The U.S. Army Corps of Engineers Detroit District, in partnership with Macomb County Public Works, is soliciting a Firm-Fixed-Price construction contract for the 9-Mile Pump Station project in St. Clair Shores, Michigan. The primary objective is to construct a new facility to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain, providing a pumping capacity of 615 cfs to reduce flood risks and protect the water quality of Lake St. Clair. The project features an 880-day period of performance and encompasses a wide range of civil, mechanical, and electrical work, including excavation, the construction of the pump station structure, installation of vertical mixed-flow impeller pumps, and the integration of backup power generators and SCADA control systems.
Key technical requirements include strict adherence to cybersecurity standards for facility-related control systems and the installation of owner-furnished equipment, such as Cummins diesel generators and paralleling switchgear. The contractor is responsible for comprehensive site restoration, environmental controls, and the delivery of detailed operation and maintenance manuals. Bids for solicitation W911XK26BA028 are due electronically by October 20, 2026, at 2:00 PM Eastern, with a public bid opening to follow at 2:30 PM Eastern via Microsoft Teams. The contract includes specific line items for mobilization, utility relocation, and natural gas services, with a stipulated value of 135,000 dollars specifically for natural gas.
General Info
US Army Corps construction contract for 9-Mile Pump Station in St. Clair Shores.
PDF, High priority: read this first15 pages · specifications
HighAI Summary for 26 29 01.00 10 - Electric Motors, 3-Phase Vertical Induction Type: Technical specifications for the design, manufacture, and delivery of 3-phase vertical induction motors for the 9 Mile Pump Station (8 1/2 Mile Relief Drain Drainage District), dated September 2026, Amendment 2. Includes detailed requirements for references, submittals, corrosion prevention, finish painting, and delivery protocols.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 9 Mile PS 102 Partial Floor Plan Area A Amendment 3: This document is Amendment 3 for the 9 Mile PS 102 project, specifically providing a partial first floor plan for Area A. It includes architectural details, scale references (1/8'=1'-0''), and references to general notes, door types, and frame schedules for the City of Orange.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 9 Mile PS 103 Partial Floor Plan Area B Amendment 3: Amendment 3 providing a partial floor plan for Area B of the 9 Mile PS 103 project. The document includes architectural layout details, general notes for floor plans, sheet keynotes for structural elements (concrete pads, bollards, ramps), and a sheet legend.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 9 Mile PS 201 Exterior Elevations Amendment 3: This document is Amendment 3 for the 9 Mile PS 201 project, specifically detailing exterior elevations. It contains technical specifications for screen walls, including scale (1/8 함께 1'-0''), total area measurements, and material details such as acrylic overflow concrete mesh and sheet metal.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 9 Mile PS 202 Exterior Elevations Amendment 3: Amendment 3 regarding exterior elevations for 9 Mile PS 202. The document contains technical drawing labels, coordinate data, and elevation markers.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 9 Mile PS 504 Opening Details Amendment 3: Amendment 3 for project 9 Mile PS 504, providing specific technical opening details including metal floor hatches, FRP doors, and screening area wall components.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 9 Mile PS FKE B-101 - Geotechnical Notes and Drawings: Technical drawing and specification sheet (B-101) for the 9 Mile project, detailing open-cut slopes, diversion channels, screen chambers, and general geotechnical notes regarding steel grades (A992, A572), pipe materials (ASTM A580), and excavation safety requirements.
PDF
PDF, High priority: read this first30 pages · specifications
HighAI Summary for 9 Mile Pump Station - Cybersecurity for Facility-Related Control Systems (SCADA): Technical specification section 25 05 11.01 for the 8 1/2 Mile Relief Drain Drainage District's 9 Mile Pump Station project (October 2026, Amendment 4). This document defines cybersecurity requirements for SCADA control systems, referencing NIST, IEEE, and DoD standards, and provides detailed definitions for network connectivity and user account support levels.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 9 Mile Pump Station - Panel Schedules (200-16347-21002): Technical electrical panel schedules for the 9 Mile Pump Station project (200-16347-21002). The document details circuit descriptions, loads, and breaker specifications for equipment including emergency lighting, battery chargers, SCADA panels, and HMCPS panels.
PDF
PDF, High priority: read this first3 pages · sow
HighAI Summary for 9 Mile Pump Station - Section 01 11 00 Summary of Work: Section 01 11 00 Summary of Work for the 9 Mile Pump Station project in St. Clair Shores, MI, dated October 2026 (Amendment 4). The document outlines the project scope, including providing 615 cfs pumping capacity, backup power generators, and related electrical/mechanical work. It details requirements for underground utility location, government-furnished equipment, maintenance of flow for the 9 Mile Drain Emergency Bypass, and permit responsibilities.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 01 20 00 Price and Payment Procedures: This document is Section 01 20 00 (Price and Payment Procedures) for the 9 Mile Pump Station project for the 8 1/2 Mile Relief Drain Drainage District in St. Clair Shores, MI. Dated September 2026 (Amendment 3), it outlines the requirements for contract cost breakdowns, submittals, defect assessment, and detailed payment items (CLINs) including mobilization, excavation, pump station structure, and electrical components.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 01 35 13 Special Project Procedures: Technical specifications for Special Project Procedures (Section 01 35 13) for the 9 Mile Pump Station project in St. Clair Shores, MI, dated September 2026 (Amendment 3). The document outlines required submittals, comprehensive insurance requirements (including Workers' Compensation, General Liability, and Umbrella coverage), and procedures for severe weather time extensions based on historical NOAA data.
PDF
PDF, High priority: read this first31 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 01 57 19 Temporary Environmental Controls: Technical specifications for Temporary Environmental Controls (Section 01 57 19) for the 9 Mile Pump Station project in St. Clair Shores, MI. This document, dated October 2026 (Amendment 4), outlines regulatory references (NFPA, EPA, CFR, WAC) and provides detailed definitions for hazardous materials, waste, and environmental protection standards required during construction.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 01 64 00 Installation of Owner-Furnished Equipment: Technical specifications for the installation of owner-furnished equipment at the 9 Mile Pump Station, St. Clair Shores, MI. This document (Amendment 3, September 2026) details the requirements for transporting, installing, and testing equipment including four Cummins diesel generators, paralleling switchgear, a precast valve vault, watermain materials, and a stop gate/log, as well as PLC programming and SCADA integration.
PDF
PDF, High priority: read this first57 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 03 30 00 Cast-in-Place Concrete: Technical specifications for Cast-in-Place Concrete (Section 03 30 00) for the 9 Mile Pump Station project, 8 1/2 Mile Relief Drain Drainage District, St. Clair Shores, MI. This document, dated September 2026 (Amendment 2), provides a comprehensive list of reference standards from ACI, AWS, and ASTM regarding concrete materials, testing, and construction tolerances.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 05 51 33 Metal Ladders: Technical specifications for metal ladders for the 8 1/2 Mile Relief Drain Drainage District's 9 Mile Pump Station project. Dated September 2026 (Amendment 2), the document details material requirements (aluminum alloy), fabrication standards (ALI, AWS, ASTM), safety device requirements per 29 CFR 1910.23, and installation execution guidelines.
PDF
PDF, High priority: read this first11 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 08 41 13 Aluminum-Framed Entrances and Storefronts: Technical specifications for aluminum-framed entrances and storefronts for the 9 Mile Pump Station project (8 1/2 Mile Relief Drain Drainage District), dated September 2026, Amendment 2. The document details reference standards (ASTM, AAMA, UL), administrative requirements, required submittals, quality control qualifications, and warranty terms.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 08 60 45 Skylights and Translucent Panels: Technical specifications for skylights and translucent panels for the 9 Mile Pump Station project (8 1/2 Mile Relief Drain Drainage District), dated September 2026, Amendment 3. The document details material requirements, ASTM and NFRC performance standards, submittal requirements, quality assurance, and warranty terms for light transmitting plastics.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for 9 Mile Pump Station - Section 26 29 23 Variable Frequency (VFD) Systems: Technical specifications for Variable Frequency (VFD) Systems for the 8 1/2 Mile Relief Drain Drainage District's 9 Mile Pump Station in St. Clair Shores, MI. This document, dated September 2026 (Amendment 2), details reference standards (IEEE, NEMA, NFPA, UL), performance requirements for electromagnetic interference and surge protection, and comprehensive submittal requirements including shop drawings, product data, and test reports.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 9 Mile Switchgear One Line Diagram: Technical one-line diagram and component list for 9 Mile Switchgear, detailing primary and secondary circuit breakers and specific amperage/voltage ratings (100A 120V AC).
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for A-110 Overall Roof Plan - 9 Mile PS: Technical drawing sheet A-110 for the 9 Mile PS project, issued by the US Army Corps of Engineers. The document provides an overall roof plan including general notes on roofing system repairs, sheet keynotes for materials (R-11 roof deck, thermal insulation), and equipment details such as roof hatches and RTUs.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for A-301 Building Sections - 9 Mile PS: Architectural drawing sheet A-301 containing longitudinal building sections for Area A and Area B, including sheet keynotes, scale specifications, and square footage calculations for skylights and livable areas. Document is associated with project SCE-2019-001.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for A_302 Building Section 1 - 9 Mile PS: Architectural drawing sheet (A-302) for the 9 Mile PS project by the US Army Corps of Engineers. The document contains detailed keynotes for building sections, including materials for precast concrete, roofing systems, and structural components for the pump and electrical rooms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for A 9 Mile PS 501 Details Amendment 3: This document is Amendment 3 for the 9 Mile PS 501 project, specifically providing technical roof system details. It includes specifications for wall corner details, expansion joints, roof hatch details, and various roof system configurations (RS-1 through RS-10), including walkway pad details.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for A 9 Mile PS 601 Schedules and Details Amendment 3: Amendment 3 for project A 9 Mile PS 601, containing technical schedules including door, hatch, cutawall, glazing, and finish schedules, as well as lighting fixture details and scale notes for USACE.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for Appendix B - Programming Sole Source Scope of Work: This document outlines the technical scope of work for sole-source programming services for a pump station. Key requirements include the setup of I/O and WAN networks, PLC programming for storm pumps, drain pump stations, and influent gates, and SCADA system integration. It specifies the need for process control narratives (PCN), cybersecurity compliance, and the delivery of training sessions for the Owner, Engineer, and USACE.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for E 402 Building Plans - Power East: Technical specifications and wiring notes for the Power East building plans, specifically detailing SCADA panel interface cables (C2-CA12), NEMA 4X connectors, and fiber optic cabling requirements.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for EI602 9 Mile Switchgear and Pump Motor Starters: Technical specifications and general sheet notes for the 9 Mile Switchgear and Pump Motor Starters. The document outlines requirements for hardware mounting, programming by the owner/operator, configuration settings for motor protection (Type A or B) for stormwater pumps, and integration with Turbocharged Systems based on 2005 engineering drawings. It specifically references stormwater pumps 1 through 10 and Compactology I/O cards.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for MY501 - 9 Mile Pump Station Standard Details: Technical drawing and standard details for the 9 Mile Pump Station project (Eight and One-Half Mile Relief Drain Drainage District) for the US Army Corps of Engineers, Detroit District. Dated July 8, 2026, with an amendment dated September 11, 2026. Includes detailed specifications for casing pipe, pipe sleeves in walls and floors, and adjustable stanchion pipe supports.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for MY601_ADD3 - Pump and Pipe Schedules: Technical specifications document containing detailed pump and pipe schedules for the 9 Mile Pump Station and Drain Pump Station. Includes equipment data such as GPM, RPM, motor HP, and material specifications for piping (DIP, PVC, CPVC, FRP) and valve joints.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for S-023 Typ. Access Hatch Improvement: Technical drawing/specification document S-023 from the US Army Corps of Engineers detailing typical access hatch improvements, including epoxy downbars and concrete cube/diversion wall details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for S_9_MILE_PS_S_001 - Structural General Notes: Structural general notes and specifications for a US Army Corps of Engineers project. The document includes structural abbreviations, foundation requirements, allowable bearing pressures, and references to a geotechnical report dated June 25, 2025. It outlines contractor responsibilities for field verification, shop drawings, and soil conditions.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for S_9_MILE_PS_S_011 - Utility Relocation Section: Technical specifications and requirements for the Utility Relocation Section of the Nine Mile Drain project. The document outlines contractor responsibilities for temporary support of electrical, plumbing, and water elements, and provides specific demolition and saw-cut instructions for existing basin walls and slabs (RTB-40, RTB-41) under the US Army Corps of Engineers.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for S_9_MILE_PS_S_014 - Structural Plan Sheet: Technical drawing/plan sheet containing structural data, plan notes, and a legend for joint types and points of intersection. It references general notes and structural details found in sheets S-00 through S-00'S and the S-00'S series.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for S_9_MILE_PS_S_401 - Platform Framing and Foundation Plans: Technical drawing and plan notes for pump equipment concrete foundations and platform framing. Includes details on hot-dip galvanized steel, baseplates, and specific foundation requirements (K5-K19) for pump equipment.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for S_9_MILE_PS_S_505 - Steel Connection Details: Technical drawing specifications and detail sheets for steel connections, including base plate details, beam-to-beam shear connections, railing spot spacing, and anchor rod requirements (ASTM-F155 Grade 55). Includes minimum connection design strength tables and specific detail callouts (A1-A4, F1-F8).
PDF
PDF, High priority: read this first33 pages · specifications
HighAI Summary for Section 35 45 01 - Vertical Pumps, Mixed-Flow Impeller-Type: Technical specifications for Vertical Pumps, Mixed-Flow Impeller-Type (Section 35 45 01), dated 02/21 with Change 3 from 08/23. The document outlines comprehensive reference standards from API, ASME, AWWA, AWS, ASTM, HI, ISO, and USACE, and defines required submittals including shop drawings, product data, and pump curves.
PDF
PDF, High priority: read this first32 pages · specifications
HighAI Summary for Section 35 45 01 - Vertical Pumps, Mixed-Flow Impeller-Type: Technical specifications for vertical pumps with mixed-flow impellers for the 9 Mile Pump Station project (8 1/2 Mile Relief Drain Drainage District, St. Clair Shores, MI). This document, dated October 2026 (Amendment 4), details industry standards (API, ASME, AWWA, ASTM, HI, ISO), required submittals (shop drawings, product data, test reports), and quality assurance requirements for installation and engineering.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Section 46 10 20 - Baffles: Technical specifications for the fabrication, production, and installation of diversion and baffle walls. The document details material requirements (fiberglass-reinforced polyester, stainless steel), physical property standards (AWWA, ASTM), submittal requirements including PE-sealed shop drawings, and execution guidelines for installation and field quality control.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Solicitation Amendment 0005 - W911XK26BA028: Solicitation Amendment 0005 for solicitation W911XK26BA028, issued by the W072 ENDIST DETROIT contracting office with an effective date of 14 OCT 2026. The document serves to modify the solicitation and provides instructions for offerors to acknowledge receipt of the amendment.
PDF
PDF, High priority: read this first6 pages · amendment
HighAI Summary for Solicitation W911XK26BA028 Amendment 0004: Amendment 0004 to solicitation W911XK26BA028 for the 9-Mile Pump Station, dated October 7, 2026. The amendment provides government responses to RFIs, updates temporary easements and specifications, and extends the bid due date from October 15, 2026, to October 20, 2026, at 2:00 PM Eastern. It also updates the bid opening procedures and schedule.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Storm Pump No 3 & 4 Wiring Diagram: Technical one-line wiring diagram for Storm Water Pumps 3 and 4, detailing electrical components including a 200A bus, variable frequency drive, motor starter circuits, and fusible breaker contacts.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for USACE 9 Mile Drain Schematic Drafting Plans: Draft plans and schematic drawings from the US Army Corps of Engineers (ECCDIV) regarding the 9 Mile Drain. The document includes a detail draft schedule for duct banks, references to geotechnical drawings for drilled piers, and layout details for water treatment equipment buildings, pump rooms, and electrical rooms.
PDF
PDF, High priority: read this first8 pages · amendment
HighAI Summary for W911XK26BA028 Amendment 0002 - 9 Mile Pump Station: Amendment 0002 to solicitation W911XK26BA028 for the 9 Mile Pump Station, effective September 18, 2026. This amendment extends the bid due date from September 25, 2026, to October 2, 2026, at 2:00pm ET. It provides revised plans and specifications, including updates to multiple drawing sheets (S-011, S-012, S-014, A-110, MY-006, MY-501, E-402, E-603, E-608, E-611) and replaces specification sections 05 51 33 (Metal Ladders) and 08 41 13 (Aluminum-Framed Entrances and Storefronts) based on government responses to RFIs.
PDF
PDF, High priority: read this first11 pages · amendment
HighAI Summary for W911XK26BA028 Amendment 0003 - 9-Mile Pump Station: Amendment 0003 to solicitation W911XK26BA028 for the 9-Mile Pump Station, effective September 24, 2026. Key changes include updated Bid Schedule CLIN descriptions, revised Plans and Specifications, and the addition of Appendix B for integration scope. The bid due date and opening have been extended from October 2, 2026, to October 15, 2026, at 2:00 PM Eastern. The document includes a revised Bid Schedule with CLINs for mobilization, excavation, pump station structure, and various mechanical/electrical components.
PDF
PDF, Low priorityabstract-of-bids
LowAI Summary for Abstract of Bids - 9 Mile Pump Station (W911XK26BA028): An Abstract of Bids for the 9-Mile Pump Station project (Solicitation W911XK26BA028), issued by the US Army Corps of Engineers Detroit District. The document records bids from Z Contractors Inc, Thalle Construction Co Inc, and BURROW Global JV LLC, with total bid amounts ranging from $70,155,338.00 to $81,605,000.00. It includes a breakdown of CLINs for mobilization, excavation, pump station structure, and electrical/mechanical components. Certified by Contracting Officer Lisa M. May on 2026-10-22.
PDF
PDF, Low priority1 page · other
LowAI Summary for MY006_ADD2: The document content is corrupted or contains repetitive, nonsensical text strings and fragmented data, making it unreadable and impossible to determine its specific procurement purpose.
PDF
PDF, Low priority1 page · other
LowAI Summary for S_9_MILE_PS_S_302.pdf: The provided document content consists of fragmented tables containing alphanumeric strings and components without any discernible procurement context, solicitation language, or administrative data. It appears to be unreadable or non-functional procurement data.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Temporary Work Area Easement - 8 1/2 Mile Relief Drainage District: A temporary work area easement agreement dated July 7, 2026, between Shore Club Apartments, L.L.C. and St. Clair Land Development, L.L.C. (Grantors) and the 8 1/2 Mile Relief Drainage District (Grantee). The easement grants the Grantee right of entry for a period not to exceed five years to install geotechnical and vibration monitoring devices required by the U.S. Army Corps of Engineers for the 9 Mile Pump Station Project in St. Clair Shores, Macomb County, MI.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
6 updates
PhaseClosed
Posted
Presolicitation
Type Changed
Presolicitation → Solicitation
Notice updated
Response deadline changed from Sep 17, 2026 to Sep 25, 2026. The notice description changed.
Notice updated
Response deadline changed from Sep 25, 2026 to Oct 2, 2026. The notice description changed.
Notice updated
Response deadline changed from Oct 2, 2026 to Oct 15, 2026. The notice description changed.
Notice updated
Response deadline changed from Oct 15, 2026 to Oct 20, 2026. The notice description changed.
Notice updated
The notice description changed.
Response Deadline
Deadline has passed
Notice updated
The notice description changed.
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Abstract is posted. ****Amendment 0005 is being issued on October 14, 2026. The bid due date will remain October 20, 2026 at 2:00pm (Eastern) with corresponding bid opening at 2:30 PM (Eastern) the day bids are due. ****Amendment 0004 is being issued on October 7, 2026. Bid due date is extended to October 20, 2026 at 2:00pm (ET)****Amendment 0003 is being issued on September 24, 2026. The bid inquiry is reopen until October 01, 2026. ***Amendment 0002 is being issued on September 18, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment.**** ***Amendment 0001 is being issued on September 11, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment. *** The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.
More opportunities from Department Of Defense → W072 Endist Detroit