Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

821410_HWOC_UIC

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Holmes Western Oil Corporation is authorized by the California Department of Conservation, Geologic Energy Management Division (CalGEM) to perform a rework of well USL-17/GOVT 109, located in the Midway-Sunset Oil Field in Kern County, California. The project, identified as 821410_HWOC_UIC, involves adding perforations to the well to return it to injection service. The scope of work is expected to be completed within two days and will be conducted entirely within existing facilities to ensure there is no expansion of former use. Required temporary equipment for the operation includes a production rig, rig pump, wireline truck, vacuum truck, and bins, along with vehicles for personnel transport and waste removal. The project is classified as a forecast under NAICS code 213112 and is exempt from full environmental review under the California Environmental Quality Act (CEQA). Specifically, it meets categorical exemptions Class 1 for existing facilities, Class 2 for replacement or reconstruction, and Class 4 for minor land disturbances, as it is determined to have no significant environmental impact. CalGEM serves as the lead agency responsible for inspection and acceptance based on these environmental standards. No federal contract clauses, pricing data, or specific award evaluation factors are associated with this state-level regulatory notice.

General Info

Holmes Western Oil to rework well USL-17/GOVT 109 for injection service using temporary equipment within existing boundaries.

Agency

California Conservation, Department of

Place of Performance

North and 602' West of Southeast corner of Section 17, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Randall P. JeffriesOil and Gas Program Analyst
Raquel AguilarEngineering Technician II

Full Description

Show more
HWOC proposes to rework existing well USL-17/GOVT 109 by adding perforations and returning the well to injection. The project is expected to take 2 days. All equipment will be contained within existing facilities and there will be no expansion of existing former use. Temporary equipment needed for the project includes a Production Rig, Rig Pump, Wireline Truck, Vacuum Truck, and Bins. Vehicles needed to transport personnel, deliver supplies and materials, and transport waste will also visit the project site. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving # permit(s) for Holmes Western Oil Corporation (H5200) to rework the well(s) listed below, in the Midway-Sunset Oil Field. API # Well Name 0403069128 Govt 109

Similar Contracts

Same NAICS industry code

NAICS: 213112
New
SLED
DS-761-270000000005-1 | Fisher McCall 12th Ave. OW Plug&Decom 2-Facility 8-wells
Solicitation # 270000000005
Direct Solicitation 270000000005, issued by the Michigan Department of Environment, Great Lakes, and Energy, seeks a prequalified vendor to perform the plugging, decommissioning, and site restoration of eight orphan wells and two facilities in Ottawa County. The scope of work includes cleaning out wellbores, electronic logging, and cementing to protect the freshwater aquifer, as well as removing surface infrastructure, debris, and flow-lines. Flow-lines deeper than three feet must be abandoned in place, cut four feet below grade, and capped with welded steel. All sites must be graded, mulched, and seeded upon completion. The project requires adherence to Davis-Bacon prevailing wages and mandates prior approval from the State of Michigan Underground Injection Control Program for the disposal of purge fluids. Proposals were due by November 19, 2026, following a mandatory pre-bid meeting on November 5, 2026. The State is not obligated to accept the lowest price proposal; instead, awards are based on a technical evaluation requiring a minimum of 80 points. Evaluation criteria are equally weighted at 25 percent each for key personnel, business-owned equipment, technical experience and ability, and a vendor questions worksheet. The contract is governed by the State of Michigan's Standard Contract Terms Short Form, which includes requirements for deliverable quality, intellectual property rights, and strict confidentiality regarding state data.
Con Hall

POSTED

3 days ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS