Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Access Control Fiber Hardware and Installation

Closed
25-P-00298State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423710
New
Federal
Replace Exterior Cipher Locks and Exit Hardware Retrofit, Hawaii
Solicitation # W912CN27QA010
The US Army is requesting quotes for the replacement of exterior cipher locks and the retrofit of exit hardware at Building 768, Schofield Barracks, in Honolulu, Hawaii. This project involves the removal of obsolete hardware and the installation of 17 DoD-approved standalone electronic 10-PIN pushbutton cipher locks, heavy-duty vertical rod panic exit hardware, and high-security Small Format Interchangeable Cores (SFIC). The scope includes specialized conversion trim for both standard and bullet-resistant door assemblies, ensuring all installations meet DoD physical security requirements and NFPA 101 Life Safety egress regulations. Key deliverables include the fully operational hardware, master override and control keys, DPW key custody documentation, programming guides, and a two-year warranty on workmanship and hardware. This solicitation is a total set-aside for Women-Owned Small Businesses under NAICS 432710. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation method, requiring offerors to provide detailed technical specifications, a compliance crosswalk, and proof that installation personnel are GSA-certified and manufacturer-authorized. The period of performance is 30 calendar days from the date of award, with shipping terms set as FOB Destination. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Quotations are due by November 24, 2026, and must include a firm-fixed-price proposal and a comprehensive technical approach.
0413 Aq Hq Contract Augmented

POSTED

7 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract involves the installation of a Head-End Access Control System (ACS) at the Tampa Convention Center, specifically targeting the first-floor meeting and ballroom doors. The project scope includes wiring for 31 doors, with provisions for spare power cables and monitoring wiring, to facilitate future upgrades of the public-facing doors. The wiring will be run from distribution frames located on the second or maintenance level above the doors, with cables temporarily stored inside the walls until the system is fully operational. The hardware components required include multiple door wiring sets, head-end enclosures with power supplies, Mercury intelligent controllers, interface modules, and input monitor modules, reflecting a comprehensive security upgrade plan. Notably, the initial phase does not include terminating wiring into access readers, indicating a phased approach to the broader security enhancement project. The solicitation, titled "Access Control Fiber Hardware and Installation," was posted on July 23, 2025, with a response deadline of August 19, 2025. The project is managed by the Florida Department of Convention & Tourism, with a contract value estimated between 150,000 and 300,000 dollars. The primary point of contact is Michelle Estevez, reachable via email or phone. The project aims to improve security infrastructure at the venue, with the hardware and installation work aligned with OSHA safety standards, as detailed in the provided safety data sheets. This initiative marks the first phase of a multi-stage upgrade to enhance access control capabilities at the facility.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstitb
High
PDF, Low priority1 page · sds
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Industrial Piping and Valve SupplyOpen now, due in 13 days
  • Proprietary Door Parts SupplyOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Convention & Tourism
Contacts1 person available
OfficeN/A

Full Description

Show more
The scope of this project is the addition of Head-End Access Control System (ACS) security devices at the Tampa Convention Center at each first-floor meeting/ballroom doors. Project will be installation of ACS wiring to prepare for the replacement and upgrade of the public facing doors of the first floor. Due to wall fabric around doors, fabric repairs may be necessary after installation if cuts are needed to pull cables. Wiring will not be terminated into access readers at this time. This is the first phase of several for a broader project.Expected hardware needs:31 x Door Wiring for ACS and Spare Power Cable06 x Door Wiring for Monitoring05 x ACS Head End (HE) Enclosure with power supplies05 x Genetec SY-LP1502 Mercury Intelligent Controller11 x Genetec SY-MR52-S3 Mercury MR52 2-reader interface module01 x Genetec SY-MR16IN-S3 Mercury MR16IN 16-input Monitor ModuleCables will be run from intermediary distribution frames on the 2nd/maintenance level above the doors and dropped downward and capped/coiled right above doorway (inside wall) for storage until TCC is ready to utilize the cables. There are a total of 31 doors/drops.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS