This Solicitation opportunity from New Jersey was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Aboveground and Underground Storage Tank Inspection Services, Maintenance, and LSRP Services
Closed
2026-ITB-13State & LocalSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Documents
7XLSX
XLSX, High priority: read this firstcost-sheet
HighAI Summary for 2026-2027 Tank Inspection Bid Cost Sheet: This document is a cost sheet for the 2026-2027 tank inspection bid, detailing pricing for various inspection and maintenance services. It includes bid summaries for annual inspections of aboveground and underground storage tanks, 3-year inspections, 5-year inspections for chemical and leachate tanks, piping inspections, and LSRP service hourly rates. The sheet outlines quantities, unit costs, and total costs for each task and contract segment, with provisions for adjustments based on operational needs. It serves as a pricing schedule for the bid submission.XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for AST and UST Tank Listing Table 2026-2027: This document is a detailed tank listing table for the years 2026-2027, covering aboveground storage tanks (AST) and underground storage tanks (UST) at various locations including Pineland Park Landfill, Environmental Park, Wastewater Treatment Plant, and Pump Stations. It specifies tank IDs, types, fuel/product types, locations, installation dates, sizes, materials, and monitoring features. The table includes operational notes such as ACUA's right to adjust quantities based on needs. The document serves as a technical specification for tank inventory and monitoring requirements.PDF
PDF, High priority: read this firstitb
HighAI Summary for Bid 2026-ITB-13 Aboveground and Underground Storage Tank Inspection Services: This Invitation to Bid (ITB) 2026-ITB-13 from Atlantic County Utilities Authority solicits bids for Aboveground and Underground Storage Tank Inspection Services, Maintenance, and Licensed Site Remediation Professional (LSRP) Services. Released on March 24, 2026, with a bid opening date of May 1, 2026, the document includes instructions to bidders, technical specifications, and bid proposal requirements. It covers three contracts for tank maintenance and compliance inspections, five-year AST and piping inspections, and LSRP environmental consulting services. The contract term is 24 months with a possible two-year extension. The scope includes inspection, maintenance, troubleshooting, and repair services at various ACUA facilities in Atlantic County, NJ, ensuring compliance with state and federal regulations.PDF
PDF, High priority: read this first2 pages · q-and-a
HighAI Summary for Bidder FAQ on Electronic Bid Bonds and Consent of Surety: This document is a FAQ from the Atlantic County Utilities Authority (ACUA) explaining the requirements for submitting bid security electronically in compliance with New Jersey statutes. It details the mandatory upload of PDF copies of Bid Bonds and Consent of Surety with online bids, the conditions under which scanned paper bonds are acceptable, and the use of electronic verification systems like Surety2000. It also covers the necessity of delivering original hard copies if electronic verification is not available, consequences of non-compliance including bid rejection, and ACUA's right to request originals even after electronic submission. The document emphasizes the strict legal requirements for bid security to ensure enforceability and binding validity.PDF
PDF, High priority: read this first4 pages · instructions
HighAI Summary for Instructions for Completing Forms in DocuSign - Ocean County Bid Submission: This document provides detailed instructions for completing and submitting bid documents via DocuSign for Ocean County solicitations. It outlines steps to access, complete, sign, and upload mandatory forms including the Signature Page, Non-Collusion Certification, Affirmative Action Questionnaire, Statement of Ownership, and Disclosure of Investment Activities in Iran. The instructions emphasize the importance of matching the email used in DocuSign with the vendor account email and completing all required fields to avoid proposal rejection. The document also highlights the County's preferred submission method as DocuSign and includes guidance on downloading, printing, and loading completed documents into the OpenGov system. The version referenced is updated as of March 1, 2022, with completion examples dated April 7, 2022.DOCX
DOCX, High priority: read this firstifb
HighAI Summary for REVISED 2026-2027 Tank Inspection, Maintenance, and LSRP Services Solicitation: This document is a revised Invitation for Bid (IFB) issued by the Atlantic County Utilities Authority for contracts covering tank inspection, maintenance, and Licensed Site Remediation Professional (LSRP) services for the 2026-2027 period. It outlines three contracts for aboveground and underground storage tank inspections, maintenance, and environmental consulting services at various ACUA facilities in New Jersey. The contract term is 20 months starting May 1, 2026, with an option to extend for two additional years. The document details the scope of work, regulatory compliance requirements, facility locations, and contract terms, emphasizing fixed pricing and contractor responsibilities for compliance and remediation.PDF
PDF, High priority: read this first2 pages · contract-document
HighAI Summary for SPECIMEN Contract Agreement - Atlantic County Utilities Authority: This document is a specimen contract agreement between the Atlantic County Utilities Authority (ACUA) and a contractor. It outlines the contractor's obligations to furnish, deliver, and install goods or services as per the specifications and bidding documents. The agreement includes clauses on performance security, insurance, warranties, contract duration, compliance with the New Jersey Prevailing Wage Act, record keeping, and payment terms. The contract is subject to annual fund availability and may include renewal options. The document is a formal contract template intended for execution upon award.AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownAsk CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Organization & Contact Information
Show more
AgencyNew Jersey → Centralized Maintenance
Contacts2 people available
OfficeEgg Harbor Township, NJ, 08234, USA
Organization / AgencyNew Jersey → Centralized Maintenance
Office AddressEgg Harbor Township, NJ, 08234, USA
Contacts
Kristi AikenMaintenance Resource Coordinator
Oren ThomasProcurement and Contracts Manager
Full Description
Show more
The Atlantic County Utilities Authority (ACUA) owns and operates a Solid Waste complex in Egg Harbor Township, Atlantic County, NJ, known as the Howard F. Haneman Environmental Park, and a Wastewater Treatment Facility in Atlantic City, Atlantic County, NJ, known as City Island Treatment Plant. The Solid Waste facility is home to an active landfill, a recycling center, composting site, and ancillary facilities. Also on site is the ACUA's primary administration building, constructed in 1992, which features a closed-loop geothermal HVAC system. The site is home to a 5.4 MW landfill methane gas to electricity project which provides 100% of the power needs of the Park. The ACUA's solid waste complex is located at 6700 Delilah Road, in Egg Harbor Township, New Jersey. The site consists of approximately 360 acres with approximately 102 acres representing the landfill footprint. The Wastewater Treatment Facility has been in operation since 1978 and services 14 communities in Atlantic County. It is home to the Jersey-Atlantic Wind Farm, a 7.5 MW wind farm that is privately owned and from which the ACUA purchases approximately 12 million kWh per year of electricity. In addition, the facility also houses a 500 kW solar PV system. The ACUA is responsible to the residents of Atlantic County to be financially prudent and environmentally responsible.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS