Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

831487_0100006_SoCalGas_UGS

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Southern California Gas Company proposes to rework the Fernando Fee 32F gas storage well at Aliso Canyon as part of the Storage Integrity Management Program. The project focuses on inspecting well integrity and remediating identified conditions to return the well to service. Key operations include pulling completion equipment, cleaning to total depth, performing punch and inject procedures, conducting integrity tests, and installing new completion tubing, with potential casing expansions subject to CalGEM approval. This project will utilize temporary equipment such as mud pumps and return bins without constructing any permanent facilities or expanding existing infrastructure. All waste materials, including brine kill fluid, will be disposed of at licensed facilities. The work will take place within an established oil field in San Fernando, California, and requires a permit from the California Department of Conservation, Geologic Energy Management Division.

General Info

SoCalGas will inspect and remediate the Fernando Fee 32F well at Aliso Canyon.

Agency

California Conservation, Department of

NAICS

N/A

Place of Performance

1557.04' South and 1828.78' East from Station 84, San Fernando, CA

Set-Aside

NONE

Documents

(1)

831487_0100006_SoCalGas_UGS

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Randall P. JeffriesOil and Gas Program Analyst
Juan Cadavid OrtizSubmitter

Full Description

Show more
Southern California Gas Company proposes to Rework existing Gas Storage well Fernando Fee 32F at Aliso Canyon UGS 0100006. The intent of this project is to inspect the well integrity and remediate identified conditions as part of the Storage Integrity Management Program (SIMP). After reviewing well history, available directional surveys and inspection logs, and current wellbore configuration (casing size, restrictions, perforations, liner, etc.), a plan has been developed to return the well to service. This project includes pulling completion equipment, cleaning to total depth, performing punch and inject, and probable casing expansions as proposed and with approval from CalGEM, perform integrity tests, and run new completion tubing. Temporary equipment such as a mud pump and return bins will be utilized. No permanent facilities will be constructed during the process, and no expansion of associated facilities will be required. All waste material, including brine kill fluid, will be properly disposed of as non-hazardous or hazardous waste, as appropriate, at a facility licensed to accept the waste. The established oil field surrounding the project location consists of graded pads, wells, oilfield equipment and roadways with areas of undisturbed non-native grasses and California sage brush vegetation. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 1 permit for Southern California Gas Company (S4700) to rework the well listed below, in the Aliso Canyon Gas Field. API # Well Name 0403721313 Fernando Fee 32F