Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

700 East Middlefield Road LinkedIn Office Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

SR 237 Service Rd, on the eastern edge of the Mountain View city limit, Mountain View, CA, 94043

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
Request to amend a previously approved Development Agreement (Permit No. PL-2107-074) to grant a five-year extension of the term for Phase 2 of a 429,491 square-foot office development project on a 28.7 - acre site. The previous EIR for the campus redevelopment project (State Clearinghouse No. 2017092025), certified on November 27, 2018 concluded that all significant environmental impacts would be reduced to less-than-significant levels with the incorporation of mitigation measures and standard City conditions of approval, except for the five significant and unavoidable intersection impacts, for which a Statement of Overriding Considerations and a Mitigation, Monitoring and Reporting Program (MMRP) was adopted. The proposed amendment to the DA does not alter the environmental conditions assessed in the certified EIR and would not result in any new environmental impacts beyond those previously evaluated and mitigated with the MMRP. Furthermore, the proposed amendment to the DA does not result in any change to the Project and does not require any revisions to the EIR due to the identification of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. There has been no new information of substantial importance which was not known and could not have been known with the exercise of reasonable diligence at the time the EIR was certified as complete. None of the circumstances in the CEQA Guidelines Sections 15162 and 15163 are present; therefore, no further environmental review is required.

More opportunities from California → City of Mountain View

Same awarding agency

NAICS: 236210
SLED
749 West El Camino Real Mixed-Use Project
Solicitation # 2023050251
The 749 West El Camino Real Mixed-Use Project in Mountain View, California, involves the demolition of an existing restaurant and bank building, along with associated parking and landscaping, to develop two new structures. The project consists of a two-story bank building and a six-story mixed-use building featuring 299 multi-family residential units, including 33 reserved for low- to very-low-income households, and up to 13,465 square feet of ground-floor commercial space. The development includes two levels of underground parking, a public plaza on El Camino Real, and the preservation of existing artwork from the original site. The project utilizes the State Density Bonus Law to achieve a floor-area-ratio of approximately 3.05 and adheres to Tier 1 development standards of the El Camino Real Precise Plan. The project is subject to strict environmental and safety compliance measures, including a construction health risk assessment for nearby residential units and a toxic assessment report for soil contaminants. Key infrastructure requirements include the installation of 458 total bicycle parking spaces, ADA-compliant curb ramps, and safety improvements to the Castro and El Camino intersection. Construction mandates prohibit the closure or narrowing of sidewalks and require traffic control plans approved by the Public Works Department in accordance with the California Manual of Uniform Traffic Control Devices. Additionally, the project must comply with CALGreen Tier 2 electric vehicle requirements, implement a Travel Demand Management program, and provide replacement trees for any removed Heritage Trees. The project was approved by the City Council on November 18, 2025, following a Final Environmental Impact Report.
Industrial Building Construction

POSTED

12 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS