Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 9, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

59--LA IEM TACTICAL EHF

Awarded
N0010423QFB59Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332722
New
Federal
BOLT,MACHINE
Solicitation # N0010426QFG16
This contract specifies the procurement of machine bolts designated as Special Emphasis Level I material for use in critical shipboard systems, where failure could result in catastrophic consequences including loss of life or ship. The bolts must comply with Leslie Controls Inc. drawing 21844N and material specification ASTM-A193 Grade B7, with stringent requirements for traceability, chemical and mechanical testing, and certification. Each production lot requires quantitative analysis, wedge tensile testing, and nondestructive inspection via liquid penetrant or magnetic particle methods, all governed by MIL-DTL-1222 and other referenced standards such as ASTM-F606, FED-STD-H28, and ISO-9001. Traceability must be maintained from raw material through final inspection via unique heat-lot markings applied per MIL-STD-792, and certification reports must be 100% complete, unqualified, and directly linked to each item's marking without transcription. All deliveries require submission of certification data through WAWF to Portsmouth Naval Shipyard (N50286) for prior approval, with no material allowed to ship until acceptance is granted. The contractor must maintain an ISO-9001 or MIL-I-45208 quality system with calibration compliance to ISO-10012 or ANSI-Z540.3, subject to government audit at source. Government Quality Assurance will conduct independent inspections, including 100% verification of traceability, documentation legibility, and compliance with all contractual specifications. Subcontractors are bound by the same requirements and must be vetted, monitored, and audited by the prime contractor. The contract mandates zero-defect acceptance for final inspection, prohibits mercury or unauthorized modifications, and enforces strict configuration control with formal Engineering Change Proposals required for any alterations. All documentation must be submitted electronically via ECDS, and waivers or deviations—classified as Critical, Major, or Minor—require explicit Contracting Officer approval. The product must be delivered within 365 days of contract effectiveness, and the warranty extends one year from delivery date. The contract is issued under a Navy-specific small business set-aside and is a DPAS-rated order for national defense use, with full compliance obligations under Buy American and other federal program requirements.
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This contract, issued by the Navsup Weapon Systems Support Mech, concerns the procurement of Hull Penetrating Assemblies designated as Special Emphasis material. Due to the critical nature of these shipboard systems, the contract mandates strict adherence to quality control, including Level I/SUBSAFE certification and comprehensive traceability from raw material to finished component. Key technical requirements include specific chemical and mechanical analyses for components like body connectors and headers, hydrostatic and electrical testing, and the prohibition of molybdenum disulfide lubricants. The agreement is a DO-rated order for national defense use, requiring a bilateral award and a one-year warranty on supplies. Contractors must maintain an ISO-9001 compliant quality system and submit detailed certification data, including chemical and mechanical analysis, at least 20 days prior to delivery. Final delivery is required within 365 days of the issue date. The contract also establishes rigorous protocols for configuration control, requiring formal Engineering Change Proposals for any modifications affecting form, fit, or function.

General Info

Contract Value

$562,400

NAICS

332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

N0010423QFB59.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER |TBD|N 00104|TBD|Material-S4306A; Certifications-N39040|N50286|TBD|133.2|N/A|N/A|Certifications - N39040|N/A|N/A|See DD Form 1423|contact@example.gov| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|335931|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| 1. THIS SOLICITATION IS BEING ISSUED UNDER EMERGENCY ACQUISITION FLEXIBILITIES. 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 4. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 5. Unless otherwise stated on the DD1423, submission of DD1423 certification data (CDRLs) will be on or before 20 days prior to the material delivery date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 365 days after issue date. 6. Note to distributors: If you are a distributor, your offer must be accompanied with a letter from the actual manufacturer indicating that you are an "authorized" distributor. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;7-21740 16275 - B LB01517 16275 G B LB01527 16275 C B LB01545 16275 E B LB01883 16275 B B LB01882 16275 - B LB01884 16275 A B LB01544 16275 P B LB01600 16275 K B ITI-500 16275 V B QA-1129 16275 E B; 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| | | DOCUMENT REF DATA=SAE AMS 5666 | | |J |161101|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Hull Penetrating Assembly to be in accordance with LaBarge INC. drawing 7-21740 and LB01517, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body Connector, Find No. 1 on drawing LB01517; Material - ;QQ-N-286 Form 2, annealed and age hardened and meeting the mechanical properties of Drawing LB01527 note 9; Part - ;Header, Find No. 1 on drawing LB01544; Material - ;QQ-N-286 Form 2, annealed and age hardened and meeting the mechanical properties of drawing LB01600 note 8 or SAE AMS 5666 round bar, hot finished and annealed and meeting the mechanical properties of drawing LB01600 note 9; Part - ;Washer, Find No. 7 on drawing LB01517; Material - ;QQ-N-286 Form 2, annealed and age hardened and meeting the mechanical properties of drawing LB01883 note 6; Part - ;Hex Nut, Find No. 8 on drawing LB01517; Material - ;QQ-N-286 Form 2, annealed and age hardened and meeting the mechanical properties of drawing LB01882 note 6; Part - ;Spacer, Find No. 13 on drawing LB01517; Material - ;QQ-N-286 Form 2, annealed and age hardened and meeting the mechanical properties of drawing LB01884 note 6; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Electrical testing; Item - ;Each hull penetrator assembly; Performance - ;In accordance with Labarge INSPECTION / TEST INSTRUCTIONS ITI-500; Acceptance - ;In accordance with Labarge INSPECTION / TEST INSTRUCTIONS ITI-500; Test - ;Hydrostatic Tests; Item - ;Each Assembly; Performance - ;In accordance with Labarge INSPECTION / TEST INSTRUCTIONS ITI-500; Acceptance - ;In accordance with Labarge INSPECTION / TEST INSTRUCTIONS ITI-500; Test - ;Tensile Test (after glass sealing and age hardening process); Item - ;One test specimen for each combination of starting material heat lot and age hardening batch when headers are made from QQ-N-286; Performance - ;Per drawing LB01544 note 13; Acceptance - ;Per drawing LB01544 note 13; Test - ;Tensile Test (after glass sealing); Item - ;One test specimen for each heat lot when headers are made from SAE AMS 5666; Performance - ;Per drawing LB01544 note 14; Acceptance - ;Per drawing LB01544 note 14; Test - ;Hardness test (after glass sealing and age hardening processes); Item - ;Each header when made from QQ-N-286; Performance - ;Per drawing LB01544 note 13; Acceptance - ;Per drawing LB01544 note 13; Test - ;Hardness test (after glass sealing); Item - ;Each header when made from SAE AMS 5666; Performance - ;Per drawing LB01544 note 14; Acceptance - ;Per drawing LB01544 note 14; Attribute - Annealing and Age Hardening Item - ;Body connector, Find No. 1; Washer, Find No. 7; Hex Nut, Find No. 8; and Spacer, Find No. 13 on drawing LB01517 and header on drawing LB01600 (when made from QQ-N-286); Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.6 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.7 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.7.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.7.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.7.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.8 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.9 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: +1 (555) 000-0000 FAX: +1 (555) 000-0000 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: +1 (555) 000-0000 FAX: +1 (555) 000-0000 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: +1 (555) 000-0000 FAX: +1 (555) 000-0000 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: +1 (555) 000-0000 FAX: +1 (555) 000-0000 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: +1 (555) 000-0000 3.11 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.11.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.12 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.13 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.13.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.13.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.13.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.14 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.15 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.16 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.16.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.16.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.16.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.16.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.16.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.17 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.17.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.17.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.18 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.18.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.18.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.18.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.18.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.18.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.19 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.19.1 Visual examination upon receipt to detect damage during transit. 3.19.2 Inspection for completeness and proper type. 3.19.3 Verification of material quality received. 3.19.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.19.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.19.6 Identification and protection from improper use or disposition. 3.19.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.19.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.19.9 Material returned to the contractor must be handled as GFM. 3.20 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.20.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.21 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.21.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.21.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.21.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.21.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.22 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.22.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.22.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirement...

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
VALVE,GLOBE
Solicitation # N0010426QFE70
This fixed-price solicitation from NAVSUP Weapon Systems Support Mechanicsburg is for the procurement of a Globe Valve (NSN 4820-01-211-8826) designated as a Critical Safety Item and Special Emphasis Material Level I. Due to the high risk associated with failure in crucial shipboard systems, the contract mandates strict quality assurance, comprehensive material traceability, and adherence to TDP Version 013. The scope includes the delivery of the valve to the Portsmouth Naval Shipyard within 365 days, with a requirement for a Certificate of Compliance and detailed test certifications submitted via Wide Area Workflow for review and acceptance prior to shipment. Technical requirements specify the use of ASTM-A276 or ASTM-A479 UNS S31600 material for key components, including the body, bonnet, union nut, and stem assembly. The contractor must maintain a quality system compliant with ISO-9001 and follow rigorous inspection standards for threads, pressure tests, and non-destructive testing. Award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Additionally, the contractor must comply with strict cybersecurity reporting under clause 252.204-7012 and follow MIL-STD-2073 and MIL-STD-129 for packaging and marking.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 15 days
View Details
NAICS: 335931
New
Federal
59--CONNECTOR,ELECTRIC
Solicitation # N0010426RFE40
Solicitation N00104-26-R-FE40, issued by NAVSUP Weapon Systems Support, is for the procurement of electric connectors (NSN 1HM 5935-01-542-5968). These components are designated as Critical Safety Items (CSI) and Special Emphasis material because their failure could result in serious personnel injury, loss of life, or the loss of a ship. Due to this criticality, the contract mandates rigorous quality controls, including a requirement for the contractor to maintain a quality system compliant with ISO-9001 or MIL-I-45208. The contract requires extensive testing and certification. Both contractor-led and government-led destructive First Article Testing (FAT) are mandatory, with government testing conducted at the Portsmouth Naval Shipyard. Key technical requirements include the use of QQ-N-286 material for specific penetrator and receptacle components, strict adherence to MIL-DTL-24231, and the prohibition of molybdenum disulfide thread lubricants. Comprehensive certifications are required for production tests, dye penetrant inspection, liquid penetrant inspection, and ultrasonic inspection of starting materials. Award will be made to a single technically acceptable offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important than price. All deliverables must be processed through the Wide Area Workflow (WAWF) system, and a detailed Certificate of Compliance is required to ensure full traceability and adherence to all invoked specifications and drawings. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129 standards.
Current-Carrying Wiring Device Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0010426QTA53
This contract solicits repair services for a specific circuit card assembly, identified by Cage Code 23905 and reference number 949A9131-101. It requires the contractor to perform repairs in accordance with detailed technical specifications, including adherence to original manufacturer manuals, standards, drawings, and applicable quality requirements. The contractor must ensure all repaired items meet functional and operational standards, complete inspection and testing procedures, and properly mark the items per MIL-STD-130 guidelines. The government mandates a Repair Turnaround Time (RTAT) of 197 days, measured from the physical receipt of the asset to final government acceptance, and requires source inspection. Failure to meet RTAT deadlines may result in negotiated price reductions, while excusable delays will not incur penalties. The contract is structured as a firm-fixed-price arrangement with options for increased quantities at the same unit price. Freight terms specify FOB Origin with shipment handled by the Navy via the Commercial Asset Visibility system. Documentation and certifications must be maintained and accessible, and changes to design or parts require prior government approval, except for designated part number changes under a specified code. The solicitation includes requirements for contractor representations and certifications and references cybersecurity maturity model certification obligations effective November 2025. Offers must include pricing, RTAT, and capacity information, and only authorized distributors for the original manufacturer’s items will be considered for award. The Department of Defense office overseeing this contract is located in Mechanicsburg, PA, with contact available for clarification until the response deadline.
Bare Printed Circuit Board Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 333998
New
Federal
53--HOIST STRAP
Solicitation # N0010426QAB90
Solicitation N0010426QAB90 is a total small business set-aside, fixed-price request for quotations issued by NAVSUP Weapon Systems Support Mech for the manufacture of three Hoist Strap Assemblies (P/N: 5641754-303, NIIN: LWM046472). The contractor must ensure all materials are assembled in strict adherence to Drawing 5641754 Rev E and comply with MIL-STD-130 for marking and MIL-STD-973 for configuration control. Delivery is required within 90 days on an FOB Destination basis. Award will be granted to the responsible offeror providing the lowest priced, technically acceptable offer, with the government utilizing SPRS risk assessments to evaluate item, price, and supplier performance risks. The contract mandates Government Source Inspection per FAR 52.246-2, with inspection and acceptance occurring at the origin. Contractors are required to maintain all inspection records for the duration of the performance period and for 365 calendar days following final delivery. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific packing levels based on the shipment destination. Administrative requirements include electronic invoicing via the Wide Area Workflow system and compliance with DFARS 252.204-7012 regarding the safeguarding of covered defense information. All hazardous material submissions must include GHS-compliant labels and Safety Data Sheets sent to NAVSUP WSS Code N242.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS