract. 3. Note to DCMA ACO: Clause NAVSUPWSSGA02 is amended to include Post Award PCO retaining the following functions: FAR 42.302(3), (32), (37), (38), (40),(41),(43), (45 through 51), (60) and (62). 4. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 5.The following proposed delivery schedule applies: Final delivery of material (186 days) 6. NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clause 252.213-7000. 7. Drawings associated with this solicitation will be made available on the new beta.SAM website, but will be restricted access which needs to be approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(C); applies to this material. 1.1.2 This ;Cable ASsembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=5486639 |53711| V| |D|0001 | |49998|3383247 DRAWING DATA=5486641 |53711| K| |D|0001 | |49998|1542116 DRAWING DATA=5486641 |53711| K| |D|0001.A | H|49998|0016181 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-DTL-24231 |0013| |E |130426|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;The Cable Assembly must be manufactured in accordance with NAVSEA drawing 5486639 item 191, NAVSEA drawing 5486641 P/N K-HNG5500, CSD313, and CSD321, except as amplified or modified herein.; 3.2 ;Drawings 1-100492b and 7329665 do not apply.; 3.3 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD023, CSD313, & CSD321; in ECDS at https://register.nslc.navy.mil/ 3.4 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.4.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.5 First Article Test (Contractor): One complete Cable assembly must be subjected to First Article Tests per MIL-DTL-24231 type 1 and the following: A) The hydrostatic pressure test must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231 at ;135; PSI. B) The Insulation resistance check must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231. C) A dielectric test is required per SS800-AG-MAN-010/P-9290 paragraph 3.6.3.5 Electrical Testing and MIL-DTL-24231 at ;1250; V AC. 3.6 Quality Conformance Tests - Each Cable assembly must be subjected to Quality conformance tests per MIL-DTL-24231 Type 1 with the following exceptions: (Certificate of Compliance only) A) The hydrostatic pressure test must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231 at ;135; +5%/-0% PSI for both the three cycle test and 2 hour test. B) The Insulation resistance check must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231. C) A dielectric test is required per SS800-AG-MAN-010/P-9290 paragraph 3.6.3.5 Electrical Testing and MIL-DTL-24231 at ;1250; V AC. 3.7 Marking - This item must be physically identified in accordance with MIL-STD-130. 3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.9 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.10 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one complete cable assembly; unit(s) in accordance with requirements ;of section 3 of this contract; . 3.11 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.11.1 Waivers/Deviations - Waivers and Deviations must be designated as Critical, Major, or minor. All waivers and deviations require review and approval bythe Contracting Officer. A copy of approved waivers and deviations with related OQE must be submitted via WAWF as part of the entire OQE package. (SOC MCD C material requires both approved and disapproved waivers and deviations be submitted) Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.11.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.11.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.12 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.13 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.13.1 Direct reading of O-ring surface diameters with specified standard. 3.14 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date of the person performing the test and must be maintained by the contractor in accordance with contract requirements. 5. Identification for each cable or lot of cables tested together and identified with component serial number to the objective quality evidence (test records held at manufactures facility). This is necessary to correlate the testing records to the cables tested. 6. Dielectric Strength Testing: Manufacturer is required to record the required and actual voltage, frequency, and duration. 7. Hydrostatic Testing: Manufacturer is required to identify the hydrostatic test duration and number of cycles (e.g. Cycle 1 - 3 X 100 +/-5 psig for 5 minutes) required and those actually accomplished during testing. Manufacturer is to record the results of Continuity Testing ,in addition to Insulation Resistance Testing, before and after Hydrostatic Testing. Low Voltage Insulation Resistance testing may be utilized when damage to the equipment is highly probable. 8. Manufacturer is required to document the required test value or parameter and test tolerance with which the testing is specified to be performed. This information comes from the Government Furnished Information (e.g. the specification or governing requirement document). When documenting the observed test pressure for cable lots, minimum and maximum pressure observed must be reported. 1. Manufacturer must indicate the required duration for testing as outlined by GFI and actual test duration witnessed at that time. 2. Manufacturer documentation must specify the required test medium as outlined by GFI as well as the actual test medium used for testing. 3. Manufacturer must include all reporting of allowable leakage specified within GFI in addition to actual leakage experienced during testing (when specified and allowed). 3.15 The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.15.1 All records generated by the manufacturer, which are used as the basis for completing the C of C, are required to be retained at the manufacturers facility for a minimum of seven years, or as noted by the requirements of the contractually invoked documents. 3.15.2 Manufacture's objective quality evidence documentation and reference data applicable to this contract are not required to be shipped as a deliverable, however these articles must be made available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government. 4. QUALITY ASSURANCE 4.1 Notes to the Contractor - 4.1.1 The Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. The departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 The Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A record of these departures, traceable to the applicable part number and contract number must be submitted to the PCO. 4.1.3 The Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 The Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions, and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL - Dec 17 2011 - Began using ECDS for submissions - Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE - Dec 17 2011 - Moved Quality Assurance Text location for Readability - Jan 19 2011 - Added notification of DCMA upon contract award - Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section - Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: contact@example.gov No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - See Clause 52.209-3 for submittal timeframes.

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS