Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

66--DETECTOR,WIND SPEED

Closed
N0038323QC486Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
Federal
Automated Traffic Enforcement Trailer
Solicitation # W911S226U4411
Solicitation W911S226U4411 is a Total Small Business Set-Aside for the procurement of a complete, towable, autonomous mobile traffic enforcement trailer and laser-based measuring system for the Department of Defense at Fort McCoy, Wisconsin. The primary requirement is for one Automated Traffic Monitoring System Trailer, specifically the POLISCAN Speed FM1 or an approved equal, capable of tracking multiple vehicles across at least four adjacent traffic lanes to enforce speed limits and red-light violations. The contract includes a requirement for eight hours of on-site operator training at Fort McCoy and a minimum 12-month comprehensive manufacturer's warranty. All equipment must be new, and the system must be calibrated to federal and state standards to ensure data is legally admissible in court. The award will be granted to the responsible offeror whose proposal is most advantageous to the government based on price and technical evaluations. Delivery is required F.O.B. Destination to Fort McCoy, with a preferred delivery window of 30 days. Offerors must submit their proposals via the PIEE Solicitation module, including technical, price, and past performance documentation. A critical requirement for responsiveness is the completion of Attachment 1 regarding certifications and the identification of the country of origin. The contract incorporates various regulatory clauses, including Buy American preferences, cybersecurity reporting under DFARS 252.204-7012, and prohibitions on certain telecommunications equipment.
W6QM Micc-Ft Drum

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 334511
New
Federal
66--INDICATOR,ATTITUDE, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QBB18
This solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, is a Request for Quotations for the repair, overhaul, upgrade, and inspection of 33 Attitude Indicators (NSN 6610-01-101-1927 LC, P/N 622-3374-002). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in operational environments. The contract includes an initial induction period of 365 calendar days, which the government may extend by an additional year. Offerors must provide option pricing for a maximum of 135 units over the total contract period. Award will be granted to the offeror with the lowest price technically acceptable quote, with past performance evaluated via the DoD Supplier Performance Risk System. The contractor is responsible for providing all labor, facilities, materials, and tooling, as government-furnished manufacturing aids are not provided. Key technical requirements include compliance with ISO 9001 or SAE AS9100 quality systems and calibration standards such as ANSI/NCSL Z540.3 or ISO-10012-1. Specific prohibitions are in place regarding the use of MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead. The contract establishes strict protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are FOB Destination with a 90-day delivery window, and all packaging must adhere to MIL-STD-2073 and MIL-STD-129 standards. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Navsup Weapon Systems Support

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 334511
New
Federal
58--THERMAL IMAGING SYS
Solicitation # N0010426RQA81
Solicitation N00104-26-R-QA81, issued by NAVSUP Weapon Systems Support Mechanicsburg, is a firm fixed price negotiated procurement for the manufacture of Thermal Imaging Systems under NSN 5855-01-499-1240. The government is seeking a single award based on the most advantageous offer, with past performance weighted as more important than price. The evaluation process utilizes the DoD Supplier Performance Risk System for quality ratings, and the government reserves the right to award to other than the lowest priced offer. Proposals must be submitted via NECO or email, and the current requested delivery date is 180 days after award. The contract mandates strict adherence to quality and technical standards, including physical identification per MIL-STD-130 and preservation and packaging according to MIL-STD-2073. Inspection and acceptance are conducted at the origin, with the contractor remaining responsible for all inspection requirements and maintaining records for 365 days post-delivery. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment, compliance with Buy American and Balance of Payments program certificates, and adherence to cybersecurity standards for covered defense information. Offerors must be authorized distributors of the original manufacturer to be considered for award.
Navsup Weapon Systems Support Mech

POSTED

about 5 hours ago

DEADLINE

in 3 months

General Info

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

3

N0038323QC4860001.pdf

PDF

N0038323QC4860002.pdf

PDF

N0038323QC486.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N792.10|T2Q|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING (COMBO) TYPE|N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 Months|60 Days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (JAN 23)|3|||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|334511|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A1A| This solicitation is for made new manufacture spare parts. NAVSUP WSS Requests proposals submitted in response to this solicitation remainvalid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered tobe "issued" by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce methods, such asemail. The Governments acceptance of the contractors proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.4 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.5 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.6 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;623943; drawing number ( ;80020; ) ;H; , Revision ;APPLIES; and all details and specifications referenced therein. 1.7 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.8 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS DRAWING DATA=523109 |80020| -| |C| | | | DRAWING DATA=623943 |80020| H| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;CLOSE MACHINE TOLERANCES; 4.2.2 Requirements of: ;LKE DRAWING PACKAGE; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;80020; ) ;H ; , Revision ;80020; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;ROY JANNEY QA REP AT FAX +1 (555) 000-0000; 4.6 Disposition of FAT samples 4.6.1 ;N/A; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;623943-1; ; , Revision ;H; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;IF APPLICABLE, ALL ACTUAL DIMENSIONS OF ANY MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 SPECIAL INSPECTION REQUIREMENTS ( ;N/A; ) MAGNETIC PARTICLE INSPECTION ( ;N/A; ) SURFACE INSPECTION ( ;N/A; ) PENETRANT INSPECTION ( ;N/A; ) RADIOGRAPHIC INSPECTION ( ;N/A; ) ULTRSONIC INSPECTION ( ;N/A; ) HIGH SHOCK TEST ( ;N/A; ) MECHANICAL VIBRATION TEST 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE FLIGHT CRITICAL ACTION ITEM. DISREGARD QUALITY ASSURANCE ON DRAWING, REFER TO CONTRACT. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWINGUPDATE SHEET. NAVSUP REFERENCE ONLY: (22-10089): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED REQUEST FOR SOURCE APPROVAL AND BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Equipment IAW MIL-W-22900 per note 1 of drawing 623943 c. Assembly per drawing 623943 d. Wiring per drawing 623943 e. Soldering per drawing 623943 f. Material and mill certifications per drawing 623943 g. Dimensions per drawing 623943 DATE OF FIRST SUBMISSION=ASREQ Data Requirements a. Copies of all approved requests for variations. b. Equipment IAW MIL-W-22900 per note 1 of drawing 623943 c. Assembly per drawing 623943 d. Wiring per drawing 623943 e. Soldering per drawing 623943 f. Material and mill certifications per drawing 623943 g. Dimensions per drawing 623943

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation NO0383-26-Q-AA77, issued by NAVSUP Weapon Systems Support, seeks a contractor to provide repair, overhaul, and modification services for electrical control panels (NSN 6110-01-433-5020). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return units to a Ready For Issue condition. Key technical requirements include adherence to MIL-STD-130 for markings, the prohibited use of MIL-W-81381 wire in favor of SAE-AS22759, and compliance with ISO 9001/SAE AS9100 quality standards. The scope includes strict protocols for handling items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and the Procuring Contracting Officer. The government intends to make a single award based on a trade-off between price and past performance, with past performance weighted as the more important factor. Deliveries are expected within 90 days, with Repair Turnaround Time measured from asset return to acceptance at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific requirements for electrostatic protection and Depot Level Repairable labeling. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. The resulting contract will be a DO rated order certified for national defense.
Motor and Generator Manufacturing

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
CABLE ASSEMBLY,ROTA
Solicitation # N0038327QAA18
This fixed-price solicitation, issued by Navsup Weapon Systems Support Philadelphia, is for the overhaul, upgrade, repair, testing, and inspection of the Cable Assembly, ROTA (NSN 1680-01-661-7957, Part Number 5217008-110). The primary objective is to return these assets to a Ready For Issue (RFI) condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, with a specific prohibition against using MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. The contract includes a one-year induction period from the date of award, after which any assets received require bilateral agreement for repair. Performance is governed by strict quality and timing requirements, including a defined Repair Turnaround Time (RTAT) and throughput constraints. The contractor must maintain a quality system conforming to ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and the adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. Award evaluation will prioritize past performance as the primary factor, followed by price as the secondary factor, with the government utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336412
New
Federal
GUARD,GASOLINE ENGI
Solicitation # N0038327QTA11
Solicitation N0038327QTA11, issued on October 8, 2026, by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of a Gasoline Engine Guard, identified by NSN 2810-01-737-5535. The government intends to make a single award to a responsible offeror based on a best-value determination where past performance is considered more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System to assign color ratings, while price serves as a secondary factor. Quotations are due by November 9, 2026, and the required delivery period is 90 days FOB Destination to the DLA Distribution New Cumberland facility in Pennsylvania. The contract mandates strict adherence to military standards for packaging and marking, specifically MIL-STD-2073-1 and MIL-STD-129, with specific requirements for domestic and overseas shipments. Contractors must comply with cybersecurity standards outlined in NIST SP 800-171 and DFARS 252.204-7012. Quality management compliance with ISO 9001 or SAE AS9100 is required, and inspection and acceptance will occur at the origin. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment, and compliance with the Buy American and Balance of Payments Program. Offerors must also provide hazardous material certifications and safety data sheets if applicable.
Aircraft Engine and Engine Parts Manufacturing

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS