Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 10, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--A-E IDIQ STRUCTURAL ENGINEERING ARCHITECT-ENGINEER SERVICES, SMALL-BUSINESS SET ASIDE, PROJECTS AT VARIOUS LOCATIONS, BUT NOT LIMITED TO, CALIFORNIA, ARIZONA, COLORADO, NEVADA, NEW MEXICO, AND UTAH

Awarded
N6247314R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 15 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 17 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This total Small Business Set-Aside is a firm fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Structural Engineering services supporting Navy and Marine Corps facilities within the NAVFAC Southwest Area of Responsibility, covering California, Arizona, Nevada, Colorado, New Mexico, and Utah, with a primary focus on Southern and Central California. The contract has a maximum aggregate value of $10,000,000 and a minimum guarantee of $5,000. It consists of a one-year base period with four subsequent option periods. Individual task orders are capped at $3,500,000, though most are expected to be under $500,000. The prime contractor must self-perform at least 50 percent of the contract cost and is prohibited from providing construction services for any project they design under this agreement. Primary services include the preparation of Design-Build RFP packages, fully designed plans, structural investigations, antiterrorism blast analysis, and innovative seismic designs. Secondary services encompass planning documents like DD Form 1391, technical reviews, and construction contract support. Selection is conducted under the Brooks Act, evaluating firms based on professional qualifications, specialized experience, capacity, past performance, local knowledge, quality control, and volume of DOD work. Key personnel requirements include at least three registered professional Civil or Structural Engineers on the prime firm's staff, with the Lead Structural Engineer specifically requiring registration in California or a state with equivalent testing standards.

General Info

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

6

SF 330 Architect-Engineer Qualifications

PDF, High priority: read this firstsow
High

Structural AE IDIQ SB Set Aside - N62473-14-R-0007

PDF, High priority: read this firstrfp
High

NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0)

DOCX, Low priority4 pages · past-performance
Low

RFI Responses N62473-14-R-0007 - March 17

PDF, Low priorityq-and-a
Low

RFI Responses - N62473-14-R-0007 Structural Architect-Engineer Services

PDF, Low priorityq-and-a
Low

RFI Responses N62473-14-R-0007 - Structural Architect-Engineer Services

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Southwest
Contacts2 people available
OfficeSAN DIEGO, CA, 92132-0001, USA
Office AddressSAN DIEGO, CA, 92132-0001, USA
Contacts
Elliott PenetranteContract Specialist
Hal W HayesContract Specialist

Full Description

Show more
This is a total Small Business Set-Aside. Architect-Engineer (A-E) services are required for a firm fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Structural Engineering Services. The work for this contract shall occur at various Navy and Marine Corps facilities and other military installations located in the NAVFAC Southwest Area of Responsibility (AOR): California, Arizona, Nevada, Colorado, New Mexico and Utah. The preponderance of work will be in Southern and Central California. The Offeror/Contractor must demonstrate adequate in-house staffing capable to self-perform at least 50 percent of the cost of the contract as required by FAR Clause 52.219-14 (b)(1) Limitation on Subcontracting. A-E Design and Engineering Services shall mainly provide for, but not be limited to, STRUCTURAL ENGINEERING related facilities. Structural engineering services may involve many types of buildings and structures of various sizes and configurations, as well as high bay structures, long span structures, containment vessels (tanks), weight handling equipment, retaining structures, towers, and bridges. Primary Structural Engineering A-E services are required for preparing: Requests for Proposals (RFP) packages for Design-Build projects; fully designed plans and specifications; structural investigations, studies, evaluations, and recommendations for upgrade of existing facilities; antiterrorism design related to analysis of blast effects and design to prevent progressive collapse; innovative structural system design including seismic base isolation, seismic damping, passive dissipating systems and use of fiber reinforced polymers; and other structural engineering services. Secondary A-E services may be required for: preparation of DD Form 1391 or similar planning and programming related documents; technical reviews of Government prepared RFP packages for Design-Build projects and Government prepared design documents; and construction contract support services (CCSS) or post-construction award services (PCAS). Support services may include: topographic surveying; geotechnical engineering; cost estimating; material testing; corrosion testing; and identification and abatement methods of existing asbestos containing materials, lead-based paint, and other hazardous materials. The maximum contract value may not exceed $10,000,000 aggregate total. The minimum guarantee for the contract shall be $5,000. The minimum guarantee for the entire contract term (including option years) will be satisfied by the award of the initial task order. The maximum value of individual task orders executed under this contract is $3,500,000; however, the preponderance of task orders will be less than $500,000. There will be no dollar limit per year. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. Contract term is for a one-year base period with four option periods. Each performance period will run 365 (366 for leap year) calendar days. The hourly rates will be negotiated for each performance period. The Government may exercise the option period unilaterally. Per NFAS 17.208-100(c)(1), options for post construction award services may be negotiated on individual task orders for unilateral exercise. The estimated start date is October 2014. The NAICS Code for this procurement is 541330 (Engineering Services) and the annual small business size standard is $14 Million. The Government makes no representation as to the number of task orders or the actual amount of work to be ordered. The contractor is not guaranteed work in excess of the minimum guarantee. Firms that design or prepare specifications for a construction contract or task order issued under the resulting contract are prohibited from providing the subsequent construction. This limitation also applies to subsidiaries/affiliates of the firm. SELECTION CRITERIA AND SUBMITTAL REQUIREMENTS: Brooks Act (PL 92-582) and Federal Acquisition Regulations (FAR) Part 36.6 selection procedures apply. The evaluation and selection will be based on the following criteria: Criterion 1, Professional Qualifications; Criterion 2, Specialized Experience and Technical Competence; Criterion 3, Capacity; Criterion 4, Past Performance; Criterion 5, Location and Knowledge of the Locality; Criterion 6, Quality Control; and Criterion 7, Volume of Work. SF330s will be evaluated to determine the most highly qualified firm based on criterion responses. Criteria 1 and 2 are considered most important and equal among themselves; Criteria 3, 4, 5, and 6 are slightly less important and listed in descending order of importance; and Criteria 7 is of lesser importance and will be used as tiebreaker among technically equal firms. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. In evaluating an Offeror’s capability, the Government shall consider how well the Offeror complied with these instructions. All projects provided in the SF330 (Architect-Engineer Qualifications) must be completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration. Submission Requirements: The SF330 Part 1 is limited to 30, 8.5?x11? single-sided pages. Minimum font size is 10. Submit the following: a) One (1) original and two (2) copies of the SF330 for the prime Offeror (which also includes a completed Part II for the firm and key subcontractors) addressing the following selection criterion information; and b) one compact disk copy, in Adobe Acrobat format, of the complete SF330 being submitted by the firm. The organization chart, A-E Contractor Appraisal Support System (ACASS) and Past Performance Questionnaire (PPQ) evaluations shall not be counted as part of the 30 page limitation. SF330, Part 1, Section B: Contract Information: In Block 5, list firm’s Dun and Bradstreet Number in addition to the name of the firm. SF330, Part 1, Section D: Organization Chart: In addition to the Instructions provided for the SF330, (i.e. the names and roles of all key personnel in this contract/solicitation and the firm they are associated with), identify the overall relationship and lines of authority of the proposed team, including key subcontractors. (Note: All individuals listed on the organization chart are not required to have a resume in Section E, such as administrative or lower level engineering positions, or individuals not providing primary structural engineering services.) This chart shall not be counted as part of the 30 page limitation. This chart must be affixed to the submittal to avoid separation in handling. SF330, Part 1, Section E, Resumes of Key Personnel, CRITERION 1, PROFESSIONAL QUALIFICATIONS: Professional qualifications of the proposed team members assigned to this contract in preparation of the required primary and secondary structural engineering services shall be evaluated. The evaluation will place more emphasis on qualifications in primary structural engineering services. The evaluation will take into account education, active professional registration(s), and the experience of the design team members. All key personnel must be professionally registered/accredited in their discipline. Key personnel shall include a minimum of three (3) registered professional Civil and/or Structural Engineers on staff of the prime A-E firm to perform the work anticipated under this contract. The Project Lead and Design Quality Control manager shall be registered Civil or Structural Engineers and members of the prime A-E firm. The Lead Structural Engineer shall also be a member of the prime A-E firm, and shall be a registered Structural Engineer (SE) in the state of California or other state which requires 16 hours of structural engineering testing for registration as an SE. Projects completed in California may be considered more favorably in the evaluation process. Submission Requirements: Provide brief resumes of each proposed team member who will specifically perform the structural engineering services listed above for this contract. Resumes of personnel performing only secondary or support services (as listed above) or providing other than structural engineering services are not required and will not be reviewed. All key personnel must include the state, license number and the expiration date of their professional registration(s). Provide the level of education achieved and the number of years engaged in the discipline. Identify the Project Lead (project manager and main point of contact) and Lead Structural Engineer for the contract. Identify the key personnel responsible for the Design Quality Control (QC) program. Resumes for these key personnel shall demonstrate relevant qualifications/credentials and experience in their respective roles. Each resume shall include a maximum of five (5) specific, recently completed projects that best illustrate the individual member’s qualifications in performing the listed primary and secondary structural engineering services. Provide the month and year of completion of professional services for each project. Submit a brief description of the project within block 19 of the SF330, Section E requirement. Submit projects in which the key personnel performed a significant role. In addition, address key elements for each project by describing: 1) The role and responsibilities of the individual in the project; and 2) The specific structural engineering services performed by the individual in the project. A “specific project? is a single project/function contract or a single task order under an Indefinite Delivery Indefinite Quantity or On-Call type Contract. “Recent? is defined as professional services completed within the past five years prior to the SF330 due date (February 2009 or later for purposes of this synopsis). Projects must be complete as of the SF330 due date. “Completion? is defined as the date that the study/investigation was completed and submitted, or the date that the final design or design-build package was completed. Projects not meeting these requirements will not be considered. SF330, Part 1, Section F, Example Projects, CRITERION 2, SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: Specialized experience and technical competence of the proposed team members in the preparation of the required primary and secondary structural engineering services shall be evaluated. The evaluation will place more emphasis on experience in primary services. Projects completed by the prime A-E firm identified in Part I may be given more consideration in the evaluation process than projects of proposed subcontractors. Projects completed in California may be considered more favorably in the evaluation process. Submission Requirements: For the proposed team, submit a maximum of ten (10) specific, recently completed projects that best illustrate overall team experience in the required structural engineering services. Provide the month and year of completion of professional services for each project. If the project is a Department of Defense/Government contract, include the complete contract number, including the task order number if applicable. Projects involving only secondary or support services (as listed above) or providing other than structural engineering services are not required and will not be reviewed. Submit a brief description of the project within block 24 of SF330, Section F. Firms with multiple offices shall indicate which office performed the services. In addition, address key elements for each project by describing: 1) Specific Structural Engineering services performed by the firm; and 2) Sustainable features incorporated in the project (if none or if not applicable to the project, affirmatively state so). A “specific project? is a single project/function contract or a single task order under an Indefinite Delivery Indefinite Quantity or On-Call type Contract. “Recent? is defined as professional services completed within the past five years prior to the SF330 due date (February 2009 or later for purposes of this synopsis). Projects not yet completed will not be evaluated. “Completed? is defined as the date that the study/investigation was completed and submitted, or the date that the final design or design-build package was completed, and does not include construction contract support services or inspection during construction. Projects shall have been performed by the office(s) (main or branch) identified in Part 1, Section C. Projects not meeting these requirements will not be considered. If the proposed team is a joint venture (JV), information should be submitted as a joint venture; however, if there is no information for the JV, information should be submitted for each JV partner, while ensuring you do not exceed the maximum of ten (10) projects for the proposed team. If a project was performed by a JV, and all JV members are not on the team proposed for this contract, the firm should specifically address the work performed by the JV member submitting on this contract. Likewise, if the team member worked as a subcontractor on a project, the description should clearly identify the work actually performed by the team member and their roles and responsibilities on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities teaming on this contract, the project may not be considered for evaluation. SF330, Part 1, Section G, Key Personnel Participation in Example Projects: Submit in accordance with the SF330 Instructions. From the total projects listed in Section F, provide a maximum of ten (10) projects. SF330, Part 1, Section H, Additional Information requested by Agency. Address the remaining Criteria 3 through 7; additional sheets may be used up to the maximum of 30 total pages for Part 1. See submission requirements. Clearly identify the Criterion number and title. CRITERION 3, CAPACITY: Capacity to accomplish the work in the required time shall be evaluated. Submission Requirements: Submit a narrative that demonstrates the firm’s capacity to accomplish work in the required time frames. Address key elements by identifying and discussing: 1) Present workload; and 2) Availability of the project team (including subcontractors) for the specified contract performance period; 3) Capacity to accomplish multiple task orders simultaneously; and 4) Ability to sustain the loss of key personnel while accomplishing work within the required time limits, to ensure continuity of services and ability to meet surges in unexpected project demands. CRITERION 4, PAST PERFORMANCE: Past performance with relevant contracts/projects with Government agencies and private industry in terms of cost control, quality of work, compliance with performance schedules with emphasis on example projects presented in Section F. Firms will be evaluated based on past performance assessments and other available information regarding past performance. Points of contact provided in other criteria may be contacted. A proposal with no record of relevant past performance information shall be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation process. Submission Requirements: Show past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Submit an A-E Contractor Appraisal Support System (ACASS) or a Past Performance Questionnaire (PPQ) evaluation for each project listed under Criterion 2. If a completed ACASS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed ACASS evaluation, the PPQ included with this notice is provided for the Offeror or its team members to submit to the client for each project. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN AN ACASS EVALUATION IS AVAILABLE. If an ACASS evaluation is not available, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF330. If the A-E is unable to obtain a completed PPQ from a client for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and client information for the respective projects. A-Es should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Governments point of contact, Naval Facilities Engineering Command Southwest, Code RAQ20.EP, Attn: Elliott Penetrante, via email at elliott.penetrante@navy.mil, prior to the response date. A-Es shall not incorporate by reference into their response PPQ or ACASS evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted ACASS and PPQ evaluations will not be counted as part of the 30 page limitation and shall be attached to the SF330, behind the SF330 Part II document. For each project provided as experience in Section F, list applicable awards and commendations. CRITERION 5, LOCATION AND KNOWLEDGE OF THE LOCALITY: Firms location within and demonstrated knowledge of the general geographical areas in which projects could be located shall be evaluated. The work for this contract shall occur at various Navy and Marine Corps facilities and other military installations located in Arizona, California, Colorado, Nevada, New Mexico and Utah. The majority of work will be in Southern and Central California. Prime A-E firms with a local office in the Southern California area may be considered more favorably in the evaluation process. Submission Requirements: Submit a narrative that demonstrates the firm’s knowledge of and experience in the general geographical area of this contract. Address key elements by identifying and discussing: 1) The location of the firm’s main offices, branch offices, and subconsultants’ offices; 2) The team’s knowledge of and availability to work in the geographical area; and 3) Ability of the firm to ensure timely response to requests for onsite support at installations within the NAVFAC Southwest Area of Operations. CRITERION 6, QUALITY CONTROL: Demonstration of the design Quality Control (QC) program used by the firm that ensures technical accuracy and cross coordination among disciplines shall be evaluated. Firms that demonstrate a QC process that will minimize the government’s effort to perform quality assurance may be considered more favorably in the evaluation process. Submission Requirements: Submit a narrative that describes the design QC program used by the firm to ensure technical integrity of provided services. Address key elements by identifying and describing: 1) The design QC process the A-E uses to ensure consistent quality work across the entire team (including subcontractors); 2) The prime A-E’s specific design QC processes for checking documents for coordination errors, omissions, conflicts, and discrepancies in the design/report documents, and processes for tracking and incorporating review comments; and 3) The prime A-E’s procedures for ensuring appropriate supervision and review, by a professionally registered structural engineer, of engineering personnel and structural engineering work product. CRITERION 7, VOLUME OF WORK: Volume of DOD work awarded to the firm in past 12 months with objective of equitably distributing contracts among firms, including minority owned firms and firms without prior DOD contracts shall be evaluated. Submission Requirements: Provide a list of DOD contracts/task orders awarded in the last 12 months to the firm identified in the SF330 as the Prime. Joint ventures (JV) should list awards to the JV entity and separately list awards to each individual JV member for that time period. Do not include work performed as a subcontractor. Include the dollar amount for each DOD contract/task order awarded. Firms with multiple offices shall indicate which branch office completed each project. Include agency phone numbers and points of contact. Joint ventures (JV) should list awards to the JV entity and separately list awards to each individual JV member for that time period. SELECTION INTERVIEW REQUIREMENTS: Personal interviews may be scheduled for firms slated as most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in the SF330 submittal. Elaborate presentations are not desired. Please note Joint Ventures (JV) slated for interviews will be required to provide a copy of the JV Agreement prior to the interview. ADDITIONAL INFORMATION: All information must be included in the SF330 package, (cover letter, attachments and excess number of pages will be excluded from the evaluation process). System for Award Management (SAM) Database: Ensure your firm has an active SAM entity record. SAM is a Federal Government owned and operated free web site that consolidates the capabilities of CCR (Central Contractor Registration), ORCA (Online Representations and Certifications Application), and EPLS (Excluded Parties List System). SAM is the primary Government repository for current and prospective federal awardee information. Please complete your SAM registration for the same name and address identified as the submitting office on your SF330, with its associated CAGE code and DUNS or DUNS+4. Registration instructions and information can be accessed from the SAM home page at: https://www.sam.gov In accordance with the Brooks Act, the A-E Firm must be a registered/licensed architectural and/or engineering firm. Provide evidence that your firm, subcontractor or proposed team members are permitted by law to practice the profession of Architecture or Engineering, i.e. State registration number, a brief explanation of the firm’s licensing in states that do not register firms, etc. Architect-Engineer firms which meet the requirements described in this announcement are invited to submit a completed SF330 package per the submission requirements to the office shown below. One copy of the submittal package (original, plus 2 copies and 1 CD) is to be received in this office (NAVFAC Southwest, Attn: Elliott Penetrante, Code RAQ20.EP, 1220 Pacific Highway , San Diego, CA 92132) no later than, 2:00 P.M. Pacific Standard Time on WEDNESDAY, MARCH 19, 2014, in order to be considered. Facsimile and emailed SF330’s will not be accepted. Submittals received after this date and time will not be considered. Read the following information carefully. It is an Offerors responsibility to deliver its SF330 to the proper place at the proper time which includes allowing a reasonable amount of time for the delivery of the SF330 (FAR 15.208(a)). Offerors shall ensure that SF330s are mailed or sent by courier in a timely manner to be delivered to the NAVFAC Southwest facility no later than the date and time stated in this notice. An Offeror risks the late receipt and rejection of their SF330 when it delays delivering its SF330 until the last few minutes before the time set for receipt of SF330s. Offerors intending to deliver the SF330 in person to the facility at the address above are cautioned that this NAVFAC Southwest facility is located in downtown San Diego. It is recommended that the Offeror allows for delays in driving through downtown San Diego caused by traffic (both freeway and downtown), train/trolley crossing, parking at the pay lots/meters near the facility, and gaining access to a secure Government facility. No parking or offloading of SF330s is available at the Government facility. SF330s are to be delivered to the mailroom in Building 128 and reasonable time shall be allowed for the person in the mailroom to receive and time stamp the SF330. The stamp time is determined from the NAVFAC Southwest facility mailroom time stamp and not any other time keeping equipment that the Offeror may own. Immediately upon SF330 delivery the Offeror shall leave the Government facility. An Offeror that does not leave the premises may be requested to leave or be escorted off the premises. THIS IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. It is the Offeror’s responsibility to check the NAVFAC electronic solicitation website NECO (Navy Electronic Commerce Online) at: https://www.neco.navy.mil for any revisions to this announcement or other notices. Plan-holder list is available via the NECO website and an Interested Vendors List is available via the FedBizOpps website, www.fbo.gov, under this solicitation number. Address inquiries preferably via email: elliott.penetrante@navy.mil or via telephone: 619-532-2967. *** END OF ANNOUNCEMENT ***

More opportunities from Department Of Defense → Navfacsyscom Southwest

Same awarding agency

NAICS: 238210
New
Federal
IDIQ JOC TOTAL SMALL-BUSINESS SET-ASIDE FOR ELECTRICAL AND OTHER WIRING INSTALLATION PROJECTS AT VARIOUS GOVERNMENT FACILITIES LOCATED WITHIN THE MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CO
Solicitation # N6247324R2610
Solicitation N6247324R2610 is a Total Small-Business Set-Aside Indefinite Delivery Indefinite Quantity Job Order Contract (IDIQ JOC) issued by NAVFAC Southwest. The contract is for electrical and other wiring installation projects, including repair, renovation, and minor new construction, at various government facilities in California, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum value of 35 million dollars, with individual task orders ranging from 2,000 dollars to 1 million dollars. The performance period consists of a two-year base period and two three-year option periods, for a maximum total duration of eight years. The basis of award is Lowest Priced Technically Acceptable (LPTA). Proposals are evaluated on five factors: Ability to Manage Multiple Simultaneous Projects, Experience, Past Performance, Safety, and Price. All non-price factors are rated as acceptable or unacceptable, with Factor 1 serving as a threshold requirement for eligibility. Pricing is based on established coefficients and pre-determined unit prices using R.S. Means Cost Data. Offerors must submit their proposals electronically via the PIEE Solicitation Module by October 28, 2026. Key requirements include a 5,000 dollar bid bond, CMMC Level 2 (Self) status, and compliance with Davis-Bacon wage determinations and various DFARS clauses regarding Russian fossil fuel business operations and restrictions on certain magnets, tantalum, and tungsten.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

5 days ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
Federal
IDIQ, JOC FOR PLUMBING, HEATING, AIR CONDITIONING PROJECTS AT MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CORPS AIR-GROUND COMBAT CENTER 29 PALMS, MARINE CORPS MOUNTAIN WARFARE TRAINING CENTER BRIDGEPORT, AND NAVAL AIR WEAPONS STATION CHINA LAKE, CA AOR
Solicitation # N6247324R2611
This is a Total Small Business Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) issued by NAVFAC Southwest for plumbing, heating, and air conditioning projects. The contract covers various government facilities within the California Area of Responsibility, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum ceiling value of 49 million dollars with a minimum government obligation of 5,000 dollars. The performance period consists of a two-year base period from December 1, 2024, through November 30, 2026, with two subsequent three-year option periods extending the potential performance through November 30, 2032. The procurement utilizes a Lowest Priced, Technically Acceptable (LPTA) award process. Non-price evaluation factors, including the bidder's ability and experience, technical approach, and safety records, are rated as either acceptable or unacceptable. Pricing is based on a coefficient model where offerors provide multipliers applied to R.S. Means Cost Data. Task orders are issued as Firm Fixed Price contracts with individual order limits ranging from a minimum of 2,000 dollars to a maximum of 2 million dollars. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages in San Bernardino, Kern, Mono, and Inyo counties, and Cybersecurity Maturity Model Certification (CMMC) verification. Recent amendments have incorporated prohibitions regarding Russian fossil fuel business operations and restrictions on certain foreign-sourced magnets, tantalum, and tungsten. Contractors must also comply with strict safety standards, including OSHA and EM 385-1-1, and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in about 8 hours
View Details
NAICS: 236220
New
Federal
IDIQ JOC FOR GENERAL CONSTRUCTION PROJECTS AT GOVERNMENT INSTALLATIONS WITHIN NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND SOUTHWEST THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO AND MARINE CORPS AIR STATION (MCAS) MIRAMAR, CALIF
Solicitation # N6247325R0062
Navfacsyscom Southwest is conducting a market survey via a Sources Sought Synopsis to identify qualified small businesses for an Indefinite Delivery Indefinite Quantity Job Order Contract. The scope of work involves new general building construction, repair, and renovation projects at various government facilities in the Metropolitan San Diego area, including Naval Base San Diego, Naval Base Point Loma, Naval Base Coronado, and Marine Corps Air Station Miramar. The proposed contract features a two-year base period with a three-year option, for a maximum duration of five years. The estimated total contract value is 99 million dollars, with individual task orders expected to range between 2,000 and 2 million dollars. The government is specifically seeking sources that are Small Businesses, SBA certified 8(a), HUBZone, Women Owned, or Service-Disabled Veteran Owned. Under NAICS code 236220, the small business size standard is 45 million dollars. To be considered, interested firms must provide their UEI and CAGE code, bonding capacity, and evidence of a physical office within a 150-mile or three-hour radius of the installations. Capability is evaluated based on the submission of three to five recent prime contracts completed within the last five years, each valued at a minimum of 100,000 dollars, with at least 50 percent of the work self-performed. Additionally, firms must provide OSHA DART and TRC rates for 2023 through 2025, with detailed explanations required for DART rates above 3.0 or TRC rates above 4.5. Responses must be submitted via email to Rashonda T. Smith by October 28, 2026.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 562910
Federal
Request for Offer for RADMAC III Parcel E Remedial Action
Solicitation # N6247326RB009
Solicitation N62473-26-R-B-009 is a competitive request for offers under the RADMAC III Multiple Award Contract for the second phase of remedial action at Parcel E, Hunters Point Naval Shipyard in San Francisco, California. The project focuses on remediating non-aqueous phase liquid contamination at Installation Restoration Site 03, with a scope of work that includes shoreline excavation, confirmation sampling, in-situ stabilization, shoreline revetment, and the installation of a groundwater containment slurry wall and monitoring wells. The performance period is 60 months from the date of award, with work required to commence within 15 calendar days of the task order. The contract will be awarded based on best value using a trade-off process, evaluating three primary factors: Technical Approach, Local Hiring, and Price. The Technical Approach is weighted as twice as important as Local Hiring, and combined, these non-price factors are approximately equal in importance to the price. Offerors must possess valid radioactive materials licenses from the Nuclear Regulatory Commission and the State of California Department of Health Services. Additionally, the project requires 100 percent Payment and Performance Bonds for construction elements and adherence to both Service Contract Act and Davis-Bacon wage determinations. Proposals must be submitted electronically via the PIEE Solicitation Module, with a final submission deadline of November 3, 2026.
Remediation Services

POSTED

7 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS