Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on November 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

911 - Clay City Mason Tower - SM

Closed
25-493ISP-OPERA-B-45611State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and coordinating professional engineering and laboratory services for geotechnical design and roadway materials testing. The project includes rigorous material characterization tests such as California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 3 hours ago

DEADLINE

in 3 months
NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Dalton Utilities

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

Documents

4
PDF, High priority: read this firstsow
High
DOCX, Low prioritycertifications
Low
PDF, Low prioritycontract-document
Low
DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Dec 9, 2024 to Dec 2, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois State Police
Contacts1 person available
OfficeN/A
Organization / AgencyIllinois State Police
Office AddressN/A

Full Description

Show more
ISP is seeking bids to remove one (1) 8-foot 2Ghz microwave dish at the Clay City, IL Tower site and install a new flat panel antenna where the old dish was located.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS