61--MOTOR,CONTROL, IN REPAIR/MODIFICATION OF

Awarded
N0038321QM316Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333618
New
DIBBS
ENGINE BLOCK ASSEMBLY,
Solicitation # SPE7L1-27-T-3005
Solicitation SPE7L1-27-T-3005 is a federal procurement issued by the DLA Weapons Support Land Supply Chain for four diesel engine block assemblies, specifically Cummins Inc. part numbers 3968733 or 396873300, under NSN 2815013308069. The requirement includes a special mandate for the removal of government identification from non-accepted supplies used in Cummins Diesel Engine Model C8.3. The original required delivery date is November 3, 2026, with a delivery window of five days after receipt of order. Shipping is designated as FOB Origin, with the final destination being the Saudi Arabian Army Ordnance Corps in Al Kharj, Saudi Arabia, via New York Forwarding Service Inc in Wilmington, North Carolina. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, including specific requirements for arrow-up labels and mechanical handling notices. Technical and quality standards are governed by the DLA Master List of Technical and Quality Requirements. Inspection and acceptance will occur at the point of origin per FAR 52.246-2. This procurement is a total small business set-aside under FAR 19.5 and requires all quotes to be submitted through the DLA Internet Bid Board System. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with various DFARS cybersecurity and safeguarding regulations.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

about 23 hours ago

DEADLINE

in 10 days
NAICS: 333618
New
DIBBS
NOZZLE, FUEL INJECTION
Solicitation # SPE7L5-27-T-0446
Solicitation SPE7L5-27-T-0446 is a request for quotations issued by the DLA Weapons Support Land Supplier Opns Engines for the procurement of 38 fuel injection nozzles, identified by NSN 2910-01-336-8213. This is a critical application, commercial item that is designated as a restricted source item, requiring engineering source approval from the Government design control activity. The solicitation is open for quotes until November 9, 2026, and must be submitted via the DLA Internet Bid Board System. The contract specifies a delivery timeline of 161 days after order, with an original required delivery date of January 25, 2027, and a need ship date of April 20, 2027. Delivery is FOB Origin to DLA Distribution Red River in Texarkana, Texas, with inspection and acceptance occurring at the destination. Packaging must adhere to ASTM D3951 and MIL-STD-129, though the DLA Master List of Technical and Quality Requirements takes precedence. Compliance requirements include the Buy American Act, DFARS cybersecurity standards for safeguarding covered defense information, and specific hazardous material labeling per 29 CFR 1910.1200. Payment and receiving reports are to be processed electronically through the Wide Area WorkFlow system. While the solicitation includes various small business representation templates, it is explicitly noted that this specific request is not a small business set-aside.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS ENGINES

POSTED

about 23 hours ago

DEADLINE

in 10 days
NAICS: 333618
New
DIBBS
ENGINE BLOCK ASSEMBLY,
Solicitation # SPE7L1-27-T-3003
Solicitation SPE7L1-27-T-3003 is a request for quotations from the DLA Weapons Support Land Supply Chain for the procurement of four diesel engine block assemblies, specifically for use in Cummins Diesel Engine Model C8.3, identified by NSN 2815013308069 and part numbers 3968733 or 396873300. This is a Foreign Military Sales requirement for the Saudi Arabian Army Ordnance Corps, with an original required delivery date of November 3, 2026. Delivery is established as FOB Origin, with shipments routed through New York Forwarding Service Inc in Wilmington, North Carolina, for final delivery to the Al Kharj Depot in Saudi Arabia. Inspection and acceptance will occur at the point of origin. The contract mandates strict adherence to DLA packaging and marking standards, including MIL-STD-129 and MIL-STD-2073-1E, and requires compliance with RP001 packaging requirements to ensure the product is securely immobilized for the end user. Technical and quality requirements are governed by the DLA Master List, including specific instruction RQ011 regarding the removal of government identification from non-accepted supplies. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with various FAR and DFARS clauses covering cybersecurity, NIST SP 800-171 assessment requirements, and domestic sourcing restrictions such as the Berry Amendment and Buy American Act. This procurement is not a small business set-aside.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

about 23 hours ago

DEADLINE

in 10 days
NAICS: 333618
New
DIBBS
PUMP, COOLING SYSTEM, EN
Solicitation # SPE7L5-27-T-0438
Solicitation SPE7L5-27-T-0438 is a small business set-aside request for the procurement of 16 engine cooling system pumps, identified by NSN 2930226281225. The requirement specifies compatible part numbers from Overaasen AS (19564), AB Volvo Penta (22195450), and Mono Marine B.V. (22902431). The contract is managed by the DLA Weapons Support Land Supplier Operations Engines, with a required delivery date of April 14, 2027, and a delivery window of 155 days after receipt of order. Shipping is designated as FOB Origin, with the final destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict quality and packaging standards, including MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and the DLA Master List of Technical and Quality Requirements (RA001). Inspection and acceptance will occur at the destination per FAR 52.246-2. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity reporting, the Buy American Act, and prohibitions on certain telecommunications equipment. Offers produced via additive manufacturing are ineligible for award, and the government may apply a HUBZone price evaluation preference.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS ENGINES

POSTED

about 23 hours ago

DEADLINE

in 10 days
NAICS: 333618
New
DIBBS
ENGINE BLOCK ASSEMBLY,
Solicitation # SPE7LX-27-U-0225
Solicitation SPE7LX-27-U-0225 is a total small business set-aside for the procurement of 26 diesel engine block assemblies (NSN 2815-01-532-3701) for the DLA Weapons Support Strategic Acq Program Directorate. The requirement is issued as a unilateral Simplified Indefinite-Delivery Contract with a maximum value of 350,000.00 dollars and a performance period of one year. Delivery is required within 99 days after receipt of order, with shipping terms set as FOB Origin and inspection and acceptance occurring at the destination. Technical compliance requires adherence to reference drawing NR 98752 000993-998 Revision B and quality systems complying with SAE AS9003 or ISO 9001. Strict packaging and marking standards are mandated per MIL-STD-2073-1E and MIL-STD-129, including individual packaging with moisture control and specific immobilization requirements. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access export-controlled data subject to ITAR or EAR. Additionally, contractors must comply with CMMC Level 2 requirements and various domestic sourcing restrictions, including the Buy American Act and the Berry Amendment. Payment shall be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT STRATEGIC ACQ PROGRAM DIRECTORATE

POSTED

about 23 hours ago

DEADLINE

in 4 days
NAICS: 333618
New
DIBBS
ENGINE BLOCK ASSEMBLY,
Solicitation # SPE7L1-27-T-3004
Solicitation SPE7L1-27-T-3004 is a request for quotations from the DLA Weapons Support Land Supply Chain for the procurement of four diesel engine block assemblies, specifically for use in Cummins Diesel Engine Model C8.3, identified by NSN 2815-01-330-8069 and part numbers 3968733 or 396873300. The contract is a fixed-price acquisition with delivery required within five days after receipt of order, with an original required delivery date of November 3, 2026. Terms are FOB Origin, with inspection and acceptance also occurring at the origin. The items are destined for the Ministry of Defense and Aviation, Saudi Arabian Army Ordnance Corps, via the New York Forwarding Service Inc in Wilmington, North Carolina. The contractor must adhere to strict packaging and marking standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, with specific requirements for palletization under RP001 and special marking code ZZ for mechanical handling. Technical and quality requirements are governed by the DLA Master List under RA001, and the contractor must comply with RQ011 regarding the removal of government identification from non-accepted supplies. Administrative requirements include electronic invoicing through the Wide Area WorkFlow system and compliance with the Buy American Act, the Berry Amendment, and DFARS cybersecurity and telecommunications restrictions. This procurement is not a small business set-aside.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

about 23 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

NAVSUP Weapon Systems Support Philadelphia is seeking a contractor to provide the labor, materials, and facilities necessary to repair or modify ten aircraft control motors, identified by NSN 7R-6105-016183368-FV and part number 40007249-005. Due to a lack of available technical data for the repair or manufacture of these items, the government intends to negotiate a sole-source contract with L3 Technologies Inc under FAR 6.302-1. The procurement will be handled as a commercial item under FAR Part 12, with delivery terms set as FOB Origin and categorized under NAICS code 333618. While the government intends to use a single source, other responsible parties may submit capability statements for consideration within 15 days of the notice. A critical requirement for any awarded contractor is Source Approval; those not already approved must submit a comprehensive request package as detailed in the NAVSUP-WSS Source Approval Information Brochure for Repair. The contracting process is managed by Anthony Boselli at the Philadelphia office.

General Info

Contract Value

$148,898.99

NAICS

333618 - Other Engine Equipment Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

N0038321QM316.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
Contacts

Full Description

Show more
CONTACT INFORMATION|4|N761.08|WTB|2156971360|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|"SEE SCHEDULE"|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|333618|1500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| THIS REQUEST FOR PROPOSAL/ QUOTE (RFP/Q) IS FOR THE REPAIR OF: NSN: 7RH 6105 016183368 FV PN: 40007249-005 QUANTITY: 10 EA PLEASE SUBMIT QUOTE VIA EMAIL TO contact@example.gov BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10. IF A FIRM FIXED PRICE (FFP) CANNOT BE DETERMINED, PLEASE INFORM THE PCO. THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES." OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: MOTOR,CONTROL ;6105 016183368; NSN , ;40007249-005; Part Number, Shall be performed IAW: MOTOR,CONTROL ;Repair/overhaul/inspect IAW the applicable repair manual, tech specifications, engineering orders and drawings.; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: MOTOR,CONTROL ;40007249-005; P/N, ;6105 016183368; NSN, ;Repair/overhaul/inspect IAW the applicable repair manual, tech specifications, engineering orders and drawings.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. MOTOR,CONTROL ;L3 Technologies INC; Company Name , ;640 N 2200 W Salt Lake City, UT 84116-3925; Address , ;06401; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 333998
New
Federal
70--INTERFACE UNIT,DATA, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QFC05
This sole source solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, requires the overhaul, upgrade, repair, testing, and inspection of 37 Interface Units, Data (NSN 016241529, Part Number 698258-7). The objective is to return these units to a Ready For Issue condition, with the work to be performed by Lockheed Martin in Marietta, Georgia. The government has designated this as a sole source requirement because it lacks the necessary technical data to contract with other sources. Award is contingent upon Government Source Approval, and any offeror not already approved must submit documentation per the NAVSUP WSS Source Approval Brochure. The contractor is responsible for providing all labor, materials, and tooling, with a strict prohibition on the use of MIL-W-81381 wire and unauthorized part cannibalization. Quality standards are rigorous, requiring compliance with ISO 9001, SAE AS9100, and specific calibration standards such as ANSI/NCSL Z540.3. The contract includes detailed protocols for handling items that are Beyond Economical Repair (BER) or Missing on Induction (MOI), requiring written concurrence from DCMA. Packaging and marking must adhere to MIL-STD-2073 and MIL-STD-130, respectively. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 4 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS