Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

70--COMPUTER,DIGITAL, IN REPAIR/MODIFICATION OF

Active
N0038326RLA89Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, issued by the Navy Supply Systems Command Weapon Systems Support (NAVSUP WSS), is a sole-source requirement for the repair and modification of digital computer systems under contract number N0038326RLA89. The contract mandates that all repairs be performed to Return for Issue (RFI) standards using approved manuals and drawings, with strict prohibitions against the use of MIL-W-81381 wire, which must be replaced with SAE-AS22759 series wire. Contractors are responsible for providing all tooling, test equipment, and facilities necessary to complete repairs, as no Government-furnished property will be provided unless explicitly stated. The scope includes overhaul, repair, and potential upgrades of the specified digital computer unit, with detailed procedures governing configuration management, quality assurance, and parts control based on ISO 9001/SAE AS9100 standards. Contractors must adhere to stringent requirements concerning source approval, as only pre-authorized vendors may bid, and submissions lacking the required NAVSUP WSS Source Approval Brochure documentation will be disqualified. All repairs must occur at the designated facility in Saint Louis, Missouri, with any changes to repair processes, facilities, or sourcing requiring written approval from the Procuring Contracting Officer. The contract enforces strict controls over Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) determinations, all of which require formal DCMA concurrence and Government instruction before proceeding. Purchased materials must be new unless otherwise approved, cannibalization is prohibited without explicit authorization, and all inspection records must be maintained for government audit. Proposals are valid for 120 days, and submissions must be made by August 17, 2026, with all contractual documents deemed issued upon electronic transmission by the Government.

General Info

Sole source acquisition of 75 flight-critical computer parts for urgent Fleet needs, FOB origin, approved sources only.

Agency

Department Of Defense → Navsup Weapon Systems SupportView Agency

NAICS

334111 - Electronic Computer ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|0PXV4||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS PHILADELPHIA| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| This solicitation is for repair. This is a sole source requirement. The Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source(s). These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at h https://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation. For information or questions regarding this notice, please contact Kristin Clemens at the email address: kristin.clemens2.civ@us.navy.mil. NAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: COMPUTER,DIGITAL ;13250434-21; P/N, ;7021 016552573; NSN, ;OEM Technical Drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. COMPUTER,DIGITAL ;The Boeing Company; Company Name , ;Defense, Space & Security Division 6200 J S McDonnell Blvd. Saint Louis, MO 63134-1939; Address , ;0PXV4; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

Same NAICS industry code

NAICS: 334111
New
Federal
Enterprise GPU Servers for Artificial Intelligence – Multiple-Award IDIQThe Federal Bureau of Investigation is soliciting proposals for enterprise artificial intelligence hardware infrastructure under RFP No. 15F06726R0000307, seeking commercially available solutions including enterprise AI compute servers, rack-scale and pod-scale AI systems, inference servers, high-speed networking components, associated software licenses, and OEM warranty and technical support. The government intends to award two to four firm-fixed-price, indefinite-delivery/indefinite-quantity contracts, with the flexibility to make fewer or more awards, including a single contract, based on best-value considerations, and may award contracts by product category without guaranteeing an award in every category. The total maximum value across all contracts is $88 million, with each awarded IDIQ contract guaranteed a minimum of $2,000, and the acquisition is open to all responsible offerors without small business set-asides. The North American Industry Classification System code is 334111 for Electronic Computer Manufacturing, with a small business size standard of 1,250 employees, and the Product Service Code is 7B20 for High Performance Compute. All questions must be submitted using the official template no later than July 31, 2026, at 3:00 p.m. Eastern Time, and sent exclusively to Melissa Golicz at mgolicz@fbi.gov. Proposals are due by August 17, 2026, at 3:00 p.m. Eastern Time, also via email to the same address, with no submissions permitted through SAM.gov. Offerors must ensure timely receipt and may split large proposals across multiple emails, clearly labeling each part with sequence identifiers such as “Email 1 of 3,” with all components required to arrive by the deadline.
Fbi-Jeh

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details
NAICS: 334111
New
Federal
31 MXG - eTools Charging CabinetsThe U.S. Air Force is soliciting offers for a single Firm Fixed Price Purchase Order to procure twelve BRAND NAME Static Safe Products 10-drawer charging cabinets, model #LL-10-3.5-ST, designed specifically for rugged laptop computers. These cabinets must provide secure storage, battery recharging via UL-approved coiled cords with grounded outlets, WLAN connectivity through a patented coiled Cat 6 wire system and integrated Ethernet switch, environmental control with two 175cfm temperature-regulated fans and a UPS backup, and physical security features including a single-lock system for all drawers, a locking rear door, four wheels, and Velcro tie-downs inside each drawer. The cabinets must be finished in a durable textured powder coat in Tan, Black, or Stealth Blue. All items must be delivered directly to Aviano Air Base, Italy, with direct on-site assembly required, and the FOB point is destination. The solicitation number is FA568226QA022, issued as a Request for Quotation under NAICS code 334111, with a response deadline of July 24, 2026, at 1500 Central European Time. Offers must be submitted via email and include a separate technical submission, price quotation in the specified format, and full compliance with all terms, conditions, and amendments, including Attachment 1 (Salient Characteristics), Attachment 2 (Clause & Provision Set), and Attachment 3 (Air Force Specific Terms and Conditions). The contract is contingent upon the availability of appropriated funds, per FAR 52.232-18, and no award is guaranteed. The Government intends to make an award without discussions, so proposals must reflect the offeror's best terms. Pricing must include separate line items for the twelve cabinets and one shipping cost to Aviano AB. Contractors must comply with extensive regulatory and administrative requirements including SAM registration, submission of a Unique Entity Identifier and EFT details, adherence to the Prompt Payment Act, and use of the Wide Area WorkFlow system for invoice submission. Offerors must also comply with FAR 52.212-4 (Terms and Conditions—Commercial Products and Commercial Services), with specific deviations applied, and must meet security protocols for base access including vehicle and personal credentialing, compliance with DAFI 31-101 and DODMAN5200.02, and statutory obligations under the Service Contract Act or Davis-Bacon Act
FA5682 31 Cons (unit 6102)

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 334111
New
Federal
Notice of intent to award computing hardware to support propulsion systems upgradesThe U.S. Coast Guard intends to award a sole-source, firm-fixed-price contract to NAG, LLC for the supply of specialized computing hardware to support propulsion system upgrades aboard the USCGC 175’ WLM Abbie Burgess. The contract, valued at $108,328, will deliver six MilAxon 4000 rugged standalone computers and two 19-inch operator interface panels with integrated MilAxon 4000 units, along with mounting and field-side connector kits. NAG, LLC is designated as the sole distributor of this OEM equipment, which is critical for seamless integration with existing shipboard systems developed by the Naval Surface Warfare Center – Philadelphia Division. The decision to avoid competitive bidding is grounded in the Federal Acquisition Regulation’s provision for sole-source procurement when only one responsible source can meet the agency’s unique technical requirements, supported by statutory authority under 10 USC 3204(a)(1). The acquisition falls under NAICS code 334111 and is classified as a total small business set-aside, with NAG, LLC qualifying as a small business under the SBA size standard. The action is conducted under the Revolutionary FAR Overhaul guidelines, which streamline commercial acquisitions below the simplified acquisition threshold. While this notice does not constitute a solicitation for bids, interested parties may submit evidence demonstrating that competition would be feasible, cost-effective, and not detrimental to mission readiness. All submissions must be received by August 6, 2026, and are evaluated solely at the Government’s discretion. Communication regarding the notice must be directed via email to the designated Contracting Officer or Technical Point of Contact; phone inquiries will not be responded to. The contract will be performed in Rockland, Maine, with the contracting office located in Baltimore, Maryland.
Sflc Procurement Branch 3(00040)

POSTED

about 21 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 334290
New
Federal
N0038326PR0R690_FMSThe contract solicitation titled FMS_Repair_014744520, issued under solicitation number N0038326QN118, is a presolicitation notice posted by the Naval Supply Systems Command Weapon Systems Support, aDepartment of Defense agency, with the primary office located in Philadelphia, Pennsylvania. The notice outlines an upcoming opportunity for repair services under NAICS code 334290, which pertains to other electronic component manufacturing, and no set-aside provisions are in effect, meaning it is open to all eligible contractors regardless of size or status. Responses are due by July 16, 2026, at 8:00 PM Eastern Time, with the place of performance specified as Cedar Rapids, Iowa, indicating the physical location where the requested work must be performed. The point of contact for this opportunity is Dina M. Wojciechowski, reachable via email at DINA.M.WOJCIECHOWSKI.CIV@US.NAVY.MIL or by phone at (215) 697-1219, serving in the role of N731.53 within the agency. Prospective bidders are directed to the SAM.gov workspace link for additional details and documentation related to the solicitation. While the specific requirements for the repair services are held in attached documents referenced within the notice, the solicitation structure indicates an upcoming formal request for proposals or quotations following this presolicitation phase, with interested parties expected to prepare full responses before the deadline.
Other Communications Equipment Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 29 days
View Details
NAICS: 336413
New
Federal
NRP,FLAT PANEL DISPThe contract solicits repair services for two NRP, FLAT PANEL DISP units with NSN 1730-01-628-1418 and part numbers ARD17-LH-001 or 1001408-101, designated as flight-critical components essential for aircraft launch and recovery systems. All repairs must comply with technical specifications, engineering orders, and drawings, specifically drawing 3429AS4208 Revision NA, and require strict adherence to MIL-STD-130 marking standards and ANSI Z1.4 sampling procedures. The contractor must operate under a certified quality management system compliant with ISO 9001 and SAE AS9100, maintain a calibration system meeting ANSI/NCSL Z540.3, and ensure 100% inspection of critical characteristics, plating, hardness, and non-destructive testing. Repair turnaround time is strictly limited to 125 days from physical receipt of the asset, as logged in the Commercial Asset Visibility system, and failure to meet this requirement may result in financial consideration. The contractor must also submit a detailed repair procedure to NAWCADLKE engineering for approval before commencing work, and no deviations from approved procedures are permitted without formal government authorization. Only pre-approved sources eligible for engineering source approval by Naval Air Systems Command may bid; unapproved vendors must submit a comprehensive source approval package including configuration drawings, process sheets, production documentation, comparative analysis, and inspection method sheets—all submitted by the deadline. The contractor is responsible for procuring all materials, tools, fixtures, and test equipment without government provision, and cannibalization of parts is prohibited unless explicitly approved by NAVSUP WSS and the BDE. Items determined Beyond Economical Repair or Missing on Induction require written concurrence from DCMA and authorization from the PCO prior to any action. Repair records must be maintained for seven years and made accessible to the cognizant technical authority. All deliveries are subject to mandatory 100% inspection by the cognizant DCMA Quality Assurance Representative, with final inspection requiring 14 days’ prior notice to both the PCO and NAWC Lakehurst QA. Payment instructions, warranty terms (12 months from acceptance or 60 days after defect discovery), and compliance with Buy American and Equal Opportunity provisions are enforced, and early or incremental deliveries are preferred. Proposals must be submitted via email to dana.n.knittel
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 24 days
View Details
NAICS: 336413
New
Federal
16--VALVE ASSEMBLY,ENVI, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of Valve Assembly, Envi, with National Stock Number 1660-016884617, under solicitation N0038326QNA46, issued by the Naval Supply Systems Command Weapon Systems Support. The contractor is required to overhaul, repair, and test up to seven initial units within a 365-day induction period, extendable by an additional year at the Government’s discretion, with unused induction slots carrying forward. The contract includes options for up to 15 total units over its duration, with separate pricing required for the second year if rates change. The contractor must perform all work at the designated facility in Windsor Locks, Connecticut, using approved technical manuals and drawings, and must comply with strict configuration management, quality assurance, and parts control standards including ISO 9001 and SAE AS9100. The use of MIL-W-81381 wire is prohibited; SAE-AS22759 series wire must be used instead, and all parts must be new unless otherwise approved in writing. Any repairs classified as Beyond Economical Repair, Beyond Repair, Missing on Induction, or Over and Above Repair require prior written concurrence from the Defense Contract Management Agency and final approval from the Procuring Contracting Officer before work may proceed. The contractor is responsible for providing all tooling, test equipment, and facilities necessary to complete the work, with no Government-furnished items unless explicitly stated. Parts cannibalization is strictly prohibited without written approval from NAVSUP WSS and the BDE. The contractor must maintain rigorous documentation of all repair procedures, inspection results, and material certifications, and ensure full traceability of all components. Compliance with Buy American, Equal Opportunity, and Security Prohibition clauses is mandatory, and all personnel performing repair tasks must be certified per IPC/EIAJ-STD-001C. Any deviation from approved specifications, drawings, or repair sources requires prior Government authorization, and unauthorized changes invalidate the work at the contractor’s sole risk. The total contract value is based on the highest proposed unit price multiplied by the maximum allowable units, and pricing must reflect comprehensive cost coverage without relying on replacement values for Beyond Economical Repair determinations. All repairs must result in a Ready for Issue condition, and the contractor must adhere to MIL-STD-2073 packaging standards and secure, climate-controlled storage for all items throughout the lifecycle of the contract.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details
NAICS: 333998
New
Federal
99--DATA DISTRIBUTION S, IN REPAIR/MODIFICATION OFThis contract pertains to the repair, overhaul, and modification of defense-related components under solicitation N0038326QNA45, issued by the Naval Supply Systems Command Weapon Systems Support. The primary focus is on the service and restoration of specific equipment identified by part number 5895-LLZ98S384 and NSN 6m0j3-060000, with all work required to be performed in strict compliance with OEM technical manuals and approved repair procedures. The contractor must operate from a designated facility in Scottsdale, Arizona, and is responsible for providing all necessary tools, materials, and labor unless otherwise specified as Government Furnished Property. Work must result in items being returned to a Ready for Issue condition, with no deviations from approved procedures without formal Government authorization through designated channels. The contract imposes stringent quality, configuration, and compliance requirements, mandating adherence to ISO 9001/SAE AS9100 quality standards and ANSI/NCSL Z540.3 calibration protocols. All repairs are subject to configuration management controls under NAVSUP WSS clause NAVICPIA18, and any changes to drawings, specifications, or repair sources require explicit approval from the Procuring Contracting Officer. The contractor must also navigate complex provisions governing Beyond Economical Repair and Missing on Induction determinations, which require DCMA concurrence and formal Government direction before proceeding. Additionally, the contract enforces Buy American requirements, restrictions on pass-through charges, and security exclusions, while prohibiting unauthorized cannibalization of parts without Navy SUP WSS and Basic Design Engineer approval. The warranty period is one year from delivery, with defects to be corrected within 45 days of discovery, and all work must be conducted under a fully documented quality system with inspection and testing procedures available for Government audit.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details
NAICS: 336413
New
Federal
NIIN: 012422066/ NOMEN: ACTUATOR,ELECTRO-MECHANICAL,ROTARYThe U.S. Navy’s NAVSUP Weapon Systems Support in Philadelphia intends to award a sole-source repair contract to KEARFOTT CORPORATION for two electro-mechanical rotary actuators with part number 70400-02260-121 and NSN 7R1680012422066. No technical drawings or data are available to the Government, and it does not hold any rights to the intellectual property required to source this part from alternative suppliers. The procurement is justified under 10 U.S.C. 3204(a)(1) and FAR 6.302, as no other sources can meet the agency’s requirements and KEARFOTT CORPORATION is the only qualified provider. All other firms wishing to compete must submit a Source Approval Request, but the procurement will proceed without delay to await approval. This acquisition will be conducted under FAR Part 15 using negotiated procedures, excluding the commercial item acquisition policies of FAR Part 12. While the notice is not a formal request for proposals, submissions of capability statements received within 45 days of the synopsis date will be reviewed to assess whether competition is feasible. The effort is not set aside for small businesses, and all submissions must be sent electronically to the designated point of contact; no hard copies or phone inquiries will be accepted. The solicitation will be posted electronically via NECO, with the response deadline set for July 15, 2026.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB- AND SIMILAR REPLACEMENT PARTSThis contract solicitation, identified as N0038324QA186, seeks the furnishing of circuit card assemblies and similar replacement parts identified by NSNs 7RH 5998 014322383, 7RH 5998 014322488, 7RH 5998 014623473, and 7RH 5998 014623475, with corresponding part numbers 103E4035G3, 971E674G2, and 971E921G4, for a total quantity of 32 units. The solicitation is issued by the Navy’s Office of Supply and Weapon Systems Support in Philadelphia, Pennsylvania, and requires quotes to be submitted via email to meghan.e.gubicza.civ@us.navy.mil by the specified deadline. A government source approval is mandatory prior to award; non-approved suppliers must provide comprehensive documentation as outlined in the NAVSUP WSS source approval brochure, otherwise their offers will be rejected due to compliance and timing constraints. Early and incremental deliveries are preferred to support operational readiness. The contract incorporates numerous standard federal and naval clauses including requirements for inspection and acceptance of supplies, limitations on pass-through charges, Buy American Act compliance, and annual representations and certifications. Payment must follow Wide Area Workflow procedures with the cognizant DFAS and DCMA identified, and the invoice and receiving report must be submitted as a combined document. The contract is governed by the government’s definition of issuance, which considers contractual documents officially issued upon electronic transmission such as email, and formal acceptance of the proposal constitutes a binding agreement. The NAICS code 334412 applies, reflecting this procurement’s focus on electronic components, and the notice of priority rating indicates national defense urgency. Any previously listed purchase order lines have been canceled as redundant.
Bare Printed Circuit Board Manufacturing

POSTED

4 days ago

DEADLINE

in 24 days
View Details
NAICS: 336413
New
Federal
MONITOR,LCD AB DK,AThis contract solicits repair services for three specific Navy equipment items: a Video Switcher Mast(NSN 1710-015845451), a Mono Camera Low Light (NSN 1710-015845461), and an LCD Monitor (NSN 1710-015865114), with one unit of each to be repaired. The contractor must restore all items to a Ready for Issue (RFI) condition following approved repair manuals, technical specifications, engineering orders, and drawings, with no deviations permitted without formal approval from the Basic Design Engineer and DCMA. All repairs must be performed at the contractor’s facility, which is identified as IMENCO, LLC in Broussard, Louisiana, and the contractor is responsible for providing all labor, parts, materials, tools, and test equipment, as no Government Furnished Property is anticipated. The contractor must adhere to strict quality management standards per ISO 9001 and SAE AS9100, maintain a calibrated test system per ANSI/NCSL Z540.3, and implement configuration management compliant with NAVSUP WSS clause NAVICPIA18. Repair turnaround time is capped at 100 days from physical receipt of the asset, as recorded in the Commercial Asset Visibility system, and a monthly throughput target must be established. Induction of assets must occur within 365 days of contract award, and any asset received after this date requires bilateral agreement. The contractor must report and obtain written concurrence from DCMA for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) cases, with no repair proceeding without PCO authorization. Cannibalization is prohibited unless explicitly approved, and all purchased parts must be new and meet FAR 52.211-5 requirements. Government acceptance is mandatory prior to payment, and the contractor must adhere to Buy American requirements, security exclusions, and the mandatory use of Workflow Pro’s Assist Module for payment processing via invoice and receiving report combo. Offers must be submitted via email by the deadline, and only approved sources may be considered; non-approved offerors must submit full sourcing documentation from the NAVSUP WSS Source Approval Brochure.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

4 days ago

DEADLINE

in 27 days
View Details