Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 18, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

61--CABLE ASSY LAUNCHER

Awarded
SPRMM120QRE10Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335999
New
DIBBS
WIRING HARNESS
Solicitation # SPE4A6-27-R-X142
Solicitation SPE4A6-27-R-X142 is an Indefinite Delivery Purchase Order (IDPO) issued by the Defense Logistics Agency (DLA) Weapons Support ASC Commodities Division for the procurement of wiring harnesses under National Stock Number 5995-01-705-8842. The contract is designed as a fixed-price agreement with a base period of five years, remaining valid until the aggregate total of orders reaches a ceiling of 350,000 dollars. The primary requirement consists of 50 units, with a total delivery timeline of 509 days, which includes 90 days for First Article Testing (FAT) and 329 days for production following FAT approval. Delivery is to be made to various CONUS stock locations, with FOB destination terms applying specifically to FAT requirements. The contract mandates strict quality and security compliance, including ISO 9001:2015 standards and Cybersecurity Maturity Model Certification (CMMC) Level 2. Technical data is subject to ITAR and EAR export controls, and contractors must adhere to DFARS 252.204-7012 for safeguarding covered defense information. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, respectively. Award determination is based on best value, weighing price, past performance, and quoted delivery, with a heavy emphasis on SPRS assessments and historical quality and delivery compliance. Invoicing and payment are processed electronically through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 1 hour ago

DEADLINE

in 12 days

AI Contract Overview

Show more

DLA Land and Maritime is soliciting a contract for 25 units of Cable Assembly Launcher, identified by NSN 1H-6145-015688538-WN and part number 7454380-1. The items are to be delivered to DLA Distribution centers in New Cumberland, Pennsylvania, and Tracy, California. AMETEK SCP INC is currently the approved source, as the part requires specific engineering source approval and design control to maintain quality due to proprietary data rights and specialized manufacturing knowledge. This acquisition is 100 percent set aside for small business concerns, with the specific set-aside category to be detailed in the solicitation. The procurement includes FAT and PLT requirements and does not follow FAR Part 12 policies for commercial items, although interested parties may notify the contracting officer of commercial capabilities. The solicitation is managed by DLA Mechanicsburg and is available through the SAM website.

General Info

Contract Value

$497,825

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

2

SPRMM120QRE100001.pdf

PDF

SPRMM120QRE10.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 9, 2020 to Dec 4, 2020. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → SPRMM1 DLA Mechanicsburg
Contacts1 person available
OfficeMECHANICSBURG, PA, 17055-0788, USA
Office AddressMECHANICSBURG, PA, 17055-0788, USA

Full Description

Show more
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2017) (DEVIATION 2018-O0018)|5|||||contact@example.gov | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|See CDRLs, DD 1423 in back of solicitation See Remarks on page 2-3|||||||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (JUN 2020))|7|||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|335929|1000|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| EVALUATION OF FIRST ARTICLE TESTING|3|See CDRLs, DD 1423 in back of solicitation See Remarks on page 2-3 ||| This amendment is issued to dissolve the small business set aside and resolicit as an UNRESTRICTED requirement to allow both small and large businesses to submit offers. FOB is changed from D (destination) to S (source). If you have any questions, please call or email: Mark C. McWhorter, +1 (555) 000-0000, Email: contact@example.gov \ Please provide the following information with your quote: Contract-Award CAGE: ____________ Quote #: _________________________ P/N verify________________________ Inspection (CAGE) _________________________________ Acceptance (CAGE) _________________________________ Delivery Timeline __________________ Option Price ______________________ Option Validity Timeline _________________ FOB (S or D) _________ IMPORTANT - This Solicitation is issued under SEPA Authority. This is a High Priority Navy requirement. Please provide your quote as soon as possible to fill this urgently needed item. Military packaging is required. Government source inspection is required. In order to receive an award from this solicitation, you MUST have a current registration in the System for Award Management (SAM); with no exclusions. You must also have current FAR and DFAR registrations on file. The website to register in SAM is: https://www.sam.gov/portal/public/SAM/ IMPORTANT information for Dealers Traceability - please read and follow clauses DLATERMHZ01 & DLATERMHZ03. These clauses contain IMPORTANT traceability information that dealers MUST submit to be considered for this order. FAT & PLT: This order requires FAT and PLT testing requirements. Please refer to the technical date package (TDP) and DD 1423, CONTRACT DATA REQUIREMENTS LIST (CDRL) for specific instructions. See Solicitation Notes for CDRL timelines. SUGGESTED DELIVERY SCHEDULE, AFTER DATE OF CONTRACT (ADC), IS AS FOLLOWS: A001-Submit Quality Control Inspection/Test Plan - 30 days ADC Approval of Quality Control Inspection/Test Plan - 60 days ADC A002 - Submit First Article Test/Inspection Procedure - 90 days ADC Approval of First Article Test/Inspection Procedure - 120 days ADC A004 - Submit Certificate of Compliance - Material (Molds) - 150 days ADC Approval of Certificate of Compliance - Material (Molds) - 180 days ADC A005 - Submit Visual Dimensional Inspection Report (Molds) - 210 days ADC Approval of Visual Dimensional Inspection Report (Molds) - 240 days ADC A003 - Submit First Article Test/Inspection Report - 360 Days ADC Approval of First Article Test/Inspection Report - 390 Days ADC A006 - Submit Bulk Cable Inspection Test Report - 420 Days ADC Approval of Bulk Cable Inspection/Test Report - 450 Days ADC A007 - Submit Certificate of Conformance - 420 days ADC Approval of Bulk Certificate of Conformance - 450 days ADC A008 - Submit Certificate of Compliance for various items - 420 days ADC Approval of Certificate of Compliance - 450 days ADC A009 - Submit Bulk Cable Inspection/Test Report - 420 days ADC Approval of Bulk Cable Inspection Test Report - 450 days ADC A00A - Submit Cable Assembly Inspection/Test Report 480 days ADC Approval of Cable Assembly Inspection/Test Report 510 days ADC A00B - Submit Mercury Exclusion Certificate - 480 days ADC Approval of Mercury Exclusion Cert - 510 days ADC Final Shipment of production units - 540 days ADC If the suggested delivery schedule is not agreeable, please revise the above schedule to show your quoted delivery schedule. contact@example.gov ; +1 (555) 000-0000 \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSY LAUNCHER . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=6292767 |53711| B|FN |D|0001 | B|49998|0009641 DRAWING DATA=6292767 |53711| B|FN |D|0002 | B|49998|0005626 DRAWING DATA=6292767 |53711| B|FN |D|0003 | B|49998|0005167 DRAWING DATA=7454380 |53711| A|VD |D|0001 | A|49998|0392364 DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | DOCUMENT REF DATA=MIL-C-915 |0002| |A |700925|A| | | DOCUMENT REF DATA=MIL-STD-2073 | | | |840716|A| | | DOCUMENT REF DATA=ISO-9001 | | |- |940701|A| | | DOCUMENT REF DATA=ISO_9001 | | |- |081115|A| | | DOCUMENT REF DATA=ISO 9002 | | |- |940701|A| | | DOCUMENT REF DATA=MIL-W-22759 |0011| |F |041208|A| 1| | DOCUMENT REF DATA=MIL-M-24041 | | |C |881220|A| | | DOCUMENT REF DATA=MIL-C-24217 | | |A |890117|A| 1| |1 DOCUMENT REF DATA=MIL-C-24643 |0001| |B |970331|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |951103|A| 2| | DOCUMENT REF DATA=MIL-HDBK-454 | | |B |070415|A| | | DOCUMENT REF DATA=ISO9001 | | |- |001215|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CABLE ASSY LAUNCHER furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;ODNZ3 7454380-1; 3.1.1 NAVSEA S9320-AM-PRO-020/MLDG - Manufacture of this item requires vendor certification in accordance with NAVSEA S9320-AM-PRO-020/MLDG. 3.1.2 ;Per the NAVSEA molding manual (S9320-AM-PRO-020/MLDG REV 2), in process step number 4-9 (PRESHIPMENT INSPECTION), the manual states: "ensure test inspection report (DS9: appendix II-F),is properly completed and is packaged with cable assembly".; 3.2 Source Control Item - Previous delivery of the specified National Stock Number or similar item manufactured to technical procurement specifications and/or drawings supplied by a Government activity or Price Contractor does not in itself qualify a supplier as a Government approved source. Only those sources for this item previously approved by the Government have been solicited. The time required for approval of a new supplier is normally such that award cannot be delayed pending approval of the new source. If you have not been solicited and you can furnish either (a) proof of your prior approval as a supplier of this item, or (b) data showing you have produced the same or similar items satisfactorily for the Government or a commercial source, or (c) test data indicating your product can meet service operating requirements, or (d) other pertinent data concerning your qualificatin to produce the required item, notify the Procurement Contracting Officer in writing, furnishing said proof of data for evaluation possibly leading to your firm being authorized as an approved source for this procurement or subsequent procurements. 3.3 ;A Quality Conformance Test Plan (QCTP) shall be submitted for government approval. Approval of this plan is required prior to scheduling First Article testing. The In-Service Engineering Agent (ISEA), Naval Undersea Warfare Center Division Keyport Code 435, will witness First Article Testing (see dwg 7454380 Note 22). If First Article testing is waived, approval of the QCTP is required prior to testing the first production lot unit. The Defense Contract Management Agency will act as the ISEA's designated representative (per note 18) and will witness quality conformance testing on the first production lot unit.; 3.4 First Article Test Procedures are required and must be approved prior to any First Article Testing. 3.5 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.6 Hydrostatic Test - Hydrostatic Testing of the CABLE ASSY LAUNCHER shall be in accordance with ;Note 18 F on Dwg 7454380; . 3.7 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.8 Serialization - The supplier shall mark a serial number on each CABLE ASSY LAUNCHER in accordance with ;DWG 7454380 NOTE 15; . Actual serial numbers will be assigned ;by the ISEA, NUWC Divsion, Keyport, 610 Dowell St., Keyport WA 98345, Code 435; . 3.9 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.10 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.11 Vendor Waivers/Deviations - Compliance with the delivery date and technical requirements of NAVICP-MECH Repair Part Material contracts is expected. As a cautionary note, seller intended use of any material which is not in full compliance with the specified contract technical requirements shall be identified as an exception in response to this solicitation. Request for delivery date extensions and waivers/deviations shall be accompanied by an explanation of the cause for the delay, or the reason for the requested nonconformance to this solicitation in the event the Procurement Contracting Officer (PCO) concurs with your request. Request for waivers/deviations shall provide justification for the requested change including an evaluation which demonstrates that proposed nonconformance will not affect the quality, form, fit, or function of the part. Requests for Waiver/Deviations shall be presented to the Government Quality Assurance Representative (QAR) for comment. (The QAR shall forward the request, with their comments, directly to the post award PCO within five working days after receipt.) 3.12 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD023; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208. 4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies. 4.5 First Article Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). The test procedures shall be approved prior to production. There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure previously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.6 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production. 4.7 Production Lot Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure proviously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.8 Production Lot Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). 4.9 Production Lot Test (Contractor) - The Contractor shall perform 100% production testing in accordance with ;Note 18 of Dwg 7454380 Quality Conformance Testing of all manufactured cable assemblies.; . 4.10 Material Certification - The material composition inspection shall consist of a certification that material requirements have been met. The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. Unique Item Identification (UID) per requiremetns of MIL-STD-130N shall be procured/manufactured by vendor and affixed in approximate location shown on DWG 7454380. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. Engineering source of supply approval is Steven Sheridan. Contact phone number is +1 (555) 000-0000 Email address is contact@example.gov Serial numbers will be sent to NUWC Keyport point of contact Stephanie Smith at email contact@example.gov, PH# +1 (555) 000-0000. DATE OF FIRST SUBMISSION=030 DAC ;A FAT PLAN SHALL BE DEVELOPED AND SUBMITTED FOR APPROVAL/DISAPPROVAL IAW REQUIREMETNS DENOTED IN NOTE 18 OF DWG 7454380.; DATE OF FIRST SUBMISSION=ASREQ ;FIRST ARTICLE TESTING SHALL BE IN ACCORDANCE WITH THE APPROVED TEST PLAN AND AS WITNESSED BY THE GOVERNEMENT FOR SOURCES NOT PREVIOUSLY QUALIFIED IN BTC MANUFACTURING EFFORTS,; THE GOVERNMENT RESERVES THE RIGHT TO PERFORM ANY AND ALL FIRST ARTICLE TESTING AS A SEPERATE EFFORT TO VERIFY FIRST ARTICLE PERFORMANCE. VENDORS SHALL COST OUT FIRST ARTICLE TEST REQUIREMENTS SEPERATELY. DATE OF FIRST SUBMISSION=030 DAC ;VENDOR SHALL DEVELOP A 100% PRODUCTION LOT QUALITY CONFORMANCE TESTING PLAN AND SUBMIT FOR APPROVAL/DISAPPROVAL IN ACCORDANCE WITH NOTE 18 OF 7454380 AND NAVSEA S9320-AM-PRO-020/MLDG.; ;QUALITY CONFORMANCE TESTING PLAN SHALL INCLUDE ALL ELEMENTS OF NOTE 18, A THROUGH G.; DATE OF FIRST SUBMISSION=ASREQ ;VENDOR SHALL CONDUCT QUALITY CONFORMANCE TESTING TO VERIFY COMPLETED CABLE ASSEMBLY MEETS OR EXCEEDS REQUIREMENTS OF VICD 7454380 AND NAVSEA S9320-AM-PRO-020/MLDG.; TWO (2) COPIES OF THE QUALITY CONFORMANCE TEST RESULTS ARE REQUIRED PER UNIT DELIVERED TO THE GOVERNMENT. ONE WILL ACCOMPANY THE ASSEMBLY AND THE OTHER SHALL BE FORWARDED TO THE ISEA, NUWC KEYPORT. CONTRACTS WITH MULITIPLE ORDERS UPON REQUEST AND APPROVAL OF THE PCO BATCH THE TEST RESULTS FROM A SINGLE PRODUCTION RUN AND SUBMIT A CONSOLIDATED REPORT TO THE ISEA. REPORTS SHIPPED WITH UNITS SHALL BE INSIDE THE PACKAGING. DATE OF FIRST SUBMISSION=ASREQ ;CERTIFICATE OF CONFORMANCE IS IN ADDITION TO QUALITY CONFORMANCE TEST RESULTS. CERTIFICATE OF CONFORMANCE SHALL SPECIFY CABLE ASSEMBLIES MEETS OR EXCEEDS ALL REQUIREMENTS OF VICD AND PASSES ALL QUALITY TESTS. CERTIFICATES OF CONFORMANCE SHALL PROVIDED FOR EACH MANUFACTURED CABLE AND DELIVERED TO THE ISEA.;

More opportunities from Department Of Defense → SPRMM1 DLA Mechanicsburg

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS