Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

A--SPACE LAUNCH SYSTEM ACQUISITION OVERVIEW

Active
SLS-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

NASA is developing the Space Launch System (SLS), a next-generation heavy-lift launch vehicle designed to enable human exploration beyond Earth's orbit. The SLS will carry the Orion Multi-Purpose Crew Vehicle along with cargo, equipment, and scientific payloads for missions to Earth orbit and farther destinations. It will also serve as a backup transportation option to the International Space Station. Building on technological advancements from the Space Shuttle and Constellation programs, the SLS incorporates proven hardware, such as the RS-25D engines for the Core Stage and J-2X engines for the Upper Stage, combined with dual solid rocket boosters for initial flights. This modular system will initially have a lift capacity of 70 metric tons, with plans to evolve to 130 metric tons, allowing NASA to configure the vehicle to meet diverse mission needs efficiently. The program follows an evolvable development approach to manage costs and schedule, utilizing existing contracts for components like the Ares First Stage Boosters, Upper Stage, and avionics through the early 2020s. Future phases will feature competitive procurements, especially for advanced boosters and payload systems, with risk reduction efforts and design evaluations planned to ensure optimal technology selection. Core Stage engines will draw from an inventory of RS-25Ds, while spacecraft adaption and payload fairings are set for in-house design and later competitive acquisition. Systems engineering led by NASA will continue through critical design reviews, supporting an initial developmental flight targeted for late 2017. Additional industry engagement and detailed procurement synopses will be provided as the program progresses.

General Info

NASA develops modular Space Launch System using RS-25D engines for versatile heavy-lift missions beyond Earth orbit.

Agency

N/A

NAICS

336415 - Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
NASA recently announced the development of the Space Launch System -- an advancedheavy-lift launch vehicle that will provide an entirely new national capability for humanexploration beyond Earth's orbit. The Space Launch System will give the nation a safe,affordable and sustainable means of reaching beyond our current limits and opening up newdiscoveries from the unique vantage point of space.The Space Launch System, or SLS, will be designed to carry NASAs Orion Multi-PurposeCrew Vehicle, as well as important cargo, equipment and science experiments to Earth'sorbit and destinations beyond. Additionally, the SLS will serve as a back up forcommercial and international partner transportation services to the International SpaceStation.The SLS will incorporate technological investments from the Space Shuttle Program and theConstellation Program in order to take advantage of proven hardware and cutting-edgetooling and manufacturing technology that will significantly reduce development andoperations costs. It will consist of Core and Upper Stages with common avionics. It willuse a liquid hydrogen and liquid oxygen propulsion system, which will include the RS-25Dengine from the Space Shuttle Program for the Core Stage and the J-2X engine for theUpper Stage. SLS also will use dual solid rocket boosters for the initial developmentflights, while follow-on boosters will be obtained through competition based onperformance and interface requirements. The SLS will have an initial lift capacity of 70metric tons, or more than 154,000 pounds. The lift capacity will be evolvable to 130metric tons, or more than 286,000 pounds. The first developmental flight is targeted forthe end of 2017. The specific architecture was selected after careful analysis of the combination oftechnologies that would most effectively meet the SLS capability requirements. Thearchitecture also utilizes an evolvable development approach, which allows NASA toaddress high-cost development activities early on in the program and take advantage ofhigher buying power before inflation erodes the available funding of a fixed budget. Thisarchitecture also enables NASA to leverage existing capabilities and lower developmentcosts by using liquid hydrogen and liquid oxygen for both the Core and Upper Stages.Additionally, this architecture provides a modular launch vehicle that can be configuredfor specific mission needs using a variation of common elements. NASA may not need tolift 130 metric tons for each mission and the flexibility of this modular architectureallows the agency to use different configurations by using Core Stage engines, UpperStage, and booster combinations to achieve the most efficient launch vehicle for thedesired mission.The SLS vehicle procurements will be structured to meet the Agencys requirement for anaffordable and evolvable vehicle within a schedule that supports various missionrequirements. Procurements will include utilization of existing assets to expeditedevelopment, as well as further development of technologies and future competitions foradvanced systems and key technology areas specific to SLS evolved vehicle needs. Detailed synopses will be issued in the near future for the individual procurements asrequired by regulation.Initial planning is for the following:Boosters utilization of the five segment Ares First Stage Boosters under the existingcontract for the initial flights, the first of which is targeted for the end of 2017.Advanced Boosters to be utilized for missions beyond the initial flights -The Agency will not specify solutions (i.e. liquid or solid propulsion may beproposed), but will instead solicit solutions to meet performance and interfacerequirements. -A risk reduction solicitation will be issued later this calendar year to improvethe competitiveness of competing propulsion technologies and business cases before workbegins on the actual Design, Development, Test and Evaluation (DDT&E) of the finalbooster configuration. -DDT&E will be solicited in the 2013-2014 timeframe after results are received fromthe risk reduction effort.Stages utilization of the existing Ares Upper Stage contract for the integrated SLSCore Stage and Upper Stage for the initial SLS capability through 2021.Avionics - utilization of the existing Ares Instrument Unit Avionics contract for theinitial SLS capability through 2021.Engines for the Core and Upper Stages -Core Stage Engine - utilization of the existing inventory of RS-25Ds for theinitial SLS capability. -Upper Stage Engine utilization of the existing Ares J-2X development contract.Spacecraft and Payload Adaptors, and Payload Fairing initial in-house design effortsfollowed by competitive acquisitions beginning in the 2013 timeframe.Advanced development - a combination of in-house tasks and competitive opportunities forindustry and academia beginning in 2012.Systems Engineering and Integration NASA led at least through SLS critical designreview (CDR) in 2014. More details will be forthcoming in the near future to include presentations at the SLSIndustry Day to be conducted on September 29, 2011, at the Davidson Center, inHuntsville, AL. Registration information can be found athttp://prod.nais.nasa.gov/cgi-bin/eps/synopsis.cgi?acqid=148572 . Questions and commentsmay be submitted to Earl Pendley, telephone number +1 (555) 000-0000, or via email contact@example.gov.

Similar Contracts

Same NAICS industry code

NAICS: 336415
New
DIBBS
TUMBLER ASSEMBLY
Solicitation # SPE4A6-27-T-7441
Solicitation SPE4A6-27-T-7441 is a federal procurement issued by the Defense Logistics Agency (DLA) Weapons Support ASC Commodities Division for the supply of 75 Tumbler Assemblies (NSN 1440-01-725-5238). The items must be manufactured in accordance with Reference Drawings 98747 201717861 and 98747 201824601, both Revision A. The contract specifies a delivery timeline of 369 days after order, with FOB and inspection/acceptance points set at the origin. A critical requirement includes the delivery of one unit for First Article Testing (FAT) within 90 calendar days of the contract date to Hill AFB, Utah. The government will add a testing cost of 1,774.00 dollars to the offered price during the evaluation process. The procurement is designated as a Total Small Business Set-Aside under NAICS code 336415. Quality standards require the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001 tailored to SAE AS9003, with sampling conducted per MIL-STD-1916 or ASQ H1331. Due to the nature of the technical data, the contract is subject to strict export controls under ITAR and EAR, requiring contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contract mandates compliance with CMMC Level 2 cybersecurity standards and DFARS 252.204-7012 for safeguarding covered defense information. Packaging must adhere to MIL-STD-129 and DLA Master List requirements, with specific standards for hazardous materials under TQ requirement IP025.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS