This Solicitation opportunity from Pennsylvania was posted on April 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Contract 2025-01243 is an agreement between West Norriton Township and a selected contractor for the FEMA demolition of a single-family home and all associated impervious surfaces at 82 West Indian Lane in Montgomery County, Pennsylvania. The scope of work includes complete building demolition, trash and material removal, erosion and sediment control, grading, soil compaction, and the restoration of the site with topsoil and grass. The contractor is responsible for all labor, equipment, tools, and local permitting, while ensuring compliance with OSHA standards, Pennsylvania Act 287 for utility protection, and maintaining public access to Lori Lane and Surrey Lane. The project is governed by a Floodplain Site Restoration Permit and requires adherence to PA DEP and PennDOT standards for site stabilization.
The project timeline specifies a notice to proceed by June 8, 2026, with substantial completion due by July 24, 2026, and final payment readiness by August 7, 2026, with liquidated damages applicable for delays. Financial and legal protections include a performance bond, a payment bond, a maintenance bond covering defects for 18 months post-completion, and specific insurance requirements. Payment is managed via a unit price method based on measured work, subject to the submission of a construction schedule within 15 days of the notice to proceed. Additionally, the contractor must comply with prevailing wage determinations, the Public Works Employment Verification Act, and Commonwealth Standard Terms and Conditions for Hazard Mitigation Grants.
General Info
West Norriton Township contract for FEMA home demolition and site restoration at 82 West Indian.
XLSX, High priority: read this firstbid-tabulation
HighAI Summary for 82 W. Indian Lane - Bid Table BT-19FN: A bid tabulation spreadsheet for the 82 W. Indian Lane project (BT-19FN). The document compares unit and total pricing for demolition, site grading, and restoration services from three vendors: BRB Contractors, Farhat Excavating LLC, and James R Kenney Excavating & Paving Inc.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 82 W. Indian Lane - Summary of Work (Section 01 11 13): This document is Section 01 11 13, Summary of Work, for the demolition of the property at 82 West Indian Lane in West Norriton Township, Montgomery County, PA. It outlines the scope of work, including demolition of the building and impervious surfaces, erosion control, grading, and soil compaction. It specifies contractor responsibilities regarding site use, utility protection per Pennsylvania Act 287, and coordination with the owner to maintain public access to Lori Lane and Surrey Lane.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Bid Bond and Prevailing Wage Determination for 82 W. Indian Lane Demolition: This document includes a Bid Bond and an Appendix A containing the Prevailing Minimum Wage Determination for the demolition project at 82 W. Indian Lane, West Norriton Township, Montgomery County, PA. It details the project scope involving demolition and site restoration, with the contractor responsible for all related work and compliance. The wage determination section lists prevailing wage rates effective as of various dates, covering multiple labor classifications such as asbestos workers, boilermakers, carpenters, electricians, and laborers, including hourly rates and fringe benefits. The document is dated around 2025-2026 and is issued by the Bureau of Labor Law Compliance, Philadelphia Field Office, for project number 26-03214.
PDF
PDF, High priority: read this firstterms-and-conditions
HighAI Summary for Commonwealth Standard Terms and Conditions Grant Version 2 (Revised 10/1/2023): This document is the Commonwealth Standard Terms and Conditions for a Hazard Mitigation Grant, revised as of October 1, 2023, Version 2. It defines key terms and outlines important provisions including indemnification, nondiscrimination and sexual harassment policies, grantee integrity, and related obligations. The document mandates compliance with federal, state, and local laws, requires the grantee to maintain nondiscrimination policies, and details consequences for violations. It also includes definitions relevant to grantee integrity and representations and warranties regarding legal and ethical conduct within the last five years.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Construction Project Schedule Section 01 32 16: This document is Section 01 32 16 titled Construction Project Schedule. It outlines the requirements for preparing, maintaining, and revising the construction project schedule to monitor progress and duration. The schedule must be submitted within 15 calendar days after the Notice to Proceed, with detailed activity descriptions, durations, start and finish dates, and a workday calendar. The engineer will review the schedule within 10 days. Failure to submit the schedule timely may result in withholding progress payments and mandatory scheduling meetings. The document relates to coordination and meetings specified in Section 01 31 00.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 2025-01243: 82 West Indian Lane FEMA Demolition Agreement: This document is the Agreement for Contract 2025-01243 between West Norriton Township (Owner) and the Contractor for the demolition of the single-family home at 82 West Indian Lane, West Norriton Township, PA. It outlines the scope of work including demolition, erosion control, grading, and removal of materials. The Agreement specifies contract times with a notice to proceed by June 8, 2026, substantial completion by July 24, 2026, and final payment readiness by August 7, 2026, including liquidated damages for delays. Payment procedures, progress payments, retainage, and final payment terms are detailed. Interest on late payments and contractor representations are also included. The document is a formal contract agreement governing the project execution and payment.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Contract Considerations Section 01 29 00: This document is Section 01 29 00 titled Contract Considerations, outlining general contract administration procedures. It includes instructions for the schedule of values, applications for payment, change procedures, and alternates. Key content covers submission requirements for payment applications, change order processes including stipulated price, unit price, time and material changes, and the handling of alternates. The document references related contract sections and specifies formats and timelines for submissions. It serves as a critical guide for managing contract modifications, payments, and project alternates.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Doc 00 61 13.13 Performance Bond - Basic Requirements Section: This document is a section of a construction contract titled 'Basic Requirements' from Doc 00 61 13.13 Performance Bond. It outlines general contract considerations including schedule of values, applications for payment, and change procedures. It details coordination and meetings such as preconstruction, site mobilization, progress, and pre-installation meetings. The document also covers submittal procedures, quality control measures, construction facilities and temporary controls, material and equipment handling, system startups, and contract closeout procedures. The content is structured to guide the contractor on administrative and procedural requirements for project execution and closeout.
PDF
PDF, High priority: read this firstmaintenance-bond
HighAI Summary for Maintenance Bond for Contract 2025-01243: 82 West Indian Lane FEMA Demolition: This document is a Maintenance Bond associated with Contract 2025-01243 for the 82 West Indian Lane FEMA Demolition project. It binds the Principal and Surety to indemnify the Obligee against defects in materials or workmanship for 18 months after final completion and acceptance of the work. The bond amount is 15% of the agreement price. The bond ensures the Principal will repair or reimburse for any defects during the maintenance period. The document includes signature blocks for the Principal and Surety companies and notes requirements for authority certification if signed by persons other than the Surety's President or Vice President.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Measurement and Payment Section 01 22 00: This document is Section 01 22 00 titled 'Measurement and Payment' from a project manual, detailing the criteria for measurement and payment under a unit price payment method. It includes procedures for measurement by the Resident Project Representative, ensuring work is performed according to Drawings and Project Manual. The section covers payment terms for various construction activities such as installation and maintenance of erosion and sediment controls, building demolition and disposal, bituminous pavement removal, concrete pavement removal, grading, topsoil import and spreading, and seeding disturbed areas. Each item specifies measurement methods and payment as lump sum or unit price, constituting full compensation for labor, materials, equipment, and related work. The document is essential for understanding payment calculations and contract compliance for the project.
PDF
PDF, High priority: read this firstpayment-bond
HighAI Summary for Payment Bond for West Norriton Township Contract: This document is a Payment Bond related to a contract awarded by West Norriton Township, located at 1630 W Marshall Street, Jeffersonville, PA. It outlines the obligations of the Contractor and Surety to pay for labor, materials, and equipment furnished for the contract work. The bond includes terms for claims by laborers and suppliers, conditions under which the bond is null and void, and procedures for notice and claims. It also defines key terms such as Claimant, Contract, and Owner Default. The bond is intended to ensure payment to claimants and protect the Owner from claims of nonpayment. The document includes signature blocks for the Contractor and Surety and references compliance with statutory requirements. The bond is essential for contract performance assurance and legal compliance.
XLSX
XLSX, High priority: read this firstperformance-bond
HighAI Summary for Performance Bond Document 00 61 13.13 for West Norriton Township: This document is a Performance Bond (Document 00 61 13.13) prepared by the Engineers Joint Contract Documents Committee for West Norriton Township. It outlines the obligations and responsibilities of the Contractor, Surety, and Owner regarding the performance of a contract. Key provisions include conditions under which the Surety's obligations arise, procedures following a Contractor Default, and the extent of Surety's liability. The bond ensures contract completion and covers costs related to contractor default, including legal and delay costs. It also specifies notice requirements, legal jurisdiction, and statutory compliance. The document is essential for contract performance assurance and risk mitigation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: Technical specifications detailing the measurement and payment criteria for various site work items, including E&S controls, building demolition, pavement removal, grading, topsoil application, and seeding. It defines the basis of measurement (lump sum/unit price) and what constitutes full compensation for each task.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: Technical specification section 01 29 00 detailing contract administration requirements, including the schedule of values, application for payment processes, change order procedures (stipulated, unit price, and time and material), and the handling of project alternates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 Coordination and Meetings: This document is Section 01 31 00 titled 'Coordination and Meetings' from a project manual. It outlines the coordination and project conditions, field engineering requirements, and procedures for various meetings including preconstruction, site mobilization, progress, and pre-installation meetings. The section details responsibilities for scheduling, submittals, and coordination of interdependent construction elements. It also covers cutting and patching work, including requirements for maintaining structural integrity and visual quality. The document specifies attendance and agenda items for meetings, record keeping, and coordination after owner occupancy. The version or date is not explicitly stated in the excerpt provided.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and meeting protocols. It outlines the agenda and attendance requirements for preconstruction and progress meetings, as well as standards for cutting and patching during construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 16 - Construction Project Schedule: Technical specification section 01 32 16 detailing the requirements for the preparation, maintenance, and revision of the construction project schedule. It specifies submission deadlines (15 days after Notice to Proceed), required schedule components (activity descriptions, durations, and dates), and the potential withholding of progress payments for non-compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: Technical specification section 01 33 00 detailing the requirements and procedures for submittals, including construction progress schedules, product data, shop drawings, samples, design data, test reports, and certificates. It outlines the submission process, review timelines, and documentation standards required for the Engineer's approval.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 35 16 - Alteration Project Procedures: Technical specifications for Alteration Project Procedures (Section 01 35 16), detailing requirements for patching, extending work, transitions, adjustments, repair of damaged surfaces, finishes, and cleaning during renovation projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Control: This technical specification section outlines the quality control requirements for the project, including quality assurance, installation tolerances, reference standards, mock-up requirements, testing laboratory services, observation services, and manufacturer field services. It also details the examination and preparation of substrate surfaces prior to the application of new work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 Construction Facilities and Temporary Controls: Technical specifications for Section 01 50 00 detailing requirements for construction facilities and temporary controls, including temporary utilities, sanitary facilities, barriers, water and dust control, security, access roads, and waste removal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specifications detailing the contractor's obligations for traffic regulation during construction. It covers the provision of traffic control plans, signage, flag persons, parking controls, and notification requirements for local authorities and emergency services to ensure safe traffic movement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 56 39 - Landscape Protection: Technical specifications for landscape protection during construction, detailing requirements for protective fencing, site preparation, root protection, pruning standards, and fertilization protocols to ensure plant survival.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 13 - Soil Erosion and Sediment Control: Technical specifications for Section 01 57 13 regarding Soil Erosion and Sediment Control. The document outlines requirements for implementing erosion control plans, reference standards (PA DEP and PennDOT), material specifications for filter socks and silt fences, and execution procedures for temporary and permanent site stabilization.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 14 - Erosion Control Blanket: Technical specifications for the furnishing and installation of biodegradable erosion control blankets. The document details material composition (straw and coconut fiber blend), shipping and storage requirements, site preparation, and specific geotextile placement and anchoring instructions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: This document is a technical specification section (01 60 00) detailing the requirements for materials and equipment. It covers product transportation, handling, storage, protection, substitution procedures, and equipment guarantee requirements, including a minimum 12-month manufacturer guarantee from the date of operation.
PDF
PDF, High priority: read this firststandard-general-conditions
HighAI Summary for Standard General Conditions of the Construction Contract - EJCDC 2007: This document is the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC) and jointly issued by major engineering and construction organizations in 2007. It provides comprehensive general conditions governing construction contracts, including definitions, preliminary matters, contract documents, bonds and insurance, contractor and owner responsibilities, changes in the work, payments, suspension and termination, dispute resolution, and miscellaneous provisions. The document is intended to standardize contract terms and facilitate clear understanding between owners, contractors, and engineers in construction projects.
PDF
PDF, High priority: read this firstsummary-of-work
HighAI Summary for Summary of Work for Demolition Project at 82 West Indian Lane: This document is Section 01 11 13 Summary of Work for a demolition project at 82 West Indian Lane, West Norriton Township, Montgomery County, PA. It outlines the scope including demolition of existing property, removal and replacement with grass, erosion control, grading, soil compaction, trash removal, and local permitting. The contractor is responsible for all materials, labor, supervision, and completion per drawings and specifications. It details work by owner and other parties (none anticipated), owner-supplied products (none), contractor use of site, protection of utilities, notification requirements, OSHA compliance, cooperation with owner, and work sequence. The document emphasizes maintaining public access on Lori Lane and Surrey Lane and restoration of disturbed areas. No future work is associated with this contract. The document serves as a critical guide for contractor responsibilities and project execution.
PDF
PDF, High priority: read this firstsupplementary-conditions
HighAI Summary for Supplementary Conditions for Construction Contract: This document, titled Supplementary Conditions Table of Contents, amends or supplements the Standard General Conditions of the Construction Contract, EJCDC No. C-700 (2007 Edition). It includes defined terms, commencement of contract times, schedule of values, finalization of schedules, contract documents, subsurface and physical conditions, reference points, and other contract-related provisions. The document also contains appendices related to prevailing wage determination, employment verification, permits, and grant terms. It is a critical contract document providing detailed conditions and requirements for the construction project.
PDF
PDF, High priority: read this firstsupplementary-conditions
HighAI Summary for Supplementary Conditions for Construction Contract EJCDC C-700 (2007 Edition): This document, titled Supplementary Conditions for the Construction Contract EJCDC No. C-700 (2007 Edition), amends and supplements the Standard General Conditions of the Construction Contract. It includes defined terms, commencement of contract times, schedule of values, finalization of schedules, contract documents, subsurface and physical conditions, reference points, and other provisions. The document outlines additional terms, responsibilities, and requirements such as insurance coverage, payment information, environmental pollution prevention, prevailing wage acts, and dispute resolution. Appendices include prevailing wage determinations, employment verification forms, permits, and grant terms. It is a critical document for understanding contract modifications and conditions applicable to the construction project.
PDF
PDF, Low priorityother
LowAI Summary for 00 82 W. Indian Lane FEMA Plans: The provided document content is empty or unreadable, though the filename suggests it pertains to FEMA plans for 00 82 W. Indian Lane.
PDF
PDF, Low priorityaddenda
LowAI Summary for Addenda Notice for Bidding Documents: This document, titled 'Addenda,' outlines the issuance of addenda related to bidding documents. It specifies that addenda issued before the bidding documents are obtained will be included in those documents, while addenda issued afterward will be posted on the PennBid website. The document serves to inform bidders about the handling and availability of addenda during the bidding process.
PDF
PDF, Low prioritycertificate-of-insurance
LowAI Summary for Certificate of Insurance for 82 West Indian Lane FEMA Demolition: This document is a Certificate of Insurance related to the project at 82 West Indian Lane FEMA Demolition under Contract 2025-01243. It specifies additional insured parties including West Norriton Township and Gilmore & Associates, Inc. Coverage and limit requirements are referenced in Document 00 73 00, Section 1.10.
PDF
PDF, Low priorityconsent-of-surety
LowAI Summary for Consent of Surety to Final Payment for Contract 2025-01243: This document is the Consent of Surety to Final Payment related to Contract 2025-01243 for the West Indian Lane FEMA Demolition project in West Norriton Township, PA. It confirms that the surety company, after examining the contractor's records or affidavit, approves the final payment to the contractor, ensuring all labor and material claims are settled. The document also states that the surety's obligations remain despite the final payment. It requires signature and seal from the surety company and notes that if signed by someone other than the president or vice president, a certificate of authority must accompany the document.
PDF
PDF, Low prioritycontractor-affidavit
LowAI Summary for Contractor's Affidavit for Contract 2025-01243 FEMA Demolition: This document is a Contractor's Affidavit related to Contract 2025-01243 for the FEMA Demolition project at 82 West Indian Lane. It includes a sworn statement by the contractor affirming that all labor, materials, claims, and indebtedness arising from the contract work, including approved change orders, have been satisfied and paid in full. The affidavit is to be notarized, confirming the contractor's compliance with payment obligations under the agreement with West Norriton Township.
PDF
PDF, Low prioritycontractor-release-of-liens
LowAI Summary for Contractor's Release of Liens for Contract 2025-01243: This document is the Contractor's Release of Liens associated with Contract 2025-01243 for the 82 West Indian Lane FEMA Demolition project with West Norriton Township. It certifies that the contractor has received full payment and releases the owner from any further claims related to the contract. The release is contingent upon receipt of the final payment and includes a notary section for sworn affirmation.
PDF
PDF, Low prioritypermit-document
LowAI Summary for Floodplain Site Restoration Permit FSR4601226-001: This document is a Chapter 106 Floodplain Site Restoration Permit issued to West Norriton Township for a project involving demolition and site restoration at 82 West Indian Lane, Eagleville, PA. The permit, dated March 9, 2026, authorizes floodplain restoration activities including removal of structures, excavation, debris removal, and stabilization of disturbed areas. It includes project data, site location details, floodplain project checklists, and permit conditions such as erosion control, waste disposal, and regulatory compliance. The permit outlines special conditions and requirements for project site plans to ensure proper floodplain management and environmental protection.
PDF
PDF, Low priorityemployment-verification-form
LowAI Summary for Pennsylvania Public Works Employment Verification Form: This document is the Commonwealth of Pennsylvania Public Works Employment Verification Form. It affirms that the contractor or subcontractor complies with the Public Works Employment Verification Act by utilizing the federal E-Verify Program to verify employment eligibility of new hires. The form requires the authorized representative to attest to the truthfulness of the information and acknowledges potential sanctions for false submissions. It is intended for use in public works contracts to ensure legal employment verification.
PDF
PDF, Low priorityspecifications
LowAI Summary for Section 01 42 13 - Organization and Reference Acronyms: This document is a technical specification section providing a comprehensive schedule of acronyms and associated organizations or references (e.g., AASHTO, ANSI, OSHA, PADOT) used throughout the Project Manual.
Ref. #: West Norriton Township, Montgomery County The project involves the demolition of the existing single-family home at 82 West Indian Lane in West Norriton Township, Montgomery County, PA. All buildings and associated impervious surfaces will be removed and replaced with grass. The Contractor is responsible for all erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract.