Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 11, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

61--CABLE ASSY LAUNCHER

Awarded
SPRMM120QRE11Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335929
New
DIBBS
WIRING HARNESS, BRANCHED
Solicitation # SPE4A6-27-R-X143
Solicitation SPE4A6-27-R-X143 is an Indefinite Delivery Purchase Order issued by the DLA Weapons Support ASC Commodities Division for the procurement of branched wiring harnesses, identified by NSN 6150-00-884-2069. The contract is structured as a total small business set-aside with a base period of five years and a total contract ceiling of 350,000 dollars. The government requires an estimated quantity of 120 units for the first and second years of the base period, with a required delivery lead time of 90 days after receipt of order to various CONUS stock locations. Award will be based on best value, weighing price, past performance, and other non-price factors, with SPRS assessments and historical quality and delivery compliance being primary considerations. The contractor must adhere to stringent technical and security standards, including ISO 9001 2015 quality standards and CMMC Level 2 certification via a Certified Third-Party Assessment Organization. Technical data is subject to ITAR or EAR export controls, requiring authorization for disclosure to foreign persons. Packaging and marking must comply with MIL-STD-129 and MIL-STD-2073-1E, with specific requirements for physical item marking and the removal of government identification from non-accepted supplies. Invoicing and payment processing are conducted electronically through the Wide Area WorkFlow system. Inspection and acceptance will occur at the destination, with the government reserving the right to perform Product Verification Testing at designated laboratories.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 335929
New
DIBBS
CABLE, SPECIAL PURPOSE,
Solicitation # SPE7M1-27-T-1777
Solicitation SPE7M1-27-T-1777 is a request for quotations from the Defense Logistics Agency (DLA) Weapons Support Maritime Supply Chain for the procurement of 11,500 feet of special purpose electrical cable, identified by NSN 6145-01-217-6852. The requirement allows for a quantity variance of plus or minus 5 percent. Delivery is required within 119 days after receipt of order, with a need ship date of March 9, 2027, and a final required delivery date of September 2, 2027. The place of performance and delivery is the DLA Distribution DDSP New Cumberland facility in Pennsylvania, with shipping and inspection terms set as FOB Origin. The contract is subject to strict technical data export controls under ITAR and EAR, requiring contractors to have approved US/Canada Joint Certification Program certification and completed specific DLA training to access data. Compliance with various military standards is mandatory, including MIL-DTL-12000 for preservation and packaging, MIL-STD-2073-1E for packaging data, and MIL-STD-129 for marking. Additionally, the manufacturer's inspection system must comply with SAE AS9003 or ISO 9001. Payment and invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. While the solicitation is listed as a total small business set-aside in some metadata, the document text specifies it is not a small business set-aside. All quotes must be submitted via the DIBBS portal by November 9, 2026.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 11 days
NAICS: 335929
New
DIBBS
CABLE, POWER, ELECTRICAL
Solicitation # SPE7M2-27-T-0514
Solicitation SPE7M2-27-T-0514 is a request for 24,000 feet of electrical power cable (NSN 6145012248308) for the DLA Weapons Support Nuclear Reactor Program. The requirement specifies a quantity variance of plus or minus 5% and mandates that the material be provided in continuous lengths, with a minimum length of 250 feet and 500 feet per reel. The procurement is a total small business set-aside under NAICS code 335929, with delivery required within 167 days of award, targeting a need ship date of April 26, 2027, and a final delivery date of June 6, 2027. Delivery is FOB Origin, with inspection and acceptance occurring at the destination facility in New Cumberland, Pennsylvania. The contractor must adhere to strict technical and quality standards, including MIL-DTL-24640/16E and MIL-DTL-24640C. Packaging and preservation must comply with MIL-DTL-12000 and MIL-STD-2073-1E, while marking must follow MIL-STD-129. The contract prohibits the use of Class I ozone-depleting substances and the intentional addition of mercury or mercury-containing compounds, except for specific functional exceptions. Compliance with the Buy American Act, the Berry Amendment, and DFARS cybersecurity and hazardous material reporting requirements is mandatory. All quotes must be submitted via the DLA Internet Bid Board System (DIBBS), and invoicing is to be processed through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

1 day ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract is a high priority Navy requirement for the manufacture of Cable Assembly Launchers under SEPA authority. Originally a small business set-aside, the requirement has been dissolved and resolicited as an unrestricted acquisition open to both small and large businesses. The scope includes strict adherence to NAVSEA S9320-AM-PRO-020/MLDG certification, MIL-STD-130 marking, and a total prohibition of metallic mercury to prevent contamination of submarine and surface ship systems. The contract mandates a rigorous quality assurance process, including First Article Testing (FAT) and 100 percent production lot testing. A detailed delivery schedule is established, spanning 540 days from the date of contract, with specific milestones for the submission and approval of quality control plans, test procedures, and material certifications. Awardees must maintain active registration in the System for Award Management (SAM) and comply with government source inspection and military packaging requirements.

General Info

Contract Value

$677,178

NAICS

335929 - Other Communication and Energy Wire Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

2

SPRMM120QRE110001.pdf

PDF

SPRMM120QRE11.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Nov 30, 2020 to Dec 11, 2020. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → SPRMM1 DLA Mechanicsburg
Contacts1 person available
OfficeMECHANICSBURG, PA, 17055-0788, USA
Office AddressMECHANICSBURG, PA, 17055-0788, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2017) (DEVIATION 2018-O0018)|5|||||contact@example.gov | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|See CDRLs, DD 1423 in back of solicitation |||||||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|335929|1000|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|3|See CDRLs, DD 1423 in back of solicitation ||| This amendment is issued to dissolve the small business set aside and resolicit as an UNRESTRICTED requirement to allow both small and large businesses to submit offers. If you have any questions, please call or email: Mark C. McWhorter, +1 (555) 000-0000, Email: contact@example.gov Please provide the following information with your quote: Contract-Award CAGE: ____________ Quote #: _________________________ P/N verify________________________ Inspection (CAGE) _________________________________ Acceptance (CAGE) _________________________________ Delivery Timeline __________________ Option Price ______________________ Option Validity Timeline _________________ FOB (S or D) _________ IMPORTANT - This Solicitation is issued under SEPA Authority. This is a High Priority Navy requirement. Please provide your quote as soon as possible to fill this urgently needed item. Military packaging is required. Government source inspection is required. In order to receive an award from this solicitation, you MUST have a current registration in the System for Award Management (SAM); with no exclusions. You must also have current FAR and DFAR registrations on file. The website to register in SAM is: https://www.sam.gov/portal/public/SAM/ IMPORTANT information for Dealers Traceability - please read and follow clauses DLATERMHZ01 & DLATERMHZ03. These clauses contain IMPORTANT traceability information that dealers MUST submit to be considered for this order. FAT & PLT: This order requires FAT and PLT testing requirements. Please refer to the technical date package (TDP) and DD 1423, CONTRACT DATA REQUIREMENTS LIST (CDRL) for specific instructions. See Solicitation Notes for CDRL timelines. SUGGESTED DELIVERY SCHEDULE, AFTER DATE OF CONTRACT (ADC), IS AS FOLLOWS: A001-Submit Quality Control Inspection/Test Plan - 30 days ADC Approval of Quality Control Inspection/Test Plan - 60 days ADC A002 - Submit First Article Test/Inspection Procedure - 90 days ADC Approval of First Article Test/Inspection Procedure - 120 days ADC A004 - Submit Certificate of Compliance - Material (Molds) - 150 days ADC Approval of Certificate of Compliance - Material (Molds) - 180 days ADC A005 - Submit Visual Dimensional Inspection Report (Molds) - 210 days ADC Approval of Visual Dimensional Inspection Report (Molds) - 240 days ADC A003 - Submit First Article Test/Inspection Report - 360 Days ADC Approval of First Article Test/Inspection Report - 390 Days ADC A006 - Submit Bulk Cable Inspection Test Report - 420 Days ADC Approval of Bulk Cable Inspection/Test Report - 450 Days ADC A007 - Submit Certificate of Conformance - 420 days ADC Approval of Bulk Certificate of Conformance - 450 days ADC A008 - Submit Certificate of Compliance for various items - 420 days ADC Approval of Certificate of Compliance - 450 days ADC A009 - Submit Bulk Cable Inspection/Test Report - 420 days ADC Approval of Bulk Cable Inspection Test Report - 450 days ADC A00A - Submit Cable Assembly Inspection/Test Report 480 days ADC Approval of Cable Assembly Inspection/Test Report 510 days ADC A00B - Submit Mercury Exclusion Certificate - 480 days ADC Approval of Mercury Exclusion Cert - 510 days ADC Final Shipment of production units - 540 days ADC If the suggested delivery schedule is not agreeable, please revise the above schedule to show your quoted delivery schedule. contact@example.gov ; +1 (555) 000-0000 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSY LAUNCHER . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=6292767 |53711| B|FN |D|0001 | B|49998|0009641 DRAWING DATA=6292767 |53711| B|FN |D|0002 | B|49998|0005626 DRAWING DATA=6292767 |53711| B|FN |D|0003 | B|49998|0005167 DRAWING DATA=7454380 |53711| A|VD |D|0001 | A|49998|0392364 DOCUMENT REF DATA=MIL-STD-129 | | |R |180524|A| | | DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=ISO9001:2015 | | | | |A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CABLE ASSY LAUNCHER furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 7454380-2 ; 3.2 ;Vendor will ensure a copy of the conformance test plan, report and certificate will be placed in each box/package.; 3.2.1 NAVSEA S9320-AM-PRO-020/MLDG - Manufacture of this item requires vendor certification in accordance with NAVSEA S9320-AM-PRO-020/MLDG. 3.2.2 ;Per the NAVSEA molding manual (S9320-AM-PRO-020/MLDG REV 2), in process step number 4-9 (PRESHIPMENT INSPECTION), the manual states: "ensure test inspection report (DS9: appendix II-F),is properly completed and is packaged with cable assembly".; 3.3 Source Control Item - Previous delivery of the specified National Stock Number or similar item manufactured to technical procurement specifications and/or drawings supplied by a Government activity or Price Contractor does not in itself qualify a supplier as a Government approved source. Only those sources for this item previously approved by the Government have been solicited. The time required for approval of a new supplier is normally such that award cannot be delayed pending approval of the new source. If you have not been solicited and you can furnish either (a) proof of your prior approval as a supplier of this item, or (b) data showing you have produced the same or similar items satisfactorily for the Government or a commercial source, or (c) test data indicating your product can meet service operating requirements, or (d) other pertinent data concerning your qualificatin to produce the required item, notify the Procurement Contracting Officer in writing, furnishing said proof of data for evaluation possibly leading to your firm being authorized as an approved source for this procurement or subsequent procurements. 3.4 First Article Test Procedures are required and must be approved prior to any First Article Testing. 3.5 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.6 Hydrostatic Test - Hydrostatic Testing of the CABLE ASSY LAUNCHER shall be in accordance with ;Note 18 F on Dwg 7454380; . 3.7 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.8 Serialization - The supplier shall mark a serial number on each CABLE ASSY LAUNCHER in accordance with ;DWG 7454380 NOTE 15; . Actual serial numbers will be assigned ;by the ISEA, NUWC Divsion, Keyport, 610 Dowell St., Keyport WA 98345, Code 435; . 3.9 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.10 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.11 Vendor Waivers/Deviations - Compliance with the delivery date and technical requirements of NAVICP-MECH Repair Part Material contracts is expected. As a cautionary note, seller intended use of any material which is not in full compliance with the specified contract technical requirements shall be identified as an exception in response to this solicitation. Request for delivery date extensions and waivers/deviations shall be accompanied by an explanation of the cause for the delay, or the reason for the requested nonconformance to this solicitation in the event the Procurement Contracting Officer (PCO) concurs with your request. Request for waivers/deviations shall provide justification for the requested change including an evaluation which demonstrates that proposed nonconformance will not affect the quality, form, fit, or function of the part. Requests for Waiver/Deviations shall be presented to the Government Quality Assurance Representative (QAR) for comment. (The QAR shall forward the request, with their comments, directly to the post award PCO within five working days after receipt.) 3.12 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD 023; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208. 4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies. 4.5 First Article Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). The test procedures shall be approved prior to production. There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure previously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.6 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production. 4.7 Production Lot Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure proviously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.8 Production Lot Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). 4.9 Production Lot Test (Contractor) - The Contractor shall perform 100% production testing in accordance with ;Note 18 of Dwg 7454380 Quality Conformance Testing of all manufactured cable assemblies.; . 4.10 Material Certification - The material composition inspection shall consist of a certification that material requirements have been met. The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. Unique Item Identification (UID) per requiremetns of MIL-STD-130N shall be procured/manufactured by vendor and affixed in approximate location shown on DWG 7454380. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. Engineering source of supply approval is RYAN SODERLUND. Contact phone number is +1 (555) 000-0000 Email address is contact@example.gov Changed 1423 DIDs from "SD" to "SS" after coordination with Joe Thompson and Steve Sheridan. DATE OF FIRST SUBMISSION=030 DAC ;A FAT PLAN SHALL BE DEVELOPED AND SUBMITTED FOR APPROVAL/DISAPPROVAL IAW REQUIREMENTS DENOTED IN NOTE 18 OF DWG 7454380.ACCEPTANCE AUTHORITY FOR THE FI RST ARTICLE TEST PLAN & PROCEDURES IN NUWC KEYPORT, CODE 435 IS: RYAN SODERLUND contact@example.gov CODE 435 UIC:00253 PH#+1 (555) 000-0000 ; ;;A copy of the approved test plan & procedures will be provided to the DCMA QAR to utilize for the review and signing of the CDRL in WAWF/IRAP-T.;; DATE OF FIRST SUBMISSION=ASREQ ;APRROVAL AND ACCEPTANCE AUTHORITY FOR THE FIRST ARTICLE TEST REPORT IS NUWC KEYPORT, CODE 435, ATTENTION TO: RYAN SODERLUND contact@example.gov CODE 435 UIC:00253 PH#+1 (555) 000-0000; ; ;A copy of the approved report will be provided to the DCMA QAR to utilize for the review and signing of the CDRL in WAWF/IRAPT. ; DATE OF FIRST SUBMISSION=030 DAC ;VENDOR SHALL DEVELOP A 100% PRODUCTION LOT QUALITY CONFORMANCE TESTING PLAN, A COPY WILL BE PROVIDED TO RYAN SUNDERLAND, NUWC KEYPORT, CODE 435 AT EMAIL: contact@example.gov, A COPY WILL ALSO BE PROVIDED TO THE DCMA QAR.; ;QUALITY CONFORMANCE TESTING PLAN SHALL INCLUDE ALL ELEMENTS OF NOTE 18, A THROUGH G.; ;SUPPLIER FORMAT IS ACCEPTABLE; DATE OF FIRST SUBMISSION=ASREQ ;VENDOR SHALL CONDUCT QUALITY CONFORMANCE TESTING TO VERIFY COMPLETED CABLE ASSEMBLY MEETS OR EXCEEDS REQUIREMENTS OF VICD 7454380 AND NAVSEA S9320-AM-PRO-020/MLDG.; TWO (2) COPIES OF THE QUALITY CONFORMANCE TEST RESULTS ARE REQUIRED PER UNIT DELIVERED TO THE GOVERNMENT. ONE WILL ACCOMPANY THE ASSEMBLY AND THE OTHER SHALL BE FORWARDED TO THE ISEA, NUWC KEYPORT. CONTRACTS WITH MULITIPLE ORDERS UPON REQUEST AND APPROVAL OF THE PCO BATCH THE TEST RESULTS FROM A SINGLE PRODUCTION RUN AND SUBMIT A CONSOLIDATED REPORT TO THE ISEA. REPORTS SHIPPED WITH UNITS SHALL BE INSIDE THE PACKAGING. ;A COPY OF THE TEST REPORT WILL BE PROVIDED TO THE DCMA QAR.; ;SUPPLIER FORMAT IS ACCEPTABLE; DATE OF FIRST SUBMISSION=ASREQ ;CERTIFICATE OF CONFORMANCE IS IN ADDITION TO QUALITY CONFORMANCE TEST RESULTS. CERTIFICATE OF CONFORMANCE SHALL SPECIFY CABLE ASSEMBLIES MEETS OR EXCEEDS ALL REQUIREMENTS OF VICD AND PASSES ALL QUALITY TESTS. CERTIFICATES OF CONFORMANCE SHALL BE PROVIDED FOR EACH MANUFACTURED CABLE AND A COPY PROVIDED TO THE DCMA QAR AND NUWC CODE 435, EMAILED TO: contact@example.gov, A COPY WILL ALSO BE INCLUDED IN EACH BOX/PACKAGE.; ;SUPPLIER FORMAT IS ACCEPTABLE; DATE OF FIRST SUBMISSION=ASREQ ;SUPPLIER FORMAT IS ACCEPTABLE; ;A COPY WILL BE PROVIDED TO THE DCMA QAR FOR REVIEW AND APPROVAL.;

More opportunities from Department Of Defense → SPRMM1 DLA Mechanicsburg

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS