This Solicitation opportunity from Michigan was posted on October 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for 11504 SC Cafeteria Upgrades Advertisement For Bids: This document is an Advertisement for Bids for the Rochester Community Schools 2020 Sinking Fund project involving Stoney Creek High School Cafeteria Upgrades. It provides key details including the architect and construction manager contacts, bid document availability starting October 22, 2024, and a non-mandatory pre-bid walk-through scheduled for October 29, 2024. The bid due date is November 5, 2024, with a public bid opening the same day. Requirements include a 5% bid bond, performance and payment bonds for bids over $50,000, and disclosure statements including familial relationships and Iran Economic Sanctions Affidavit. Prevailing wage rates are not required, and the project is not exempt from state sales tax.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 2024 Auditorium AV Upgrade RFP - Addendum 1: This document is Addendum 1 to the Request For Proposal for the Auditorium Audio Visual Upgrade at Mattawan Consolidated School District. It provides additional instructions and clarifications including the location of the system head end in the AV Rack behind the lighting console, the option for contractors to follow the existing cable path, and specifications for 8-inch wall-mount control station touch screens at designated locations. The deadline for submittal is October 25, 2024, at 10:30 AM, with bid opening immediately following.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 2024 Auditorium Lighting Upgrade RFP - Mattawan Consolidated School: This Request for Proposal (RFP) dated 2024 is issued by Mattawan Consolidated School District for the purchase and delivery of new LED lighting equipment for the high school auditorium, including various lighting fixtures and related hardware. Installation will be performed by the school district. The document outlines bidder qualifications, bid submission requirements, project schedule with a completion date of December 31, 2024, and terms regarding deficient work and legal compliance. Bids are due by October 25, 2024, with questions accepted until October 23, 2024. The RFP includes detailed instructions on bid format, contact information, and the district's rights regarding bid acceptance.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 791/24431.GSA - MDARD Geagley Laboratory Window Replacement: Request for Proposal (RFP) from the State of Michigan DTMB for professional architectural and engineering services to replace the window system at the MDARD Geagley Laboratory. The scope includes multiple design phases (Study, Schematic, Preliminary, Final) and Construction Administration. Proposals are due October 31, 2024, via SIGMA VSS, with a mandatory pre-proposal meeting on October 16, 2024.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 791/24431.GSA - MDARD Geagley Laboratory Window Replacement: The State of Michigan DTMB is seeking professional architectural and engineering services for window system replacement at the MDARD Geagley Laboratory. The scope includes multiple phases from study and schematic design through construction administration. Proposals are due by October 31, 2024, and a mandatory pre-proposal meeting is scheduled for October 16, 2024.
PDF
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for Advertisement for Bids 23-8-24 AAS Middle School Renovation & Krause Elementary Mechanical Upgrades: This document is an Advertisement for Bids for the Armada Area Schools project dated 23-8-2024, covering the AAS Middle School Renovation and Krause Elementary Mechanical Upgrades in Armada, MI. It specifies the bid submission deadline as October 29, 2024, at 1:00 pm local time, with bids to be received at the Armada Area Schools Administration Building. A public bid opening will occur at that time. The document also notes the availability of bidding documents from October 29, 2024, at Barton Malow Builder's Site Office and online platforms. A pre-bid conference and site tour are scheduled for October 14, 2024, at Armada Middle School.
PDF
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for Advertisement for Bids - New Haven High School Boiler and Piping Replacement: This document is an Advertisement for Bids issued by New Haven Community Schools for the Boiler and Piping Replacement project at New Haven High School under the 2019 Bond Program. It provides key dates including document availability from October 14, 2024, a pre-bid meeting on October 16, 2024, and bid submission deadline on October 29, 2024. The document outlines bid submission requirements such as sealed proposals, bid bonds for proposals over $29,572, and performance bonds for successful bids over $50,000. Bids will be publicly opened via Zoom. The Board reserves the right to reject any or all bids and to accept the bid deemed in the best interest of the owner.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Beal City Public Schools 2024 Bond Project Bid Advertisement: This document is an Advertisement for Bids for the Beal City Public Schools 2024 Bond Project involving additions and renovations. It invites qualified contractors to submit sealed bid proposals by October 29, 2024, with a public bid opening scheduled shortly after. The document details the bid submission process, including electronic bidding options, pre-bid meeting information, bid security requirements, and necessary affidavits such as familial disclosure and Iran Business Relationship Affidavit. It also outlines the bid divisions covering various construction trades and materials. The document emphasizes the owner's rights to reject or accept bids and provides contact information for obtaining bidding documents and submitting questions.
DOCX
DOCX, High priority: read this firstifb
HighAI Summary for FI-217 Mobile Food Establishment Decal 2025 Bid Request: This document is a bid request from the Department of Technology, Management & Budget for printing services of the FI-217 Mobile Food Establishment Decal 2025. It specifies a quantity of 999 pairs (1998 total labels) with detailed requirements including size, finish, text color, perforation, packing, and proof requirements. Vendors must submit detailed quotes and provide a color PDF proof for approval prior to production. The award will be based on best price and value, considering past quality and ability to meet requirements, with only prequalified vendors eligible.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for FI-219 Special Transitory Food Unit Decal 2025 Bid Request: This document is a bid request from the Department of Technology, Management & Budget for the production of 4500 Special Transitory Food Unit Decals for 2025. The decals are 4 inches in diameter, made of pressure sensitive 2 mil thick aluminum stock with a continuous backing and perforation between decals, over laminated for protection with permanent adhesive. The text color is PMS 12-0645 Lemon Tonic with black printing. Vendors must provide a detailed quote letter and a color PDF proof for approval prior to production. The department awards bids based on best price and value, considering past quality and ability to meet requirements, with only prequalified vendors considered.
DOCX
DOCX, High priority: read this firstifb
HighAI Summary for FI-219 Special Transitory Food Unit Decal 2025 Bid Request: This document is a bid request from the Department of Technology, Management & Budget for the production of 4500 Special Transitory Food Unit Decals for 2025. The decals are 4 inches in diameter, made of pressure sensitive 2 mil thick aluminum stock with continuous backing and perforation, over laminated for protection with permanent adhesive. The text color is PMS 12-0645 Lemon Tonic with black printing. Vendors must provide a detailed quote letter and a color PDF proof for approval prior to production. The department awards bids based on best price and value, considering past quality and ability to meet requirements. Only prequalified vendors will be considered.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Floor Plans: The document consists of architectural floor plans providing technical spatial specifications for a procurement project. As a technical specification document, it defines the physical requirements and layout of the facility.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB#25-0002 Oakland Schools Corridor Refresh: This document is an Invitation for Bids (IFB#25-0002) issued by Oakland Schools for corridor refresh work including demolition, architectural, plumbing, HVAC, and electrical services at multiple campuses. The bidding documents are available from October 9, 2024, with a pre-bid meeting scheduled for October 15, 2024. Bids must be submitted by 2:00 PM EST on November 5, 2024, and include a certified check or bid bond of at least 5% of the proposal amount. Bids will be publicly opened on the same day. Successful bidders over $50,000 must provide performance and payment bonds. The document outlines submission requirements, including notarized affidavits and the right of the Board to reject bids or waive irregularities.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Michigan Professional Services Contract Billing Rate Rev 221207: This document is a Professional Services Contract issued by the State of Michigan Department of Technology, Management and Budget for architectural and/or engineering services. It authorizes the professional to provide services for a specified project under a billing rate, not to exceed a set amount. The contract outlines the scope of work, compensation terms, project phases, and conditions including compliance with state regulations and requirements for written modifications. It also details responsibilities such as attendance at meetings, verification of data, and restrictions on bidding construction work. The contract is dated 2022 and includes signature blocks for both the professional and the state representatives.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Project 2804: Hayes Intermediate School Renovations - IFB: Invitation for Bids (IFB) for the Hayes Intermediate School and Transportation Building Renovations for Grand Ledge Public Schools. This specific notice is for Bid Category 12 (Manufactured Casework). Bids are due by 10:30 a.m. on Tuesday, October 29, 2024. Requirements include a 5% bid security, familial disclosure, and Iran-linked business certification.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 2024-21 (BP51) - Adler Stage Lighting: Request for Bid Proposals issued by Barton Malow Builders for the construction of BP51 Morris Adler Stage Lighting. Bids are due by October 29, 2024, at 11:00 AM Local Time via Building Connected or physical delivery. The document outlines submission requirements, including notarized familial relationship disclosures, non-Iran Linked Business certifications, and specific bonding requirements (Bid, Performance, and Payment bonds) for contracts exceeding $50,000.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 2024-21 (BP51) - Morris Adler Stage Lighting: Request for Bid Proposals issued by Barton Malow Builders for the construction of BP51 Morris Adler Stage Lighting. Bids are due by October 29, 2024, at 11:00 AM Local Time via Building Connected or physical delivery. The document specifies requirements for bid bonds, performance and payment bonds for bids exceeding $50,000, and mandatory certifications regarding familial relationships and non-Iran linked business status.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 791/24431 Geagley Laboratory Window Replacement Professional Services: This Request for Proposals (RFP) issued by the Department of Technology, Management & Budget, State Facilities Administration, seeks professional service contractors for the Geagley Laboratory Window Replacement project in East Lansing, Michigan. The RFP covers multiple design and construction administration phases and requires submission of a technical and cost proposal by October 31, 2024. Evaluation will be based 80% on technical qualifications and 20% on cost. The document includes instructions for proposal submission, mandatory pre-proposal meeting details, and contract award criteria. The professional must be licensed in Michigan and demonstrate experience with similar projects.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP-Telephone System-West Ottawa FY24 Addendum (2): Dated October 21, 2024, this addendum provides detailed responses to vendor inquiries regarding the West Ottawa Public Schools telephone system RFP. It includes technical specifications on server virtualization (VMware), SIP trunking (Charter Spectrum), paging system compatibility (Dukane and Bogen Nyquist), license counts (1,000), and hardware requirements. It also clarifies installation expectations and the potential project kickoff in December 2024.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State of Michigan Professional Services Contract - Billing Rate: A professional services contract template from the State of Michigan Department of Technology, Management and Budget (DTMB) for architectural and engineering services. The document establishes the legal agreement, scope of work, and compensation terms for a 'Not to Exceed' billing rate contract, including requirements for project schedules, personnel substitutions, and compliance with the Natural Resources Environmental Protection Act.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State of Michigan Professional Services Contract - Billing Rate: A professional services contract template from the State of Michigan Department of Technology, Management and Budget (DTMB) for architectural and engineering services. The document establishes the legal framework for a 'Billing Rate - Not to Exceed' agreement, outlining the scope of work, compensation terms, and compliance with the Natural Resources Environmental Protection Act.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State of Michigan Professional Services Contract: Billing Rate - Not to Exceed: A professional services contract template from the State of Michigan Department of Technology, Management and Budget (DTMB). The document establishes the terms for architectural and engineering services, including scope of work, compensation based on a 'Not to Exceed' billing rate, and compliance with the Project/Program Statement and state regulations.
DOCX
DOCX, High priority: read this first4 pages · contract-document
HighAI Summary for State of Michigan Standard Contract Terms (Short Form): This document contains the State of Michigan's Standard Contract Terms (Short Form) for procurement. It outlines vendor obligations including acceptance of terms, delivery, title and risk of loss, inspection rights, payment terms, warranties and representations, and termination clauses for cause and convenience. The document also covers indemnification responsibilities of the vendor. It is intended to govern the contractual relationship between the State and vendors, ensuring compliance with specified terms and protecting the State's interests. The version date is not explicitly stated but the content is comprehensive and critical for contract administration.
XLSX
XLSX, Low priorityother
LowAI Summary for Beal City Commodity Codes List: This document is an Excel spreadsheet titled 'Beal City Commodity Codes.xlsx' containing a list of commodity codes associated with various construction and trade categories. The sheet includes categories such as Concrete, Masonry, Metals, General Trades, Roofing, Glass & Glazing, Drywall, Insulation & Acoustical, Tile, Flooring, Painting, Metal Lockers, Athletic Equipment, Casework, Plumbing & HVAC Systems, Electrical, Site Work, and Asphalt Paving, each paired with a specific commodity code number. The document serves as a reference for commodity classification rather than a solicitation or contract document.
PDF
PDF, Low priorityother
LowAI Summary for floor plans: Unreadable document.
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyMichigan → Technology, Management and Budget