830-030-173-01 | Upgrade HVAC Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Solicitation 830-030-173-01 involves the analysis, recommendation, and design for upgrading HVAC systems at the University of Illinois - Chicago. The project focuses on three specific facilities: the College of Nursing, the Medical Center Administration building, and the Physical Education Building. The scope of work includes upgrading air handling units, fan coil units, variable air volume boxes, variable frequency drives, instrumentation, and communication devices for building automated systems, as well as necessary piping, ductwork, insulation, and interior finishes or lighting. Because the buildings will remain occupied and may contain hazardous materials, work must be prioritized based on funding. Additionally, the State Historic Preservation Office must be consulted throughout all phases of the project. The estimated total project cost is 19,970,500 dollars, with an appropriated amount of 18,282,000 dollars. Notably, 1,688,500 dollars is designated for Owner's Costs and is unavailable for design and construction. The selected Architect/Engineer is responsible for ensuring the design remains within budget, complying with the Illinois Stretch Energy Code where applicable, and pursuing all available utility incentives, energy grants, and rebates. The project will utilize a Construction Manager, and the A/E is encouraged to use independent cost estimators to avoid bid overruns. Requirements include 4,000,000 dollars in professional liability insurance and adherence to the Illinois Works Jobs Program Act Apprenticeship Initiative for prevailing wage eligible work. Interviews are tentatively scheduled for January 7, 2027, with final selections presented on February 9, 2027.
General Info
Place of Performance
IL, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The scope of work provides for an analysis, recommendation, estimates, and design for upgrading the HVAC systems, including, but not limited to, air handling units, fan coil units, variable air volume boxes (terminal units), variable frequency drives, instrumentation, communication devices for building automated systems, required piping and ductwork with insulation, and other deficient required auxiliary equipment for the systems, and interior finishes/lighting work as needed. The work will need to be prioritized based on available funding. The buildings will remain occupied while work is complete. Hazardous materials may be encountered.
Specifically for work impacting the Medical Center Administration building, the State Historic Preservation Office should be consulted during every phase of this project. The State Historic Preservation Office should also be consulted during every phase of the other projects.
A Construction Manager will be assigned for this project.
$1,688,500 of the total project cost is for University of Illinois Owner's Costs and are not available for design and construction.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtainavailable incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code.
Similar Contracts
Same NAICS industry code
More opportunities from University of Illinois
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS