Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on November 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

63--CONTROL UNIT,ALARM, IN REPAIR/MODIFICATION OF

Closed
N0038325QC487Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335311
New
International
Design, Supply and Installation of the STATCOM
Solicitation # 25065
The British Columbia Hydro and Power Authority is conducting a Request for Information under solicitation number 25065 for the design, supply, and installation of a Static Synchronous Compensator (STATCOM) solution. This initiative is intended to support a major load project for a large industrial customer located within the North Thompson and Nicola regions of British Columbia. The project scope involves the design, factory simulation testing, supply, and installation of four STATCOMs at both new and existing substations. Technical requirements specify that equipment must be 24 MVAR or above with a base voltage of 138kV, and the STATCOM controller must be fully compatible with an existing 20-year-old ABB controller for a coordinated operation period of six to eight months. The procurement requires adherence to North American Standards, specifically IEEE C57.12.00 and CSA C88, with seismic qualification according to IEEE 693. Key deliverables include testing and commissioning, on-site training with manuals, and the provision of spare parts and special tools. This current process is for information gathering only and does not constitute a pre-qualification or shortlisting event. BC Hydro intends to issue a formal Request for Proposal in the second quarter of 2027, with a target contract award in the fourth quarter of 2027. Responses must be submitted electronically via BC Bid or to the designated contact, Man Kit Suen, by the deadline of November 17, 2026.
British Columbia Hydro and Power Authority

POSTED

about 23 hours ago

DEADLINE

in 28 days
NAICS: 335311
New
DIBBS
CABLE ASSEMBLY-SWITCH,
Solicitation # SPE4A6-27-T-5391
Solicitation SPE4A6-27-T-5391 is a request for quotations from the DLA Weapons Support ASC Commodities Division for the procurement of four electrical switch cable assemblies, identified by NSN 6150-01-733-1778. The items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with a required delivery date of August 18, 2027, and a need ship date of March 21, 2027. The contract specifies a delivery period of 144 days and requires FOB Origin terms. Compliance requirements are stringent, including mandatory adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, with a specific requirement for a cap or plug on one end of the assembly. Quality assurance must meet ISO 9001:2015 standards, and origin inspection is required. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access export-controlled data subject to ITAR or EAR regulations. The procurement incorporates various FAR and DFARS clauses, including those regarding the Buy American Act and the Berry Amendment. A price evaluation preference is available for certified HUBZone small businesses. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Quotations are due by October 27, 2026, and should be submitted via the DLA-BSM Internet Bid Board System.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 24 hours ago

DEADLINE

in 7 days
NAICS: 335311
New
DIBBS
WIRING HARNESS, BRANCHE
Solicitation # SPE4A6-27-T-5390
Solicitation SPE4A6-27-T-5390, issued by the DLA Weapons Support ASC Commodities Division, is for the procurement of three branched wiring harnesses (NSN 6150-01-676-3571). The items must be delivered with caps and plugs, coiled to 10 x 10, and shipped to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The delivery window is 160 days after the order, with a need ship date of April 6, 2027. Inspection and acceptance will occur at the point of origin. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality assurance requires sampling per MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Technical data is subject to ITAR and EAR export controls, and the contractor must comply with CMMC Level 2 and DFARS 252.204-7012 regarding the safeguarding of covered defense information. Invoicing must be processed electronically through the Wide Area WorkFlow system. Award evaluation is based on price, with a specific preference for certified HUBZone small businesses. Offers utilizing additive manufacturing are ineligible for award. The procurement also incorporates standard FAR and DFARS clauses regarding the Buy American Act, the Berry Amendment, and prohibitions on covered defense telecommunications equipment. Item Unique Identification is not required for this specific order.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 24 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract involves the repair, overhaul, and testing of a Control Unit, Alarm, with the NSN 6350-01-489-1481, under the solicitation number N0038325QC487 issued by the Naval Supply Systems Command Weapon Systems Support. The work is designated as a sole-source requirement, emphasizing that the government does not possess sufficient data to contract with any other source without prior government approval. The contractor, located in Mississauga, Canada, must follow strict quality and configuration management procedures, including compliance with MIL-STD-130 for markings, and ensure all repairs meet the specified technical manuals and drawings, notably NAWC Lakehurst drawing number 80020 REV AB. The scope covers repair, testing, and inspection to return the unit to a serviceable condition, with particular attention to critical materials used in shipboard systems, where failure could result in personnel injury or system loss. The contract mandates the contractor to establish a comprehensive quality management system aligned with ISO 9001 or SAE AS9100 standards, maintain calibration and configuration control, and ensure proper storage and traceability of parts. All parts and materials must be new unless approved otherwise, and any modifications to repair procedures or drawings require prior government approval. The contractor is responsible for developing detailed repair procedures, conducting thorough inspections—including 100% inspection of critical features—and ensuring non-destructive testing is performed by NADCAP-accredited laboratories. Additionally, the contractor must develop and implement a traceability system for parts, maintain proper storage conditions, and submit repair procedures for government review before commencing work. The contract emphasizes strict adherence to quality assurance protocols, including sampling inspections based on ANSI Z1.4 standards, and mandates that all work be performed at the specified contractor location, with no government-furnished tooling or equipment provided unless explicitly authorized.

General Info

Supply/repair of two flight-critical Control Unit Alarms, awarded to pre-approved source only.

NAICS

335311 - Power, Distribution, and Specialty Transformer Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N792.08|T2N|808-603-7406|Alexis.k.healy.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (combo) Type||Cognizant DFAS|N00383|Cognizant DCMA|Cognizant DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335311|800||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| 1. The purpose of this modification is to state NAVAIR's concurrence to move forward with the ECA repairs using INDAL's drawing package. 2. All other terms and conditions remain the same. NIIN 012458061 part number 212602-2 maybe be upgraded to NIIN 014891481 part number 212602-3 please give straight pricingfor the overhaul 012458061 to upgrade 014891481. The quanity has increased from 2 to 6. No other terms have changed. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be ?issued? by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government?s acceptance of the contractor?s proposal constitutes bilateral agreement to ?issue? contractual documents as detailed herein. This solicitation is for repair. This is a sole source requirement. The Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source. These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at https://public.navsup.navy.mil/public/ops$public.business_vendor_form_new Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation. For information or questions regarding this notice, please contact Alexis Healy at the email address: alexis.k.healy.civ@us.navy.mil. NAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.3 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.3.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CONTROL UNIT,ALARM ;6350-01-489-1481; NSN , ;212602-3; Part Number, Shall be performed IAW: CONTROL UNIT,ALARM ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. REV AB.; Publication (s). 1.3.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST DRAWING; drawing number ( ;(80020); ) ;212602-3; , Revision ;REV AB; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=212602 |80020|AB| |D| | | | DRAWING DATA=212604 |80020| V| |D| | | | DRAWING DATA=212605 |80020|AE| |D| | | | DRAWING DATA=212606 |80020|AD| |D| | | | DRAWING DATA=212608 |80020| C| |D| | | | DRAWING DATA=212609 |80020| B| |D| | | | DRAWING DATA=212613 |80020| C| |D| | | | DRAWING DATA=212620 |80020| B| |D| | | | DRAWING DATA=212647 |80020| C| |D| | | | DRAWING DATA=212649 |80020| H| |D| | | | DRAWING DATA=212651 |80020| G| |D| | | | DRAWING DATA=212652 |80020| G| |D| | | | DRAWING DATA=212654 |80020| J| |D| | | | DRAWING DATA=212655 |80020| K| |D| | | | DRAWING DATA=212666 |80020| J| |D| | | | DRAWING DATA=212667 |80020| E| |D| | | | DRAWING DATA=212668 |80020|AG| |D| | | | DRAWING DATA=212669 |80020| D| |D| | | | DRAWING DATA=212670 |80020| E| |D| | | | DRAWING DATA=212671 |80020| E| |D| | | | DRAWING DATA=212672 |80020| L| |D| | | | DRAWING DATA=212673 |80020| L| |D| | | | DRAWING DATA=212674 |80020| G| |D| | | | DRAWING DATA=212675 |80020| G| |D| | | | DRAWING DATA=212676 |80020| U| |D| | | | DRAWING DATA=212677 |80020| C| |D| | | | DRAWING DATA=212678 |80020| D| |D| | | | DRAWING DATA=212679 |80020| C| |D| | | | DRAWING DATA=212680 |80020| E| |D| | | | DRAWING DATA=212682 |80020| W| |D| | | | DRAWING DATA=212683 |80020| L| |D| | | | DRAWING DATA=212686 |80020| G| |D| | | | DRAWING DATA=212705 |80020| E| |D| | | | DRAWING DATA=212706 |80020| K| |D| | | | DRAWING DATA=212707 |80020| J| |D| | | | DRAWING DATA=212707 W/L |80020| P| |D| | | | DRAWING DATA=212708 |80020| L| |D| | | | DRAWING DATA=212709 |80020| D| |D| | | | DRAWING DATA=212710 |80020| G| |D| | | | DRAWING DATA=212725 |80020| H| |D| | | | DRAWING DATA=212726 |80020| J| |D| | | | DRAWING DATA=212726 W/L |80020| E| |D| | | | DRAWING DATA=212733 |80020| F| |D| | | | DRAWING DATA=212734 |80020| P| |D| | | | DRAWING DATA=212735 |80020| G| |C| | | | DRAWING DATA=212737 |80020| G| |D| | | | DRAWING DATA=212738 |80020| D| |D| | | | DRAWING DATA=212740 |80020| E| |D| | | | DRAWING DATA=212741 |80020| D| |D| | | | DRAWING DATA=212742 |80020| E| |D| | | | DRAWING DATA=212748 |80020| B| |D| | | | DRAWING DATA=212749 |80020| C| |D| | | | DRAWING DATA=212750 |80020| G| |D| | | | DRAWING DATA=212753 |80020| C| |D| | | | DRAWING DATA=212762 |80020| C| |D| | | | DRAWING DATA=212763 |80020| C| |D| | | | DRAWING DATA=212764 |80020| F| |D| | | | DRAWING DATA=212768 |80020|AA| |D| | | | DRAWING DATA=212775 |80020| Y| |D| | | | DRAWING DATA=212775 W/L |80020| M| |D| | | | DRAWING DATA=212776 |80020| D| |D| | | | DRAWING DATA=212777 |80020| E| |D| | | | DRAWING DATA=212778 |80020| D| |D| | | | DRAWING DATA=212779 |80020| D| |D| | | | DRAWING DATA=212780 |80020| G| |D| | | | DRAWING DATA=212781 |80020| F| |D| | | | DRAWING DATA=212782 |80020| G| |D| | | | DRAWING DATA=212785 |80020| B| |D| | | | DRAWING DATA=212791 |80020| F| |D| | | | DRAWING DATA=212793 |80020| L| |D| | | | DRAWING DATA=212793 W/L |80020| M| |D| | | | DRAWING DATA=212794 |80020| M| |D| | | | DRAWING DATA=212794 W/L |80020| V| |D| | | | DRAWING DATA=212795 |80020| J| |D| | | | DRAWING DATA=212795 W/L |80020| L| |D| | | | DRAWING DATA=212796 |80020| P| |D| | | | DRAWING DATA=212796 W/L |80020| V| |D| | | | DRAWING DATA=212797 |80020| C| |D| | | | DRAWING DATA=212801 |80020| M| |D| | | | DRAWING DATA=212804 |80020| F| |D| | | | DRAWING DATA=212806 |80020| G| |D| | | | DRAWING DATA=212810 |80020| C| |D| | | | DRAWING DATA=212812 |80020| J| |A| | | | DRAWING DATA=212813 |80020| B| |D| | | | DRAWING DATA=212816 |80020| D| |D| | | | DRAWING DATA=212819 |80020| R| |D| | | | DRAWING DATA=212820 |80020| C| |D| | | | DRAWING DATA=212827 |80020| D| |D| | | | DRAWING DATA=212828 |80020| C| |D| | | | DRAWING DATA=212829 |80020| C| |D| | | | DRAWING DATA=212831 |80020| F| |D| | | | DRAWING DATA=212832 |80020| F| |D| | | | DRAWING DATA=212833 |80020| F| |D| | | | DRAWING DATA=212836 |80020| B| |D| | | | DRAWING DATA=212837 |80020| E| |D| | | | DRAWING DATA=212838 |80020| B| |D| | | | DRAWING DATA=212839 |80020| E| |D| | | | DRAWING DATA=212840 |80020| D| |D| | | | DRAWING DATA=212841 |80020| C| |D| | | | DRAWING DATA=212842 |80020| E| |D| | | | DRAWING DATA=212855 |80020| H| |D| | | | DRAWING DATA=212856 |80020| K| |D| | | | DRAWING DATA=212857 |80020| B| |D| | | | DRAWING DATA=212858 |80020| B| |D| | | | DRAWING DATA=212859 |80020| B| |D| | | | DRAWING DATA=212903 |80020| F| |D| | | | DRAWING DATA=212904 |80020| K| |D| | | | DRAWING DATA=212905 |80020| E| |D| | | | DRAWING DATA=212906 |80020| H| |D| | | | DRAWING DATA=212907 |80020| N| |D| | | | DRAWING DATA=212910 |80020| B| |D| | | | DRAWING DATA=212913 |80020| F| |D| | | | DRAWING DATA=212915 |80020| H| |D| | | | DRAWING DATA=212916 |80020| L| |D| | | | DRAWING DATA=212918 |80020| J| |D| | | | DRAWING DATA=212919 |80020| L| |D| | | | DRAWING DATA=212921 |80020| B| |D| | | | DRAWING DATA=212922 |80020| D| |D| | | | DRAWING DATA=212923 |80020| B| |D| | | | DRAWING DATA=212925 |80020| D| |D| | | | DRAWING DATA=212926 |80020| E| |D| | | | DRAWING DATA=212927 |80020| C| |D| | | | DRAWING DATA=212928 |80020| D| |D| | | | DRAWING DATA=212929 |80020| H| |D| | | | DRAWING DATA=212965 |80020| C| |D| | | | DRAWING DATA=212966 |80020| C| |D| | | | DRAWING DATA=212967 |80020| F| |D| | | | DRAWING DATA=212969 |80020| E| |D| | | | DRAWING DATA=212974 |80020| E| |D| | | | DRAWING DATA=212976 |80020| B| |D| | | | DRAWING DATA=212977 |80020| D| |D| | | | DRAWING DATA=212978 |80020| E| |D| | | | DRAWING DATA=212979 |80020| C| |D| | | | DRAWING DATA=212980 |80020| G| |D| | | | DRAWING DATA=212981 |80020| E| |D| | | | DRAWING DATA=212982 |80020| G| |D| | | | DRAWING DATA=212985 |80020| D| |D| | | | DRAWING DATA=212986 |80020| D| |D| | | | DRAWING DATA=212987 |80020| C| |D| | | | DRAWING DATA=212988 |80020| D| |D| | | | DRAWING DATA=212989 |80020| B| |D| | | | DRAWING DATA=212990 |80020| B| |D| | | | DRAWING DATA=212991 |80020| C| |D| | | | DRAWING DATA=212992 |80020| B| |D| | | | DRAWING DATA=212995 |80020| B| |D| | | | DRAWING DATA=212996 |80020| B| |D| | | | DRAWING DATA=212998 |80020| J| |D| | | | DRAWING DATA=212999 |80020| E| |D| | | | DRAWING DATA=213002 |80020| B| |D| | | | DRAWING DATA=213089 |80020| C| |D| | | | DRAWING DATA=213091 |80020| B| |D| | | | DRAWING DATA=213116 |80020| B| |D| | | | DRAWING DATA=213117 |80020| B| |D| | | | DRAWING DATA=213118 |80020| C| |D| | | | DRAWING DATA=213119 |80020| B| |D| | | | DRAWING DATA=213659 |80020| -| |D| | | | DRAWING DATA=213660 |80020| -| |D| | | | DRAWING DATA=213712 |80020| -| |D| | | | DRAWING DATA=213713 |80020| A| |D| | | | DRAWING DATA=213714 |80020| -| |D| | | | DRAWING DATA=213715 |80020| -| |D| | | | DRAWING DATA=213716 |80020| -| |D| | | | DRAWING DATA=213717 |80020| B| |D| | | | DRAWING DATA=423595 |80020| E| |A| | | | DRAWING DATA=521736 |80020| C| |A| | | | DRAWING DATA=523985 |80020| B| |D| | | | DRAWING DATA=523986 |80020| -| |D| | | | DRAWING DATA=523987 |80020| -| |D| | | | DRAWING DATA=523988 |80020| -| |D| | | | DRAWING DATA=523989 |80020| -| |D| | | | DRAWING DATA=523990 |80020| -| |D| | | | DRAWING DATA=523991 |80020| -| |D| | | | DRAWING DATA=6300-001 |80020| G| |D| | | | 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CONTROL UNIT,ALARM ;212602-3; P/N, ;6350-01-489-1481; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. REV AB; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. CONTROL UNIT,ALARM ;INDAL TECHNOL0GIES INC.; Company Name , ;MISSISSAUGA, ON L5C 2V8 CANADA; Address , ;36334; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE Unique Requirements: The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/Repair Procedure CDRL provided in this document. NAWCADLKE engineering POC is jeffrey.hicks6.civ@us.navy.mil. QUALITY ASSURANCE REQUIREMENTS: 1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4. d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 2. First Article Testing: N/A 3. Production Lot Special Tests: N/A 4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834 E-mail: jose.g.torraca.civ@us.navy.mil; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.3 SPECIAL INSPECTION REQUIREMENTS ( ; ; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ; ; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.4 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-2834 E-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (24-10065) REPAIR TDR (24-10110) THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED REQUEST FOR SOURCE APPROVAL & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION.ANY COMPANY NOT PREVIOUSLY APPROVED, MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. ALL RECORDS PERTAINING TO ALRE CAI MANUFACTURE AND INSPECTION/TEST SHALL BE PROVIDED TO THE ALRE COGNIZANT TECHNICAL AUTHORITY. ALL RECORDS SHALL BE MAINTAINED BY LKE QA AND BY THE MANUFACTURER FOR A PERIOD OF SEVEN YEARS. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 3) SUBTITLE: Inspection Hold Points for Quality Assurance. (BLOCK 12) DATE OF FIRST SUBMISSION: Prior to commencing overhaul. If the extent of the repair effort for this assembly is beyond the scope of the existing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for disassembly and reassembly. NAWCADLKE engineeringPOC is jeffrey.hicks6.civ@us.navy.mil. The overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance "hold points" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at final assembly are accessible for proper interim inspection.

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS