Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

8665-8675 West Appian Way Single-Family DwellinQ and Retainina Walls - ZA-2023-7650-ZAD-ZAA-WDI

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at 8665-8675 West Appian Way in Los Angeles, California, involves the construction of a new single-family residence with a floor area of 2,081 square feet and a two-car garage, along with significant site grading and retaining wall modifications. The proposed dwelling will have an envelope height of 19 feet, 9 inches, and the development will include the retention of 24 existing garden walls as structural retaining walls, the construction of two new retaining walls ranging from 5 feet, 8 inches to 7 feet, 4 inches in height within the side yards, and the demolition of two existing retaining walls. Soil movement is limited to 319 cubic yards of cut and 5 cubic yards of fill, with 314 cubic yards of material exported off-site and no importation of soil. The site contains seven protected trees, all of which are to be preserved as confirmed by a certified arborist’s report, with no removals planned. The project seeks and has been granted variances from standard zoning requirements, including an exception to the maximum of two retaining walls, an increase in allowable wall height beyond the typical 6-foot hillside limit, a waiver of the 20-foot roadway width requirement, a waiver of the 20-foot paved driveway to the hillside boundary, and a waiver of the 5-foot dedication and roadway widening. All work is subject to compliance with the City of Los Angeles Landform Grading Manual, the California Building Code, the Baseline Hillside Ordinance, and the Los Angeles Fire Department’s Very High Fire Hazard Severity Zone requirements, including 200-foot brush clearance and defensible space standards. The project qualifies for a Class 3 Categorical Exemption under CEQA, meaning no full environmental impact report is required, but it must meet conditions to avoid triggering exceptions for significant environmental impact. A certified geotechnical report must be submitted and approved by the Department of Building and Safety to address potential risks of landslide and subsidence, and a traffic management plan must be approved by LADOT to mitigate construction-related disruptions. All inspections and final approvals are administered by the City of Los Angeles through its Department of Building and Safety, Department of City Planning, and Fire Department, with no federal contract clauses or procurement mechanisms applicable. The project is not a federal acquisition and contains no pricing, payment, invoicing, or contracting officer information typically associated with federal contracts; administrative oversight and compliance are managed entirely at

General Info

Constructing 2,081 sq ft single-family home with retaining walls, tree preservation, and zoning variances in Los Angeles.

Agency

California → City of Los Angeles

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

8665-8675 West Appian Way and Lookout Mountain Ave., Los Angeles, CA, 90046

Set-Aside

NONE

Documents

(1)

ZA-2023-7650-ZAD-ZAA-WDI NOE - CEQA Notice of Exemption for 8665-8675 West Appian Way

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Larry MondragonRepresentative
Dylan LawrenceCity Planning Associate

Full Description

Show more
The project includes the construction of a new single-family dwelling and two-car garage. The proposed envelope height is 19 feet, 9 inches and the proposed residential floor area is 2,081 square-feet. The applicant also proposes to retain 24 existing "garden" walls as retaining walls and proposes to construct two (2) new retaining walls measuring between 5 feet, 8 inches and 7 feet, 4 inches in height within the required side yards; the applicant also proposes to demolish two (2) existing retaining walls on-site. The project proposes 319 cubic yards of cut and five (5) cubic yards of fill; the project will export 314 cubic yards of soil and will not import any soil. There are seven (7) Protected Trees on-site per the Tree Report prepared by James Komen (Certified Master Arborist #WE-9909B) on September 21, 2024; no Protected and no non-protected trees are proposed for removal.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The project scope includes extensive upgrades and replacements such as digester gas piping and safety equipment, new access roof hatches with concrete repairs, recoating and structural repairs to all four digesters and the digester building, installation of new level measurement devices, and integration of five Owner-furnished linear generators with associated electrical systems. Additional work involves installing biogas conditioning and renewable natural gas upgrading equipment with a pipeline to the PG&E injection station, replacing the existing steam system with a hydronic heating water boiler, removing old waste gas flares and installing new enclosed flares, and demolishing the Cogen facility and related structures. The project also encompasses civil, structural, mechanical, electrical, and demolition tasks necessary to support these improvements. Bidders must be prepared to comply with the project’s set-aside requirements, which include participation from Disadvantaged Business Enterprises certified by the Department of Transportation, Minority Business Enterprises certified by NMSDC, and Women Business Enterprises certified by WBENC. Responses are to be submitted by August 20, 2026, and interested parties must email estimating@gseconstruction.com to request access to the complete project documentation via a secure link. The solicitation is open to vendors under various NAICS codes related to construction specialties and is not restricted to federal procurement standards, with the lead point of contact being Michael Demissie at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor/Construction Manager, encompasses a comprehensive suite of construction and systems integration activities critical to the modernization of the airport’s infrastructure. The scope includes demolition and abatement, building concrete retrofit, structural steel and metal stairs and railings, fire suppression systems, site paving, runway and taxiway marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems, with estimated contract values ranging from $124.2 million to $143.7 million across eleven subsystems. This bid package is structured under a Project Labor Agreement (PLA), requiring all workers to adhere to union labor standards, and mandates the use of Hensel Phelps’ standardized subcontract forms for all subcontracts. All subcontractors must provide performance bonds for contracts exceeding $100,000 and are required to submit a Workers’ Compensation Waiver of Subrogation. The work is to be performed entirely at the airport in Washington State, with bids due by August 11, 2026, and must be submitted via email to SEA-SCEBids@henselphelps.com using the official bid form provided in the Instructions To Bidders document. This solicitation is specifically reserved for Small Disadvantaged Businesses (SDB) under NAICS code 238910, with Hensel Phelps acting as an Equal Opportunity Employer and Contractor. Documentation requirements include the submission of the bid form, applicable bonds using provided templates, and strict adherence to the defined submission process, though specific performance periods, inspection criteria, payment terms, and evaluation factors are not detailed in the available materials.
Hensel Phelps

POSTED

about 6 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project will deliver a new 0.50 million gallon per day facility aimed at producing approximately 500 acre-feet of purified water annually, incorporating critical components such as a 200,000-gallon equalization tank, membrane filtration, two-stage reverse osmosis, UV/advanced oxidation, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping, and about 2,000 linear feet of HDPE conveyance pipelines. Additional scope includes groundwater recharge infrastructure comprising one injection well and two monitoring wells, along with full electrical, instrumentation, SCADA, and control systems. The solicitation targets specific NAICS codes related to construction, water and wastewater systems, chemical supply, and specialized fabrication, and is open to small businesses including Small Disadvantaged Businesses, Women-Owned Small Businesses, Disadvantaged Business Enterprises, and Minority Business Enterprises certified through NMSDC. Interested parties must contact estimating@gseconstruction.com to request secure access to all project documents prior to submitting a bid, with the response deadline set for August 11, 2026. The solicitation is managed under a set-aside designation supporting small and disadvantaged business participation, and key points of contact for inquiries are Michael Demissie and Juan Catano via their respective GSE email addresses. All technical details, scope requirements, and submission protocols are provided exclusively through the secure link issued after request, ensuring bidders have full context before preparing their proposals. The place of performance is confirmed as Pismo Beach, California, and GSE Construction Co., Inc. is acting as the lead contracting entity on behalf of the City of Pismo Beach for this municipal water advancement initiative.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
SLED
AL ROLLINS PARK ARTIFICIAL TURF BASEBALL FIELDS RFP
Solicitation # PE-75552-NONST-2026-000000066
The City of Dalton is soliciting proposals for the supply and installation of four new artificial turf baseball fields at Al Rollins Park located at 521 Threadmill Road in Dalton, Georgia. The project requires the contractor to provide and install a complete artificial turf system, including a stone base, storm drainage, nailers, artificial turf, infill, base inserts, and field striping, along with all necessary labor and materials. The City will handle preliminary site work by removing soil to sub-grade and providing a connection point for the underdrainage system, as well as installing a concrete perimeter curb for the wood nailer. The selected contractor must coordinate closely with the City to ensure proper scheduling and phasing of installation. All interested parties are required to attend a mandatory pre-proposal meeting on August 25, 2026, at 2:00 p.m. at KRH Architects Inc. in Dalton; late arrivals will not be admitted. Sealed proposals must be submitted to the City’s Finance Department by 2:00 p.m. on September 8, 2026. The City reserves the right to request additional information from proposers and may shortlist qualified firms for interviews scheduled for September 10 and 11, with notifications sent by the end of the day on September 8. The solicitation number is PE-75552-NONST-2026-000000066, and the primary point of contact is Kenneth Harless of KRH Architects.
City of Dalton

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details