Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

66--BPA - YSI EXO and Pro-Digital Water Quality Monitoring Equipment, Parts, and Repair Services

Awarded
140R2026Q0084Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bureau of Reclamation’s Mid-Pacific Region issued a sole-source Blanket Purchase Agreement (BPA) to YSI, Inc. (Xylem Analytics) for the procurement of YSI EXO and ProDSS water quality monitoring equipment, original equipment manufacturer replacement parts, repair and maintenance services, and related accessories to support water quality monitoring activities across the California-Great Basin Region. The BPA, valid for five years from August 1, 2026, through July 31, 2031, was awarded on a non-competitive basis because YSI, Inc. is the sole original equipment manufacturer and authorized provider of compatible instrumentation, parts, and factory-authorized support services necessary to maintain operational continuity with the agency’s existing monitoring systems. Market research confirmed no other sources could satisfy the strict compatibility and technical requirements. The contract is structured as a firm-fixed price BPA with unit pricing specified across five years for items including EXO1 and EXO1S sondes, ProDSS KorLink Bluetooth adaptors, ODO/T probe assemblies, calibration solutions, sensors, cables, and repair services. All work must conform to good commercial practices, and repair estimates require government approval before service initiation. The contractor must be registered in SAM.gov with completed representations and certifications, submit quotes electronically in PDF format to the designated point of contact, and provide a capability statement and manufacturer authorization to demonstrate compatibility with existing YSI systems. The source selection process follows a Lowest Price Technically Acceptable (LPTA) methodology, with technical acceptability determined by documented proof of OEM status, compatibility, and authorization—failure to meet these pass/fail criteria results in rejection. Invoicing must be processed electronically through the U.S. Treasury’s Invoice Processing Platform (IPP), with contractor enrollment coordinated via SAM-registered points of contact. Performance will be monitored by a designated Contracting Officer’s Representative using criteria of quality, timeliness, and compliance, with assessments recorded in CPARS. The contract incorporates numerous FAR clauses including those covering payment methods, government property, protests, bankruptcy, stop-work orders, and prohibitions on contracting with inverted domestic corporations, in inverted entities, or entities requiring confidentiality agreements that restrict whistleblower disclosures. Additional compliance obligations include strict prohibitions on the use of covered telecommunications equipment, Kaspersky Lab products, and restricted parties under OFAC regulations, all subject to timely disclosure if non-compliant. All proprietary information in submissions must be clearly marked per Freedom of Information Act exemption guidelines.

General Info

Seeking qualified suppliers for Xylem YSI water quality sondes, parts, and certified maintenance services.

Agency

Department Of The Interior → Mp-Regional OfficeView Agency

Contract Value

$0

NAICS

334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process VariablesView NAICS

Place of Performance

CA

Set-Aside

NONE

Awardee

Award Issued Date

Documents

(3)

Solicitation 140R2026Q0084 for YSI Water Quality Sondes BPA

PDFrfq

140R2026Q0084 - Justification for Other Than Full and Open Competition

PDFjustification-and-authorization

Attachment 1 - Price Schedule for EXO Series Sensors

XLSXprice-schedule

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mp-Regional Office
Contacts1 person available
OfficeSACRAMENTO, CA, 95825, USA
Organization / Agency
Department Of The Interior → Mp-Regional Office
View Agency Profile
Office AddressSACRAMENTO, CA, 95825, USA

Full Description

Show more
The purpose of this requirement is to establish a Blanket Purchase Agreement (BPA) for YSI EXO and YSI Pro-Digital equipment, replacement parts, and repair services to support ongoing water quality monitoring activities throughout the Bureau of Reclamation's California-Great Basin Region.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Interior → Mp-Regional Office

Same awarding agency

NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 4 days
View Details
NAICS: 237990
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build construction contract issued by the U.S. Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Sacramento County, California. The project is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under FAR 19.14, with an estimated value between 1 million and 5 million dollars. The scope of work encompasses the removal and disposal of the existing crane, including the handling of asbestos and other hazardous materials, the design and installation of a new 30-ton bridge crane, power supply installation, rail system survey and optional repairs, and final commissioning, load testing, and operator training. The contractor must begin performance within 7 calendar days of the notice to proceed and complete all work, including final cleanup, within 600 calendar days. The procurement process utilizes FAR Part 15 negotiation procedures, with award based on the most advantageous proposal to the government. Evaluation is weighted heavily toward non-price factors, specifically the technical approach, past performance within the last six years, and the qualifications of key personnel, including a qualified crane inspector. Proposals must be submitted in three distinct volumes: Business, Technical, and Pricing. The contract includes strict quality assurance requirements, including Factory Acceptance Testing (FAT) for PLCs and VFDs and adherence to various NEMA, IEEE, and UL standards. Performance is subject to liquidated damages of 2,900 dollars per calendar day of delay, and the contractor is required to provide performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS