Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

730308_Group_PGE_UGS

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE 730308 Group PGE UGS CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Mila GalevskiStaff Service Analyst

Full Description

Show more
Pacific Gas and Electric Company plans to rework the proposed wells to meet CalGEM Underground Gas Storage inspection and construction requirements as specified in 14 CCR § 1726. The proposed scope of work includes the following activities: retrieve existing tubing string and packer, retrieve production liner, perform casing integrity wireline surveys, replace existing wellhead, install new production liner and gravel pack, and install new tubing string and packer. The proposed project will require, at a minimum, the following equipment: Workover rig (double), mud pumps, cuttings bin blowout prevention equipment and accumulator, generator, fuel tanks, fluid Tanks, and light towers. All equipment will be staged and operated within the existing facility footprint and existing roadways will be used for access. This includes all ancillary equipment which may be required such as pump trucks, vac trucks, and casing storage. No new surface construction activities are planned with the rework. No new permanent facilities will be constructed and no expansion to associated facilities or roadways will be required. The project is anticipated to last from March to December 2025. The wells will be returned to service as a gas storage well with no change or expansion of existing use. The project is in an agricultural zone in San Joaquin County. San Joaquin County does not require any ministerial or discretionary permits for well reworks. The surrounding land use within a 3-mile radius is primarily agricultural. Waste material will be properly disposed of as non-hazardous or hazardous waste at a facility licensed to accept the waste. Secondary containment will be utilized for liquid HazMat's and workover fluids. No erosion controls will be required as these sites are all graveled. Water will be applied as mitigation for dust suppression from vehicle traffic. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 3 permits- UIC 45200001, for Supplementary Notice of Intention - Pacific Gas and Electric Company to Rework the well(s) listed below, in the McDonald Island Gas Oil Field. API: Well Name: 0407720173 Whiskey Slough 3-E 0407720219 Turner Cut 2-S 0407720228 Turner Cut 10-N

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS