This Solicitation opportunity from Michigan was posted on March 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this firstproject-statement
HighAI Summary for 2A-CM_24077_Project Statement - Belle Isle Abatement and Removals: This project statement from the Michigan Department of Technology, Management and Budget outlines the professional service contract (PSC) requirements for the Belle Isle Abatement, Zoo Removals, and Boathouse Removals project. The document, dated early 2024, specifies phases 200, 400, 500, 600, and 700 for the work, with construction management secured separately. Key dates include a walk-through inspection on March 7, 2024, and proposal due date on March 21, 2024. It provides submission instructions, contact information, and references appended scope of work documents. The project aims to complete phases through July 31, 2024, and complies with federal, state, and local regulations.
PDF
PDF, High priority: read this firstassessment-report
HighAI Summary for Belle Isle Building Assessment Report Part III: This document is the Belle Isle Building Assessment Report Part III dated 2024-02-06. It provides a detailed condition assessment and prioritized repair recommendations for six key buildings on Belle Isle, including the Casino, Athletic Shelter, Detroit Police Radio Station, Belle Isle Police Station, Flynn Pavilion, and White House. The report includes historical background, architectural style, general conditions, and detailed evaluations of exterior envelope, interior, accessibility, structural, mechanical, electrical, and environmental systems for each building. It also presents a prioritized list of repair and restoration work with associated concept-level construction cost estimates totaling approximately $15.2 million, categorized by urgency from immediate to level 3 (up to 10 years). The report supports planning and prioritization of maintenance and rehabilitation work by the Michigan State Department of Natural Resources.
PDF
PDF, High priority: read this firstpreliminary-structural-integrity-study-report
HighAI Summary for Belle Isle Garage Preliminary Structural Integrity Study Report 2023-08-29: This document is the Preliminary Structural Integrity Study Report for the Garage at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff, LLC, dated August 29, 2023. It includes an executive summary, scope, observations, findings, and maintenance recommendations. The report details the building's condition, noting damaged clay roof tiles, concrete caps, windowsills, retaining wall caps, and water damage to the storage area floor above the office. The building is operational as an MDNR storage facility with structural concerns requiring future maintenance, especially for the storage area above the office which is unsafe for access. The report also covers the roofing system, interior conditions, and accessibility determinations.
PDF
PDF, High priority: read this firststudy-report
HighAI Summary for Belle Isle Hazardous Material and Structural Study Master Document: This document is the Belle Isle Hazardous Material and Structural Study Master Document prepared by Beam, Longest, and Neff for the Michigan Department of Natural Resources and Department of Technology, Management and Budget. Dated September 8, 2023, it includes preliminary structural inspection studies and hazardous and regulated materials surveys for multiple structures at Belle Isle Park, Detroit, MI. The report contains detailed assessments of structural integrity and hazardous materials, along with recommendations for training and hazard communication. It also includes numerous attachments with specific reports on various park structures, cost estimates, and repair recommendations. The study aims to ensure safety and compliance for contractors and park management.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Belle Isle HRM Asbestos Material Sampling Report: This document is a detailed asbestos material sampling report for the Casino Building at 1 Casino Way, Detroit, Michigan, sampled from May 13 to May 18, 2022. It lists various materials sampled throughout the building, including decorative concrete, glass block windows, floor tiles, ceiling panels, window glaze, insulation, caulks, plaster, roofing materials, and more. Each entry includes sample ID, location, material type, condition, firability, estimated quantity, and asbestos content. The report identifies materials with no detectable asbestos (ND) and some with trace or specific asbestos content percentages. This report is critical for understanding the presence and condition of asbestos-containing materials in the building for safety and compliance purposes.
PDF
PDF, High priority: read this firsthazardous-materials-survey-report
HighAI Summary for Belle Isle HRM Survey Report Part 8 Photographic Log and Flynn HRMS Report: This document is part 8 of the Belle Isle Hazardous and Regulated Materials (HRM) survey report, dated February 6, 2024. It includes Attachment 3, a photographic log showing detailed images of asbestos containing materials (ACM) and various painted surfaces at the Central Power Plant and Flynn Pavilion. The report was prepared by Beam, Longest, and Neff for the Michigan Department of Natural Resources. It documents the non-destructive survey conducted in May 2023, including sampling of 161 asbestos bulk samples from 53 homogenous areas. The report covers asbestos, lead-based paint, other regulated materials, mold observations, and provides conclusions and recommendations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Belle Isle IA Building Demolition and Foundation Plans: This document contains demolition and foundation plans for the Belle Isle IA Building New DNR Offices project in Detroit, Michigan, dated February 6, 2019. It includes general demolition notes, demolition keynotes, and foundation plan general notes. The document outlines contractor responsibilities, demolition scope including removal of concrete slabs, walls, and abandoned equipment, and foundation construction details such as new concrete slabs, steel dowels, and concrete rail slopes. It emphasizes compliance with federal, state, and local regulations, coordination among trades, and protection of existing structures and finishes during demolition and construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Belle Isle Phase 2 Bid Pack 1 Mechanical and Plumbing Plans: This document contains detailed mechanical, plumbing, and sheet metal general notes and construction key notes for the Belle Isle Phase 2 Bid Pack 1 project dated February 6, 2019. It includes reflected ceiling plans, plumbing system arrangements, sheet metal system coordination, and exhaust fan control instructions. The document is prepared by Peter Basso Associates Inc and WTA Architects for the State of Michigan Department of Technology, Management and Budget. It provides critical installation guidelines, coordination requirements, and system support details essential for construction and bid preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Belle Isle Phase 2 Bid Pack 1 - Roof New Power and Auxiliary Systems Plan: This document contains general notes and specifications for the Belle Isle Phase 2 Bid Pack 1 project, specifically the Roof New Power and Auxiliary Systems Plan dated February 6, 2019. It includes installation instructions, coordination requirements, and sizing standards for electrical and mechanical systems. The document emphasizes coordination with architectural drawings, provision of access for maintenance, and adherence to electrical standard schedules. It is intended to guide contractors in the proper installation and integration of mechanical and electrical systems for the project.
PDF
PDF, High priority: read this firstpreliminary-structural-integrity-study-report
HighAI Summary for Belle Isle Shelter No. 8 Preliminary Structural Integrity Study Report: This document is a Preliminary Structural Integrity Study Report for Shelter No. 8 - Bath Lunch Shelter at Belle Isle Park, Detroit, MI, prepared for the Michigan Department of Natural Resources by Beam, Longest, and Neff, dated August 10, 2023. It includes an executive summary, scope of services, limiting conditions, certification by a licensed professional engineer, and detailed observations of the building's structural condition. The report identifies water damage, gutter system failures, paint deterioration, and surface rust on metal columns, with recommendations for future maintenance to ensure the structure remains viable. The study supports safe access for hazardous materials surveys and occupancy by state employees and park visitors.
PDF
PDF, High priority: read this firsthazardous-materials-report
HighAI Summary for Belle Isle White House Hazardous and Regulated Materials Inspection Report: This document is the Hazardous and Regulated Materials Inspection Report for the White House building at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff on September 8, 2023. It details the scope, methodology, and results of a hazardous materials survey conducted on June 14, 2023, including asbestos bulk sampling, lead-based paint analysis, and evaluation of other regulated materials. The report includes laboratory analytical results, mold observations, and recommendations for handling identified hazardous materials during renovation or demolition. Attachments include laboratory reports, exhibits, and a photographic log.
PDF
PDF, High priority: read this firstsow
HighAI Summary for DNR Scope of Work for HRM Removals 02.24.2024: This Scope of Work document dated 02.24.2024 outlines the demolition and hazardous material removal projects for the Zoo, Boathouse, and Island Wide areas under a total construction budget of 5 million dollars. It details phases of work including construction bid documents, demolition of above and below grade structures, removal of pavements and fencing, disposal and restoration specifications, and required permits. The document also includes cost analysis studies for partial removals and restoration, ADA accessibility improvements, stormwater management, and hazardous material remediation such as lead paint and asbestos-containing material abatement. The scope covers masonry and structural repairs, exterior and interior finish work, and building demolition with references to regulatory compliance and safety for public access.
PDF
PDF, High priority: read this firsthazardous-materials-report
HighAI Summary for Hazardous and Regulated Materials Inspection Report - Belle Isle Golf Starter Building: This report, prepared by Beam, Longest, and Neff on June 7, 2023, for the Michigan Department of Natural Resources, details a hazardous and regulated materials (HRM) survey conducted at the Belle Isle Golf Starter Building. The survey identified asbestos-containing materials (ACM), lead-based paint, and other regulated materials including universal wastes. Fifty-three asbestos samples were analyzed with none found to contain asbestos above 1%, though some materials were assumed to contain asbestos. Lead paint sampling found no lead above detection limits. The report also notes the presence of regulated materials such as fluorescent lamps, ballasts, and chemical cleaners, and recommends proper disposal prior to renovation or demolition. A limited mold assessment found no visible mold but suggests further inspection. The document includes methodology, laboratory results, and recommendations for abatement and compliance.
PDF
PDF, High priority: read this firsthazardous-materials-report
HighAI Summary for Hazardous and Regulated Materials Inspection Report - Belle Isle Shelter No.2: This document is a Hazardous and Regulated Materials Inspection Report prepared by Beam, Longest, and Neff for the Department of Natural Resources regarding Shelter No.2 at Belle Isle Park, Detroit, MI. Dated September 8, 2023, it details the scope, methodology, and findings of a hazardous materials survey conducted on May 17, 2023. The report includes identification and analysis of asbestos-containing materials, lead-based paint, regulated materials, and universal wastes, as well as observations of mold and animal fecal matter. It provides recommendations for abatement and proper disposal prior to renovation or demolition activities.
PDF
PDF, High priority: read this firstinspection-report
HighAI Summary for Hazardous and Regulated Materials Inspection Report - Belle Isle Stone Comfort Station: This document is the Hazardous and Regulated Materials (HRM) Inspection Report for the Stone Comfort Station at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff on September 8, 2023. It details a non-destructive survey conducted on June 20, 2023, to identify asbestos-containing materials, lead-based paint, and other regulated materials. The report includes laboratory analytical results showing no asbestos detected above 1% in sampled materials, but lead was found in paint samples. It also identifies universal wastes present and provides recommendations for proper disposal prior to demolition. Additionally, a limited mold assessment was conducted with recommendations for further inspection. The report contains photographs, a detailed table of contents, and certification information for the inspectors.
PDF
PDF, High priority: read this firsthazardous-materials-report
HighAI Summary for Hazardous and Regulated Materials Inspection Report - Shelter No. 10 Belle Isle Park: This document is a Hazardous and Regulated Materials (HRM) Inspection Report for Shelter No. 10 at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff on September 8, 2023. It details the scope, methodology, and findings of the asbestos and lead-based paint survey conducted on May 17, 2023. The report includes laboratory analytical results showing no asbestos-containing materials detected above 1%, but two paint samples contained lead above detection limits. It also covers the identification of other regulated materials, mold observations, and recommendations for further inspection. The report supports the Michigan Department of Natural Resources in prioritizing abatement activities for hazardous materials in park structures.
PDF
PDF, High priority: read this firsthazardous-materials-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Belle Isle Bus Stop Shelter No.7: This report, prepared by Beam, Longest and Neff for the Michigan Department of Natural Resources, documents the hazardous and regulated materials survey conducted on June 16, 2023, at Belle Isle Bus Stop Shelter No.7. The survey included asbestos bulk sampling, lead-based paint analysis, and identification of other regulated materials and universal wastes. Results showed no asbestos-containing materials in sampled areas, with one material assumed to contain asbestos. Lead was detected in nine of ten paint samples. The report also includes a visual mold assessment with no visible mold found. The document provides detailed methodology, laboratory results, and recommendations for handling hazardous materials prior to demolition or renovation.
PDF
PDF, High priority: read this firsthazardous-materials-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Belle Isle Kids Row Comfort Station: This document is a Hazardous and Regulated Materials (HRM) Survey Report for the Kids Row Comfort Station at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff for the Michigan Department of Natural Resources. Dated September 7, 2023, the report details a non-destructive survey conducted on June 15, 2023, to identify asbestos-containing materials, lead-based paint, and other regulated materials. It includes laboratory analysis results showing no asbestos detected above 1% in sampled materials, except the roof system assumed to contain asbestos. Lead paint samples showed no detectable lead. The report also identifies universal wastes and regulated materials present, provides mold observations, and offers conclusions and recommendations for abatement and proper disposal.
PDF
PDF, High priority: read this firsthazardous-materials-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Belle Isle North Fishing Pier: This report, prepared by Beam, Longest, and Neff on September 8, 2023, for the Michigan Department of Natural Resources, documents a hazardous and regulated materials (HRM) survey conducted on June 30, 2023, at the North Fishing Pier of Belle Isle Park, Detroit, MI. The survey aimed to identify asbestos-containing materials (ACM), lead-based paint, and other regulated materials. Sampling and laboratory analysis found no asbestos above 1% concentration but detected lead in two paint samples. The report includes inspection methodology, laboratory results, and recommendations for further mold inspection and handling of discovered materials during renovation or demolition. It also discusses regulatory considerations for hazardous and universal wastes.
PDF
PDF, High priority: read this firsthazardous-materials-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Belle Isle Stables: This report, prepared by Beam, Longest, and Neff on September 8, 2023, for the Michigan Department of Natural Resources, details the hazardous and regulated materials survey conducted at Belle Isle Stables in Detroit, MI. The survey, completed on July 10, 2023, identified asbestos-containing materials (ACM), lead-based paint, and other regulated materials across four buildings. It includes laboratory analysis results, observations of mold and animal-related conditions, and recommendations for abatement and disposal. The report supports regulatory compliance and prioritization of abatement activities.
PDF
PDF, High priority: read this firsthrm-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Belle Isle Woodside Shelter: This document is the Hazardous and Regulated Materials (HRM) Survey Report for the Woodside Shelter at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff on September 8, 2023. The report details the scope, methodology, and results of the HRM survey conducted on May 19, 2023, including asbestos and lead-based paint sampling and analysis. It confirms no asbestos-containing materials or lead above detection limits were found in sampled materials. The report also covers identification of other regulated materials, universal wastes, and mold observations, with recommendations for future handling of suspect materials during renovations. The document includes an executive summary, introduction, description of the structure, and attachments such as laboratory reports and photographic logs.
PDF
PDF, High priority: read this firsthazardous-materials-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Livingstone Lighthouse Belle Isle Park: This document is a Hazardous and Regulated Materials (HRM) Survey Report for the Livingstone Lighthouse located at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff for the Michigan Department of Natural Resources. Dated September 8, 2023, the report details a non-destructive survey conducted on June 8, 2023, identifying asbestos-containing materials, lead-based paint, universal waste, and mold observations. It includes laboratory analytical results, photographic logs, and recommendations for handling identified hazardous materials. The report aims to support prioritization of abatement activities for the structure built in 1930.
PDF
PDF, High priority: read this firsthrm-survey-report
HighAI Summary for Hazardous and Regulated Materials Survey Report - Woodside Comfort Station: This document is the Hazardous and Regulated Materials (HRM) Survey Report for the Woodside Comfort Station at Belle Isle Park, Detroit, MI, prepared by Beam, Longest, and Neff on July 28, 2023. It details the scope, methodology, and results of asbestos, lead-based paint, and other hazardous materials surveys conducted on June 6, 2023. The report includes laboratory analytical results, identification of asbestos-containing materials (ACM), lead paint findings, and observations on other regulated materials and mold. It provides recommendations for handling and disposal prior to renovation or demolition activities, emphasizing regulatory compliance and safety.
PDF
PDF, High priority: read this first62 pages · contract-document
HighAI Summary for Michigan Professional Services Contract Billing Rate Rev 221207: This document is a Professional Services Contract issued by the State of Michigan Department of Technology, Management and Budget for architectural and/or engineering services. It authorizes the professional to provide services for a specified project under a billing rate, not to exceed a set amount. The contract outlines the scope of work, compensation terms, project phases, and conditions including compliance with state regulations and requirements for contract modifications. The contract is dated 2022 and includes provisions for project management, personnel substitution, and budget monitoring.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 751/24077 SMD Belle Isle Park Abatement and Removals: This Request for Proposals (RFP) issued by the Michigan Department of Technology, Management & Budget solicits professional service contractors for a not-to-exceed fee, billable-rate contract for services related to Belle Isle Park Abatement, Zoo Removals, and Boathouse Removals in Detroit, Michigan. The RFP includes submission instructions, evaluation criteria (80% technical, 20% cost), mandatory pre-proposal meeting details, and contract award procedures. Proposals are due by March 21, 2024, and must be submitted electronically via the SIGMA VSS system. The document outlines the scope of work phases, professional qualifications, and responsibilities, emphasizing compliance with local, state, and federal regulations.
PDF
PDF, Low priorityinspection-report
LowAI Summary for Belle Isle Aquarium Hazardous and Regulated Materials Inspection Report: This document is the Hazardous and Regulated Materials Inspection Report for the Belle Isle Aquarium in Detroit, Michigan, prepared by Beam, Longest, and Neff in July 2023. It includes a detailed survey of asbestos-containing materials, lead-based paint, and other regulated materials present in the building. The report contains laboratory analytical results, photographic documentation, and recommendations for handling hazardous materials prior to renovation or demolition. It also notes observations of suspect mold growth and advises further comprehensive mold inspection. The report serves as a reference for safe management and disposal of hazardous substances in the facility.
PDF
PDF, Low priorityother
LowAI Summary for Belle Isle Hazardous Material and Structural Study Master Document: This document is the master document for the Belle Isle Hazardous Material and Structural Study prepared for the Department of Natural Resources by Beam, Longest, and Neff, dated September 8, 2023. It includes a table of contents covering an introduction, preliminary structural inspection study, hazardous and regulated materials study, and training and hazard communication recommendations. The document also lists numerous attachments and exhibits related to structural investigations, hazardous material studies, and repair recommendations for various structures and facilities within Belle Isle Park.
PDF
PDF, Low priorityother
LowAI Summary for Belle IsleHRM_20240206_PART III_Part2 Sample Collection Report: This document appears to be a sample collection report from ASTI Environmental for project #9321, collected by D. Amir on 10/5/15. It lists various sample numbers, identification locations, types, and related testing methods such as PLM EPA and TEM. The report includes turnaround times, special instructions, and handling notes for samples. It is not a solicitation or contract document but rather a technical or laboratory report related to environmental sampling.
PDF
PDF, Low priorityother
LowAI Summary for Belle IsleHRM 20240206 Part IV Part3 Photo Documentation: This document contains photographic documentation of various buildings at Belle IsleHRM, dated February 6, 2024. It includes multiple photos showing different elevations, interior and exterior damage such as missing trim, damaged ceilings, floor damage, peeling paint, and water damage across several buildings labeled as Building #2, #3, and #4. The photos are organized by building and location, providing visual evidence of the current condition of the structures.
PDF
PDF, Low priorityother
LowAI Summary for Belle IsleHRM 20240206 Part IV Part6 - Paint and ACM Photo Documentation: This document, dated February 6, 2024, is part of the Belle IsleHRM series, specifically Part IV Part6. It contains photographic documentation of various paint conditions and asbestos-containing materials (ACM) in different buildings and structures. The photos show detailed views of paint colors and conditions on wood, metal, brick, and other surfaces, as well as ACM locations such as exterior caulk, siding, and heat shields. The document serves as visual evidence for condition assessment or remediation planning.
PDF
PDF, Low priorityother
LowAI Summary for Belle IsleHRM 20240206 Part IV Part7 - Asbestos and Paint Condition Photos: This document contains photographic evidence related to the condition of asbestos-containing materials (ACM) and various paint conditions at Belle Isle. It includes detailed photos of ACM pipe insulation, vapor barriers, exterior caulks, and paint on wood, metal, and brick surfaces. The photos are labeled with identifiers and depict different types of ACM and paint colors on various building components. The document appears to be part of a larger report or assessment dated February 6, 2024, focusing on hazardous material conditions and paint conditions in multiple buildings and areas.
PDF
PDF, Low priorityphotographic-log
LowAI Summary for Belle IsleHRM 20240206 Part IV Photographic Logs: This document is part IV of the Belle IsleHRM project dated 2024-02-06, specifically Part 5, containing photographic logs. It includes numerous photos documenting various building components such as stables, ACM (Asbestos Containing Material) in exterior caulks, window glaze, pipe insulation, flooring, paint colors on wood and metal surfaces, and other materials. The photos are labeled with identifiers and descriptions, providing visual evidence for the project. The document appears to be a supporting record rather than a primary solicitation or technical specification.
PDF
PDF, Low prioritytest-report
LowAI Summary for Belle Isle HRM Asbestos and Lead Testing Report 2024-02-06: This document is a test report dated 2024-02-06 for the Belle Isle HRM project. It includes asbestos bulk building materials chain of custody details and lead in paint chips analysis by Flame AAS. The report lists sample numbers, locations, material descriptions, and lead concentration results for various samples collected on 6/6/2023 and analyzed on 6/9/2023. The report is issued by EMSL Analytical, Inc. and signed by the Laboratory Manager. It provides detailed test results but does not constitute a solicitation or contract document.
PDF
PDF, Low prioritypast-performance
LowAI Summary for Belle IsleHRM Environmental Professional Credentials and Reports: This document is Appendix A of the Belle IsleHRM procurement, dated 2024-02-06, containing detailed credentials and professional background of Jelaine D. Tinsley, an Environmental Professional. It includes her certifications, licenses, education, extensive experience in environmental site assessments, asbestos inspections, abatement oversight, and hazardous material surveys across multiple states. The document also provides examples of her project work, including vapor intrusion evaluations, construction testing, and underground storage tank remediation. Additionally, it contains accreditation card information related to asbestos inspection compliance under Michigan Public Act 440 of 1988.
PDF
PDF, Low priorityreport
LowAI Summary for Belle Isle HRM Structural Condition Report Part 2: This document is part 2 of the Belle Isle Historic Resource Management (HRM) report dated 2024-02-06. It provides detailed observations and assessments of the structural and material conditions of various sections of the Belle Isle conservatory, including the North Wing, South Wing, and Show House. The report covers interior and exterior conditions such as planter walls, kneewalls, steel framing, cast iron sills, glazing systems, and mortar conditions. It notes areas requiring tuckpointing, minor corrosion, and structural concerns like thin concrete walls and mortar loss. The document includes numerous figures illustrating the conditions described.
PDF
PDF, Low priorityconditions-assessment
LowAI Summary for Belle Isle Remick Music Shell Conditions Assessment 41802820: This document is a conditions assessment report for the Belle Isle Remick Music Shell, prepared for the State of Michigan Department of Natural Resources. It includes overall building elevations, repair scopes for historic building restoration, and general contractor instructions. The report emphasizes compliance with applicable laws and preservation of historic materials. The issue date is October 29, 2020, and it contains detailed elevation keys and repair scope legends for stone, window, and other exterior restoration work.
PDF
PDF, Low priorityroof-measurement-report
LowAI Summary for Belle Isle Roof Measurement Report 20240206 Part III: This document is a roof measurement report for Belle Isle, Detroit, MI, dated August 21, 2015. It provides detailed measurements including total roof area (18,597 sq ft), number of roof facets (89), predominant pitch (6/12), and lengths of ridges, hips, valleys, rakes, eaves, and penetrations. The report includes diagrams of roof pitch, area, notes, and penetrations, as well as tables summarizing areas per pitch, waste calculations, and penetration details. The report is produced by EagleView Technologies and is intended for internal use only by the requestor.
PDF
PDF, Low prioritystructural-assessment-report
LowAI Summary for Belle Isle Sawmill Structural Condition Assessment Report 2018: This document is a structural condition assessment report for the Belle Isle Sawmill in Detroit, Michigan, prepared by Wiss, Janney, Elstner Associates, Inc. dated August 28, 2018. It provides a visual evaluation of the sawmill's structural framing, preliminary structural analysis of the wood and steel framed second floor, and conceptual recommendations for future use. The report includes a general building description, observations of the first and second floors, and notes on the building's history and current condition. The purpose is to inform restoration efforts for public educational use and demonstrations of sawmill operations.
LowAI Summary for Hazardous and Regulated Materials Survey Report - Athletic Shelter Belle Isle Park: This document is a Hazardous and Regulated Materials Survey Report for the Athletic Shelter at Belle Isle Park, Detroit, MI, prepared for the Department of Natural Resources by Beam, Longest, and Neff. The report, dated August 31, 2023, includes an executive summary, introduction, survey scope, certification, structure description, inspection methodology, laboratory analytical results, lead-based paint sampling, other hazardous materials, mold observations, and conclusions. It contains photographic evidence of assumed asbestos-containing materials (ACM) and various paint conditions throughout the facility.
PDF
PDF, Low priorityreport
LowAI Summary for Hazardous and Regulated Materials Survey Report - Belle Isle Oxbow Restroom: This document is a Hazardous and Regulated Materials (HRM) Survey Report prepared by Beam, Longest, and Neff for the Department of Natural Resources regarding the Oxbow Restroom at Belle Isle Park, Detroit, MI. Dated May 15, 2023, the report details the identification and analysis of asbestos-containing materials (ACM), lead-containing paint, and other regulated materials within the structure. It includes survey scope, inspection methodology, laboratory results, and recommendations for handling hazardous materials and mold observations. The report aims to support abatement prioritization and compliance with environmental regulations.
XLSX
XLSX, Low prioritybudget-scope-review
LowAI Summary for HRM Budget Scope Review 02.16.2024: This document is a budget scope review dated February 16, 2024, detailing estimated costs for various structures and projects related to HRM. It includes cost estimates for abatement, materials, LED lighting, and other maintenance or remediation activities across multiple buildings and structures. The document provides mid-range cost estimates, notes on specific project elements, and a total budget figure of $2,000,000. It serves as a financial planning and review tool rather than a solicitation or contract document.