Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

842100_0100006_SoCalGas_UGS

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Southern California Gas Company proposes to rework the Fernando Fee 32 gas storage well at Aliso Canyon UGS 0100006 as part of the Storage Integrity Management Program. The project focuses on inspecting well integrity and remediating identified conditions to return the well to service. Key operational steps include pulling completion equipment, cleaning to total depth, performing punch and inject procedures, conducting integrity tests, and installing new completion tubing, with potential casing expansions subject to CalGEM approval. The project will utilize temporary equipment such as mud pumps and return bins, with no permanent facilities being constructed. All waste materials, including brine kill fluid, will be disposed of at licensed facilities. This activity is conducted within an established oil field environment and requires a permit from the California Department of Conservation, Geologic Energy Management Division. The project is located in San Fernando, California, and is associated with API number 0403721279.

General Info

SoCalGas will inspect and remediate the Fernando Fee 32 gas storage well.

Agency

California Conservation, Department of

Place of Performance

San Fernando, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Randall P. JeffriesOil and Gas Program Analyst
Juan Cadavid OrtizSubmitter

Full Description

Show more
Southern California Gas Company proposes to Rework existing Gas Storage well Fernando Fee 32 at Aliso Canyon UGS 0100006. The intent of this project is to inspect the well integrity and remediate identified conditions as part of the Storage Integrity Management Program (SIMP). After reviewing well history, available directional surveys and inspection logs, and current wellbore configuration (casing size, restrictions, perforations, liner, etc.), a plan has been developed to return the well to service. This project includes pulling completion equipment, cleaning to total depth, performing punch and inject, and probable casing expansions as proposed and with approval from CalGEM, performing integrity tests, and running new completion tubing. Temporary equipment such as a mud pump and return bins will be utilized. No permanent facilities will be constructed during the process and no expansion of associated facilities will be required. All waste material, including brine kill fluid, will be properly disposed of as non-hazardous or hazardous waste, as appropriate, at a facility licensed to accept the waste. The established oil field surrounding the project location consists of graded pads, wells, oilfield equipment and roadways with areas of undisturbed non-native grasses and California sage brush vegetation. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 1 permit for Southern California Gas Company (S4700) to rework the well listed below, in the Aliso Canyon Gas Field. API # Well Name 0403721279 Fernando Fee 35C

Similar Contracts

Same NAICS industry code

NAICS: 213112
New
SLED
DS-761-270000000005-1 | Fisher McCall 12th Ave. OW Plug&Decom 2-Facility 8-wells
Solicitation # 270000000005
Direct Solicitation 270000000005, issued by the Michigan Department of Environment, Great Lakes, and Energy, seeks a prequalified vendor to perform the plugging, decommissioning, and site restoration of eight orphan wells and two facilities in Ottawa County. The scope of work includes cleaning out wellbores, electronic logging, and cementing to protect the freshwater aquifer, as well as removing surface infrastructure, debris, and flow-lines. Flow-lines deeper than three feet must be abandoned in place, cut four feet below grade, and capped with welded steel. All sites must be graded, mulched, and seeded upon completion. The project requires strict adherence to Davis-Bacon Prevailing Wages and necessitates prior approval from the State of Michigan Underground Injection Control Program for the disposal of purge fluids. Proposals were due by November 19, 2026, following a mandatory pre-bid meeting on November 5, 2026. The State is not obligated to accept the lowest price proposal; instead, awards are based on a technical evaluation requiring a minimum of 80 points. Evaluation criteria are equally weighted at 25 percent each across four categories: key personnel, business-owned equipment, technical experience and ability, and a vendor questions worksheet. The contract is governed by the State of Michigan's Standard Contract Terms Short Form, which mandates that all deliverables meet industry standards and remain free from third-party intellectual property infringements.
Con Hall

POSTED

3 days ago

DEADLINE

in 21 days
View Details
NAICS: 213112
New
SLED
DS-761-270000000004-1 | Columbus Oil Turn-key Well Plug. Project Cass Cty
Solicitation # 270000000004
Direct Solicitation DS-761-270000000004 is a project issued by the Michigan Department of Environment, Great Lakes, and Energy for the turn-key plugging, abandoning, and site restoration of 22 orphan oil and gas wells located in Cass County, Michigan. The comprehensive scope of work includes site preparation such as clearing brush and setting up workover rigs, wellbore operations involving electronic logging and cementing to protect the freshwater aquifer, decommissioning of abandoned tanks, and final site restoration including the removal of flowlines and debris followed by grading and seeding. This solicitation is restricted to vendors who have been previously awarded contracts through a specific prequalification process. Key administrative requirements include a mandatory pre-bid meeting on November 4, 2026, with a final proposal deadline of November 17, 2026. Bidders must submit a project timeline based on 10-hour workdays and provide unit pricing for all items in the Schedule B Pricing Matrix, including rated items that may not be immediately necessary but are required for potential scope changes. The project is subject to a U.S. Department of Labor Davis-Bacon Project Wage Determination, which specifies hourly rates and fringe benefits for heavy construction classifications such as rig operators and cementers. Primary point of contact for the solicitation is Mary Vanostran.
Con Hall

POSTED

3 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS