Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on June 16, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

99 -- Nacimiento Copper Mine Site Operable Unit 2

Closed
R3-NacimientoMineFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 924110
New
SLED
Buzzards Bay Watershed Infrastructure and CCMP Support Grant Program FY2027
Solicitation # BD-27-1042-CZM-ENV40-134574
The Buzzards Bay Watershed Infrastructure and CCMP Support Grant Program for FY2027 is a solicitation issued by the Massachusetts Executive Office of Energy and Environmental Affairs, specifically through Coastal Zone Management. The program provides financial and technical resources to municipalities for projects that protect and restore water quality and living resources within the Buzzards Bay watershed. To be eligible, projects must implement recommendations from the Comprehensive Conservation and Management Plan and fall within one of ten eligible grant categories, such as wetland restoration, nutrient removal retrofits, and stormwater facility design or construction. A total pool of 748,001 USD in federal funding from the Infrastructure Investment and Jobs Act is available, with individual awards capped at 375,000 USD for approximately three to six selected projects. Applications must be submitted electronically via the EEA Grant Management System by December 8, 2026. Proposals are evaluated on a competitive basis, with scoring focused on the degree of environmental impairment, priority category, climate resilience, and alignment with Commonwealth Environmental Justice goals. Municipalities must be compliant with the MBTA Communities Law to be eligible. The anticipated contract period begins in February 2027 and ends on December 31, 2027, with potential extensions to June 30, 2028. Funding is provided on a reimbursement basis, and all projects must comply with the Build America, Buy America Act, requiring the use of domestically produced iron, steel, and construction materials.
CZM - Coastal Zone Management

POSTED

1 day ago

DEADLINE

in about 2 months
NAICS: 924110
SLED
FY2027 DCR Watershed System Salt Reduction Grant
Solicitation # BD-27-1020-DCRCU-DC250-134375
The FY2027 DCR Watershed System Salt Reduction Grant, solicitation number BD-27-1020-DCRCU-DC250-134375, is issued by the Massachusetts Department of Conservation and Recreation, Division of Water Supply Protection. This grant program provides funding to 18 specific municipalities within the Wachusett Reservoir, Quabbin Reservoir, and Ware River watershed boundaries that maintain more than ten miles of town roads. The primary objective is to protect drinking water and infrastructure by supporting the implementation of efficient salt use reduction strategies. Total available funding is up to 100,000 dollars, with individual communities eligible to request a maximum of 20,000 dollars. These are matching grants requiring a minimum 50 percent cash match from the proponent. Eligible projects focus on technology and equipment upgrades with a useful life of at least five years and a per-unit cost of 1,000 dollars or more, such as pavement temperature sensors, calibrated salt application equipment, flexible plow blades, and salt pile containment materials. Ineligible expenses include new vehicles, road salt, alternative anti-icing materials, and employee training. Awarded grantees must provide salt application data for the 2026-2027 season and the following three winters to document project impacts. The period of performance begins November 2, 2026, and ends June 30, 2027. Applications must be submitted electronically via the COMMBUYS portal or email by October 23, 2026. Proposals are evaluated on a competitive basis, and final reimbursement is contingent upon a satisfactory project review and the submission of a final report and close-out form.
DCRCU - DCR CONTRACTS UNIT

POSTED

7 days ago

DEADLINE

in 3 days
NAICS: 924110
Grant
Solid Waste Management Grant Program
Solicitation # SWMFY27
The Solid Waste Management Grant Program, administered by the USDA Rural Utilities Service, provides approximately 4,000,000 dollars in funding for fiscal year 2027 to assist rural communities in improving the planning and management of solid waste sites. The program focuses on providing technical assistance and training to reduce waste streams through recycling and reuse, enhance landfill operator skills, develop closure and future land use plans, and evaluate threats to water resources. Specific priorities include addressing emerging contaminants such as PFAS and promoting the collection of hazardous materials like pharmaceuticals and electronics. The performance period for these awards runs from October 1, 2027, to September 30, 2028. Eligible nonprofit organizations must submit applications via grants.gov by December 31, 2026. A complete submission requires an SF-424, SF-424A, a project proposal limited to 20 pages, organizational documents, a recent audit, and a Certificate of Good Standing. The total application package is capped at 50 pages, excluding audits. Applications are scored competitively based on applicant status, target area population, the quality of assistance provided, evaluation methods, and matching funds. Grant funds are strictly prohibited from being used for construction, purchasing real estate or vehicles, lobbying, or duplicating services provided by other federal programs, such as those under the National Forest-Dependent Rural Communities Economic Diversification Act of 1990.
Rural Utilities Service

POSTED

20 days ago

DEADLINE

in 2 months
NAICS: 924110
SLED
New Hampshire Clean Diesel Program
Solicitation # DES 2026-10
The New Hampshire Clean Diesel Program, administered by the Department of Environmental Services, is a solicitation for competitive grant applications to fund diesel emissions reduction projects within the state. With approximately 1,000,000 dollars available, the program operates on a rolling monthly basis to provide partial reimbursement for eligible projects. Eligible activities include the installation of EPA-certified remanufacture systems, EPA-verified idle reduction technologies, aerodynamic technologies, and low rolling resistance tires. A critical requirement for replacement projects is the permanent scrappage of old diesel units, which must be disabled by drilling a three-inch hole in the engine block and cutting through the frame rails. Additionally, electric vehicle supply equipment and certain idle reduction technologies must comply with Build America, Buy America sourcing requirements. Applications are evaluated using a 100-point scoring system, with bonus points available for alternative fuel use and projects benefiting priority New Hampshire communities. Non-profit and private entities must first pass a preliminary assessment by achieving a minimum impact score of four out of five regarding public and economic benefits. Because this is a partial reimbursement program, awardees must cover all project costs upfront and provide proof of payment to receive funds. Once awarded, replacement units must remain in service for at least five years to avoid potential reimbursement of the grant to the state. Recipients are also subject to a reporting schedule consisting of quarterly reports for two years followed by three annual reports.
Department Of Environmental Services

POSTED

21 days ago

DEADLINE

in 11 months
NAICS: 924110
International
Whitehorse National Air Pollution Surveillance Program Monitoring and Data Management Support
Solicitation # RFP-2026-8-5553
The Government of Yukon, through the Environmental Protection and Assessment Branch, is seeking experienced proponents to provide technical services for the operation and data management of the Whitehorse National Air Pollution Surveillance (NAPS) station. The contract consists of an initial one-year term with options to renew for two additional years, for a maximum duration of three years covering the period from 2026 to 2029. The scope of work includes both in-person and remote support, specifically focusing on the routine operation, maintenance, and calibration of air quality analyzers, annual station visits, and continuous data and alerts review. All work must be performed using the Envidas software suite and adhere to the Ambient Air Monitoring and Quality Assurance/Quality Control Guidelines of the NAPS program, with data reporting conducted under the Canadian Council for Ministers of Environment’s Air Quality Management System. The solicitation follows a value-driven, two-envelope submission process where proposals are evaluated based on a 100-point scale, consisting of a technical submission worth 55 points and a price and Yukon First Nation (YFN) submission worth 45 points. To be considered acceptable, proponents must meet minimum technical thresholds, including at least 60 percent on individual criteria and 80 percent for project team experience. The evaluation incorporates Bid Value Reductions to favor YFN business ownership, location, and labor. Awarded contractors must provide proof of insurance and a Letter of Compliance from the Yukon Workers’ Safety and Compensation Board. Invoicing is required quarterly or within 15 days of contract completion.
Government of Yukon

POSTED

21 days ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Nacimiento Copper Mine Site Operable Unit 2 project in Sandoval County, New Mexico, aims to remediate the Agua Zarca aquifer, which was contaminated by sulfuric and ferric acid used during copper extraction in the 1980s. The remedial action involves pumping up to 120 gallons per minute of contaminated groundwater through nine new extraction wells and one monitoring well. This water will be processed using a semi-passive alcohol-enhanced bioreactor system (SPAEBS) to remove heavy metals and adjust pH levels to meet New Mexico state groundwater and surface water standards. The required infrastructure includes a groundwater extraction system with storage tanks and supply pumps, a SPAEBS featuring a lined settling pond, a lined bioreactor, and sodium hydroxide, ethanol, and nitrogen feed systems. Treated effluent will be released through a limestone-lined discharge channel armored with riprap to prevent erosion. The contract covers the installation of these systems and includes one year of operation and maintenance with three additional option years.

General Info

Agency

N/A

NAICS

924110 - Administration of Air and Water Resource and Solid Waste Management Programs

Place of Performance

The Nacimiento Copper Mine Site Operable Unit 2 is located in Sandoval County, 3.5 miles southeast of Cuba in northwest New Mex

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Scott T BrownContract Specialist
Joan R GallagherProcurement Technician

Full Description

Show more
The Nacimiento Copper Mine Site Operable Unit 2 is located in Sandoval County, 3.5 miles southeast of Cuba in northwest New Mexico on State Highway 126. In the 1980s, over 250,000 gallons of sulfuric and ferric acid was injected into the Agua Zarca aquifer to extract cooper. The acid was left in place resulting in the average pH of 3.59 and heavy metals above New Mexico State standards. This remedial action will pump contaminated ground water from the aquifer, surface treat it and release it into an unnamed channel. The project will pump up to 120 gallons per minute of groundwater via a series of new extraction wells to the surface. This water shall be treated using a semi-passive alcohol-enhanced bioreactor system (SPAEBS). The SPAEBS will utilize biological cultures to remove metals to the more stringent of New Mexico applicable groundwater and surface water standards. The treated water shall be discharged through an engineered drainage channel armored with riprap to prevent erosion and sediment transport and to provide aeration to surface water drainage. The main components of the required system are as follows: GROUND WATER EXTRACTION SYSTEM - X Nine extraction wells - X One new monitoring well - X Two 3,000 gallon above ground storage tanks - X Supply pumps - X Level control alarm system - X Piping from the extraction wells to the storage tanks and to the SPAEBS - X Supply pumps SPAEBS - X Sodium hydroxide feed system, including 3,000 gallon tank and two metering pumps - X Lined settling pond, 15 feet deep - 140 long and 100 feet wide - X Ethanol feed system, including 3,000 gallon tank - X Nitrogen feed shed - X Lined bioreactor - 15 feet deep, 70 feet long and 200 feet wide - X Recycle loop, including piping and recycle pump - X Chemical supply alarm system EFFLUENT DISCHARGE SYSTEM - X Discharge pipe - X Limestone lined discharge channel The operation and maintenance of this system for one year, with three option years is included.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS