Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

720821_CRPC_UIC

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

California Resources Production Corporation is undertaking a well rework operation at the Lehnhardt 53 well in the Kern Front Oil Field, Kern County, to convert the existing well into a temperature observation well. The work involves deploying a completion rig to nipple up and test the blowout preventer, pulling out the existing production equipment, cleaning out the wellbore to bottom, and running in a 3.5-inch casing string cemented from approximately 2,224 feet measured depth to surface. A Surface Annulus Pressure Test will be conducted under the direct observation of the California Department of Conservation, Geologic Energy Management Division, followed by a temperature survey to support ongoing monitoring. All activities are confined to the existing wellpad with no new ground disturbance, no permanent facilities constructed, and no expansion of associated infrastructure. Temporary mobile equipment including a workover rig, pumps, and return bins will be used, along with vehicles to transport personnel and materials. Waste materials will be handled and disposed of in accordance with applicable environmental regulations. The project is located at latitude 35.48757172 and longitude -119.03866577 within Section 14, Township 28S, Range 27E, and is subject to regulatory approval under the California Environmental Quality Act through Class 1, Class 2, and Class 4 categorical exemptions, which confirm that the activity constitutes maintenance, reconstruction, and minor land alteration with negligible environmental impact. Inspection and acceptance are performed on-site by CalGEM, with no federal procurement elements, contract pricing, or standard FAR clauses applicable, as this is a state-regulated environmental permitting action rather than a federal acquisition. The project was posted as a forecast on July 31, 2025, with a certification date of July 30, 2025, and all communications and oversight are handled through CalGEM’s central office in Bakersfield.

General Info

Rework Lehnhardt 53 well to temperature observation well with casing, no new disturbance, CalGEM oversight.

Agency

California Conservation, Department of

NAICS

213112 - Support Activities for Oil and Gas OperationsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

720821_CRPC_UIC CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Catherine CalantasOffice Technician

Full Description

Show more
CRPC proposes to rework Lehnhardt 53 in the Kern Front field to convert to temperature observation. Program Summary: MIRU Completion Rig, Nipple up & test BOPE. POOH with production equipment. Clean out to bottom. RIH with 3.5” casing string & cement in place from ~2224' MD to surface. Conduct CalGEM witness SAPT. Run temperature survey. Equipment: Temporary equipment such as pumps and return bins may be needed. No permanent facilities will be constructed. No expansion of associated facilities will be required. Various mobile temporary equipment will be used including, but not limited to, workover rig, etc., and vehicles to transport personnel and materials to/from the site. There will not be new ground surface disturbance associated with this project. Any waste materials will be properly disposed of in accordance with all applicable laws and regulations. Project Location: County: Kern, Field: Kern Front, Section 14, Township 28S, Range 27E, B&M: MD, Surface Location Latitude: 35.48757172/ Longitude -119.03866577. The proposed project is on an existing wellpad. Environmental Setting: The current existing land use (and surrounding land use) of the proposed project is in an active oil field consisting of oil and gas wells. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 1 permit(s) for California Resources Production Corporation to rework the well(s) listed below, in the Kern Front Oil Field. API # Well Name 0403043972 Lehnhardt 53

Similar Contracts

Same NAICS industry code

NAICS: 213112
New
Federal
H266--Boiler Plant Gas Detection Testing
Solicitation # 36C25626Q1147
The contract titled H266--Boiler Plant Gas Detection Testing is issued by the Department of Veterans Affairs through the 256-NETWORK Contract Office 16 located in Ridgeland, Mississippi, with a solicitation number of 36C25626Q1147. It was posted on August 10, 2026, and requires responses to be submitted by 5:00 PM on August 21, 2026. The work falls under NAICS code 213112, which pertains to oil and gas field machinery and equipment manufacturing, indicating the technical nature of gas detection systems tied to boiler plant operations. The primary point of contact for inquiries is Contract Specialist Angela M Kennedy, reachable via email at angela.kennedy2@va.gov. The place of performance details are unspecified, suggesting the testing may occur at one or more VA facilities housing boiler plants requiring gas detection system verification. This solicitation does not specify a set-aside type, meaning it is open to all eligible contractors without preference given to small businesses or other categories. The purpose is to ensure safety and regulatory compliance through accurate and reliable gas detection testing in boiler plant environments, likely involving calibration, sensor verification, alarm functionality, and system documentation. Contractors must possess expertise in hazardous gas monitoring systems and be capable of performing field testing under operational conditions without disruption to facility functions.
256-NETWORK Contract Office 16 (36C256)

POSTED

4 days ago

DEADLINE

in 7 days
View Details