Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

61--DISTRIBUTING SYSTEM, IN REPAIR/MODIFICATION OF

Active
N0038326QNB07Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This presolicitation under number N0038326QNB07 is for the acquisition of one unit of NSN 7R-6150-015673894-H1, delivered FOB Origin. Because the item is flight critical and requires specific engineering source approval by the design control activity to maintain quality, the government is primarily soliciting previously approved sources. The approved sources hold essential technical data and manufacturing knowledge that are not economically available to the government. Unapproved sources wishing to bid must submit a proposal along with the required documentation detailed in the NAVSUP Weapon Systems Support Source Approval Information Brochures. Failure to provide this data or proof of a pending application will result in the offer not being considered for award. The government is not utilizing FAR Part 12 for commercial items, though interested parties may notify the contracting officer of a commercial capability within 15 days of the notice.

General Info

Acquisition of one NSN 7R-6150-015673894-H1 unit requiring specific engineering source approval.

NAICS

335311 - Power, Distribution, and Specialty Transformer Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

1

RFQ NO0338-26-Q-NB07 - Distributing System Repair

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
Contacts

Full Description

Show more
CONTACT INFORMATION|4|N731.39|M3H|771-229-0588|marisa.l.tetkowski.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)|INSPECTION SITE SOURCE FINAL ACCEPTANCE SITE SOURCE|N/A|N00383|N/A|N/A|N/A|N/A||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This solicitation is for the repair of 1 unit of National Stock Number (NSN) 6150 015673894. Induction Period The induction period for the initial units in this order is 365 calendar days from the date of contract award. The Government reserves the right to extend this period by an additional 365 days, for a total of two years. Any unused induction slots from the initial year may be carried over into the second year. Pricing and Options The contractor shall propose option pricing for a maximum of 5 units over the entire contract period, inclusive of the initial quantity. If pricing will change after the first 365 days, please provide separate pricing for the second year. Contract Award The Government reserves the right to place the initial order for any number of units up to the specified maximum. For threshold purposes, the total contract value will be calculated by multiplying the highest proposed unit price by the maximum number of units. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: DISTRIBUTING SYSTEM ;450-075-421-109; P/N, ;1680-01-567-3894; NSN, ;PER CONTRACTOR REPAIR PROCEDURES; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. DISTRIBUTING SYSTEM ;PROJECTS UNLIMITED INC; Company Name , ;6300 SAND LAKE ROAD DAYTON, OH 45414-5802; Address , ;04597; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

Same NAICS industry code

NAICS: 335311
New
International
Design, Supply and Installation of the STATCOM
Solicitation # 25065
The British Columbia Hydro and Power Authority is conducting a Request for Information under solicitation number 25065 for the design, supply, and installation of a Static Synchronous Compensator (STATCOM) solution. This initiative is intended to support a major load project for a large industrial customer located within the North Thompson and Nicola regions of British Columbia. The project scope involves the design, factory simulation testing, supply, and installation of four STATCOMs at both new and existing substations. Technical requirements specify that equipment must be 24 MVAR or above with a base voltage of 138kV, and the STATCOM controller must be fully compatible with an existing 20-year-old ABB controller for a coordinated operation period of six to eight months. The procurement requires adherence to North American Standards, specifically IEEE C57.12.00 and CSA C88, with seismic qualification according to IEEE 693. Key deliverables include testing and commissioning, on-site training with manuals, and the provision of spare parts and special tools. This current process is for information gathering only and does not constitute a pre-qualification or shortlisting event. BC Hydro intends to issue a formal Request for Proposal in the second quarter of 2027, with a target contract award in the fourth quarter of 2027. Responses must be submitted electronically via BC Bid or to the designated contact, Man Kit Suen, by the deadline of November 17, 2026.
British Columbia Hydro and Power Authority

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details
NAICS: 335311
New
DIBBS
CABLE ASSEMBLY-SWITCH,
Solicitation # SPE4A6-27-T-5391
Solicitation SPE4A6-27-T-5391 is a request for quotations from the DLA Weapons Support ASC Commodities Division for the procurement of four electrical switch cable assemblies, identified by NSN 6150-01-733-1778. The items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with a required delivery date of August 18, 2027, and a need ship date of March 21, 2027. The contract specifies a delivery period of 144 days and requires FOB Origin terms. Compliance requirements are stringent, including mandatory adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, with a specific requirement for a cap or plug on one end of the assembly. Quality assurance must meet ISO 9001:2015 standards, and origin inspection is required. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access export-controlled data subject to ITAR or EAR regulations. The procurement incorporates various FAR and DFARS clauses, including those regarding the Buy American Act and the Berry Amendment. A price evaluation preference is available for certified HUBZone small businesses. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Quotations are due by October 27, 2026, and should be submitted via the DLA-BSM Internet Bid Board System.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 335311
New
DIBBS
WIRING HARNESS, BRANCHE
Solicitation # SPE4A6-27-T-5390
Solicitation SPE4A6-27-T-5390, issued by the DLA Weapons Support ASC Commodities Division, is for the procurement of three branched wiring harnesses (NSN 6150-01-676-3571). The items must be delivered with caps and plugs, coiled to 10 x 10, and shipped to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The delivery window is 160 days after the order, with a need ship date of April 6, 2027. Inspection and acceptance will occur at the point of origin. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality assurance requires sampling per MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Technical data is subject to ITAR and EAR export controls, and the contractor must comply with CMMC Level 2 and DFARS 252.204-7012 regarding the safeguarding of covered defense information. Invoicing must be processed electronically through the Wide Area WorkFlow system. Award evaluation is based on price, with a specific preference for certified HUBZone small businesses. Offers utilizing additive manufacturing are ineligible for award. The procurement also incorporates standard FAR and DFARS clauses regarding the Buy American Act, the Berry Amendment, and prohibitions on covered defense telecommunications equipment. Item Unique Identification is not required for this specific order.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 335311
New
DIBBS
TRANSFORMER, POWER
Solicitation # SPE7M1-27-T-1087
Solicitation SPE7M1-27-T-1087 is a request from the DLA Weapons Support Maritime Supply Chain for the procurement of eight power transformers (NSN 6120-01-595-7610). The items are identified as Commercial Off The Shelf (COTS) and must be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The required delivery date is September 20, 2025, with a need ship date of August 19, 2025. All quotes must be submitted via the DLA Internet Bid Board System (DIBBS), and the procurement may be subject to automated award. The contract mandates strict adherence to military standards for packaging, marking, and preservation, specifically MIL-STD-2073-1E, MIL-STD-129, and MIL-E-17555. Technical and quality requirements are governed by RA001 and the DLA Master List, while RQ011 requires the removal of government identification from non-accepted supplies. Inspection and acceptance will occur at the destination per FAR 52.246-2. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Compliance requirements include the Buy American and Balance of Payments Program (DFARS 252.225-7001) and the Berry Amendment. Offerors must provide representations regarding covered defense telecommunications equipment and safeguarding covered defense information per DFARS 252.204-7012. While the NAICS code is 335311, the solicitation utilizes a HUBZone price evaluation preference. Alternate offerors are required to submit a complete data package for any proposed alternate parts.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 21 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 336413
New
Federal
NIIN:LLW2AA020/P/N:279A146-1/NOM:ESM REC PROCESSOR
Solicitation # N0038327QF192
Solicitation N0038327QF192 is a sole source requirement issued by NAVSUP Weapon Systems Support Philadelphia for the repair of one ESM Receiver Processor, identified by NSN 9999LLW2AA020 and Part Number 279A146-1. The objective is to restore the government-owned article to operating condition, with the government intending to award the contract to Lockheed Martin due to a lack of sufficient data to contract with other sources. The initial induction period is 365 calendar days from the date of award, with a government option to extend for an additional 365 days. Contractors must provide pricing for the initial quantity and separate pricing for the second year if costs change. The period of performance is scheduled from October 16, 2026, to December 18, 2026, with a delivery schedule of 365 calendar days from the lead time event. The contract requires strict adherence to original manufacturer specifications and drawings for all inspection and testing. Packaging must meet best standard commercial practices for overseas shipment, specifically following MIL-STD-2073-1 for OCONUS shipments and ASTM D3951-18 for CONUS shipments, with specific requirements for electrostatic discharge protection and MIL-STD-129 marking. Inspection and acceptance will occur at the contractor's plant, coordinated through a Government Quality Assurance Representative. Offerors must be compliant with ISO 9001 quality standards and provide all necessary data from the NAVSUP WSS Source Approval Brochure to be considered for award. Payment and invoicing will be processed electronically via the Wide Area WorkFlow system.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details
NAICS: 336413
New
Federal
REGULATOR,AIR PRESS
Solicitation # N0038325QD135
This fixed-price solicitation from Navsup Weapon Systems Support is for the repair, overhaul, upgrade, and testing of Air Pressure Regulators (NSN 1660-01-039-7911) to return them to a Ready For Issue condition. The contractor is responsible for providing all labor, materials, and tooling, as the government will not provide manufacturing aids. Key performance requirements include a Repair Turnaround Time of 183 days after asset receipt and an induction expiration date 365 days after the contract award. The scope includes strict adherence to quality standards such as ISO 9001/SAE AS9100 and ANSI/NCSL Z540 for calibration, with a specific prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. The government intends to make a single award based on the most advantageous offer, weighing past performance as more important than price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risks. Packaging must comply with MIL-STD-2073 and MIL-STD-129, with specific requirements for DLR labeling and oxygen clean standards per MIL-STD-1330 where applicable. Administrative requirements include electronic invoicing via Wide Area Workflow and compliance with Buy American and Balance of Payments programs. Quotes must be submitted via email to the designated contracting officer by the specified deadline.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS