660 University Avenue Mixed-Use Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The 660 University Avenue Mixed-Use Project in Palo Alto, California involves the consolidation of three parcels, demolition of two existing office buildings and a surface parking lot, and the construction of a six-story building with two levels of below-grade parking. The development will include 70 residential units and 1,984 square feet of office space, with the first floor designated for office use, a lobby, and a fitness center, while the five upper floors will house the residential units. The project is subject to environmental compliance under the California Environmental Quality Act (CEQA), with mitigation measures requiring vibration control to limit peak particle velocity to 0.2 inches per second, use of Tier 4 Final EPA-compliant construction equipment, installation of noise barriers with a minimum STC 32 rating, and preservation of trees through an approved arborist plan. Paleontological and archaeological monitoring must be conducted by qualified professionals during ground-disturbing activities, with protocols established for handling discoveries and ensuring resource preservation. All construction activities must adhere to city-mandated conditions including restrictions on equipment idling, noise complaint documentation, and seasonal limitations on work near bird nesting areas. Project oversight and compliance verification are managed by the City of Palo Alto Planning and Development Services Department, with Emily Kallas, Senior Planner, serving as the primary point of contact. The developer is responsible for implementing approved mitigation measures, submitting final reports—including a Paleontological Mitigation Report and Tree Protection Plan—and ensuring all inspections are conducted on-site during active phases. Acceptance of deliverables occurs at the city’s administrative office at 285 Hamilton Avenue, where compliance documentation is formally reviewed and approved. Although no federal contract clauses, funding identifiers, invoicing systems, or pricing details are present, the project operates under local regulatory frameworks with specific technical standards tied to environmental protection, construction practices, and cultural resource management. No federal procurement mechanisms such as FAR clauses, UEI or CAGE codes, socioeconomic certifications, or evaluation factors for award have been identified, confirming this is a locally governed land development project with no federal contracting structure. The performance location is clearly defined at 660 University Avenue, with parcel numbers 120-03-042, 120-03-043, and 120-03-044, and the approval timeline indicates commencement is expected in late 2025 or early 2026 following formal environmental determinations.
General Info
Agency
NAICS
Place of Performance
University Avenue, Byron Street, and Middlefield Road, Palo Alto, CA, 94301Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code