This Solicitation opportunity from Florida was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The School Board of Osceola County, Florida, issued solicitation SDOC-26-B-086-ML for access control system improvements at four district sites: Zenith Accelerated Learning Academy, Kissimmee Middle School, New Beginnings Education Center, and Voyager K-8 School. The project scope requires the installation of complete access control systems, including hubs, control panels, hardware, and cabling. Specific technical requirements include the use of Chatsworth 30330-719 horizontal cable managers or equivalents, UL 969 printed labeling for all cables, and the use of Assa Abloy/Persona 1006 series software. Contractors are responsible for all permitting, adhering to SDOC Division 27 Standards, and providing a compiled cable count and identification list in Microsoft Excel.
The project was scheduled to commence on June 24, 2026, with a final completion date of January 29, 2027. Following a competitive bidding process that included mandatory pre-bid walkthroughs and SBE/VBE participation goals of 10 percent, the board approved awards to Convergent Technologies LLC and Integrated Fire & Security Solutions on July 28, 2026. The contract is governed by standard SDOC construction agreements and federal terms and conditions, requiring performance and payment bonds to ensure faithful execution and a one-year guarantee period for repairs and replacements.
General Info
Osceola County School Board awarded access control system installations at four district sites.
HighAI Summary for Attachment A - ITB General Terms and Conditions: Revised July 23, 2025. This document outlines the general terms and conditions for an Invitation to Bid (ITB) for the School District of Osceola County, Florida. It includes district demographics, posting procedures, 'cone of silence' restrictions, clarification/addenda protocols, public opening rules, and bid execution requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment D - Price Sheet (SDOC-26-B-086-ML): A price sheet for solicitation SDOC-26-B-086-ML regarding Access Control Projects for four district sites: Zenith Accelerated Learning Academy, Kissimmee Middle School, New Beginnings Education Center, and Voyager K-8 School. The document requires bidders to provide the Total Base Bid, Cost of Performance & Payment Bonds, and the combined Total Cost for each lot. Award determination is based on the Total Turnkey Price plus Bonds.
PDF
PDF, High priority: read this firstsupporting-document
HighAI Summary for Attachment E - SBE/VBE Program Participation Form: A mandatory participation form for bidders to document their commitment to Small Business Enterprise (SBE) and Veteran Business Enterprise (VBE) goals. It specifies an overall participation goal of 10% and requires a detailed table of certified entities, the type of work provided, and the associated dollar values.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment G - Federal Terms and Conditions: This document outlines the mandatory Federal Terms and Conditions for contracts issued by the School District of Osceola County under Federal awards. It incorporates requirements from 2 CFR Part 200 Appendix II and USDA regulations, covering critical compliance areas including EEO, Davis-Bacon Act, Clean Air and Water Acts, debarment, anti-lobbying, and domestic preferences. Version dated 12/19/25.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kissimmee Middle School Floor Plans: A set of 10 floor plan documents for Kissimmee Middle School, located at 2410 Dyer Boulevard, Kissimmee, FL. The document includes layout details, room labels, and square footage for Buildings 1 through 5, dated 2-28-20.
PDF
PDF, High priority: read this firstitb-forms
HighAI Summary for School District of Osceola County - Bidder's Acknowledgement and Required Forms: Revised July 23, 2025. This document is Attachment B of an Invitation to Bid (ITB) for the School District of Osceola County, Florida. It contains the mandatory Bidder's Acknowledgement form, certification of equal opportunity employment, and standard terms and conditions, including drug-free workplace and debarment certifications. Completion and signature of these forms are required for a bid to be considered responsive.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for School District of Osceola County Construction Agreement C-26-1052-ML: A construction agreement between the School Board of Osceola County, Florida, and a contractor for a project initiated under ITB# SDOC-26-B-086-ML. The document outlines the purpose, general scope of work, performance timelines (Commencement: May 24, 2026; Final Completion: January 29, 2027), compensation structures, and change order procedures.
PDF
PDF, High priority: read this firstitb
HighAI Summary for SDOC-26-B-086-ML Access Control Projects for Four (4) Districts Sites: Invitation to Bid (ITB) issued by The School Board of Osceola County, FL, for the installation of complete access control systems at four sites: Zenith Accelerated Learning Academy, Kissimmee Middle School, New Beginnings Education Center, and Voyager K-8 School. The scope includes installation of hubs, control panels, hardware, and cabling. Bids are due by June 2, 2026, with a mandatory pre-bid walkthrough on May 12, 2026. The project is scheduled to run from June 24, 2026, to January 29, 2027.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for SDOC-26-B-D86-ML Access Control Projects Addendum #1: Addendum #1 issued on May 27, 2026, for Bid # SDOC-26-B-D86-ML regarding Access Control Projects for four district sites. The document provides clarifications on required software (Assa Abloy/Persona 1006 series) and specific hardware counts for KMMS, NBEC, VYK8, and ZENITH sites. It confirms the submittal deadline as June 2, 2026, and requires a signed acknowledgment from vendors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sunbridge K8 FISH Conformed Add1&2 - Site and Floor Plans: Technical architectural documents for the Sunbridge K8 FISH project, including an overall site plan with building square footages (e.g., Building 2: 17,390 sq.ft., Building 5: 127,860 sq.ft.) and detailed second and third floor plans with a scale of 1/16 inch = 1 foot.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ZENITH_FISH Room List: A detailed room schedule listing room numbers and their corresponding descriptions, primarily identifying a large number of reception areas and one office.
PDF
PDF, Low prioritypast-performance
LowAI Summary for Attachment C - References Form: A standardized form used by bidders to provide a list of three professional references, including agency contact details, dates of service, and types of services provided.
PDF
PDF, Low priorityperformance-bond
LowAI Summary for Attachment K - Performance Bond - School District of Osceola County: A template for a Performance Bond for the School District of Osceola County, Florida. The document outlines the legal obligations of the Principal (Contractor) and Surety to ensure the faithful performance of a contract, including a one-year guarantee period for repairs and replacements of work.
PDF
PDF, Low priorityaward
LowAI Summary for Bid SDOC-26-B-086-ML Evaluated Tabulation Sheet: Evaluated Tabulation Sheet for Bid # SDOC-26-B-086-ML regarding the Access Control Project for four district sites (ZENP, KMMS, NBEC & VYK8). Dated June 2, 2026, this document serves as the Notice of Intent to Award the bid to Conveyed Technologies LLC for the amount of $4,533.75, with board approval scheduled for July 28, 2026.
PDF
PDF, Low priorityother
LowAI Summary for NBEG_NEW_FISH.pdf: The document contains fragmented data, including a grid of numbers and repetitive 'CURRENTLY SERVING' strings. It does not contain any recognizable procurement language, solicitation details, or contractual terms. It appears to be a non-procurement related file or a corrupted data export.
PDF
PDF, Low prioritypayment-bond
LowAI Summary for School District of Osceola County - Payment Bond: A legal bond template for the School District of Osceola County, Florida, regarding affordable multi-family rental housing construction projects. The document outlines the obligations of the Principal (Contractor) and Surety to ensure payment to claimants for labor, materials, and supplies used in the project.
PDF
PDF, Low priorityother
LowAI Summary for School District of Osceola County - Report of Unsatisfactory Materials and/or Service: A template form (Attachment F) used by the School District of Osceola County to report unsatisfactory materials or services. It includes sections for problem statements, contractor responses, and warnings regarding potential payment withholding or disqualification from future bidding.
PDF
PDF, Low priorityaward
LowAI Summary for SDOC-26-B-086-ML Access Control Project Board Approval: Board approval letter dated July 28, 2026, for the award of Bid SDOC-26-B-086-ML. The project involves access control system improvements at four district sites (ZEN, KMMS, NBEC, and VYK8), with awards granted to Convergent Technologies LLC and Integrated Fire & Security Solutions.
The purpose of this Invitation to Bid (ITB) is to solicit competitive sealed Bids for Zenith Accelerated Learning Academy (ZENP), Kissimmee Middle School (KMMS), New Beginnings Education Center (NBEC) & Voyager K-8 School (VYK8) Access Control Projects. This Specification establishes the minimum requirements for this solicitation, listed and described in the body of these specifications, to be used as noted, by The School Board of Osceola County, FL. A Contractor shall provide Chatsworth 30330-719 horizontal cable manager (or equivalent) to each MDF/IDF closet. B Contractor shall provide an accurate count of all terminated cables in each MDF/IDF closet to the SSEM & Technology Departments or designee. C All Hubs/Control Panels cabling shall terminate to dedicated patch panels in the local MDF/IDF telecom room. Patch panel installation location in racks to be coordinated with SSEM Safety Security and Emergency Management Network Communications Analyst (Alfredo Torres) or designee. D All cabling shall be labeled at both ends to indicate Hubs/Control Panels number, patch panel number and port number. All labels shall be printed in accordance with UL 969, not handwritten. E Contractor shall be responsible for all permitting requirements per SDOC Code Compliance. F All construction areas shall be returned to a safe and clean condition at the end of each workday in compliance with SDOC Division 27 Standards. All material returned to SDOC shall be neatly boxed and left on site at an agreed location with project manager or designee and Site Administration. G All products shall be on the SDOC approved products list or submitted for approval prior to procurement. H Contractor shall be responsible for all access control installations to manufacturer`s installation specifications. I All Hubs/Control Panels shall be labeled for identification with specific locations where wire is terminated and patch panel. (Example: If Hub #3 is located in building two (2) second, floor IDF/MDF on patch panel A,#1. The label on mounting surface of Hub/Control Panel support should read IDF 2-201 / PP: A-1) J All the above information should be included into a compiled list within Microsoft Excel. K Project Schedule projected Start Date: June 24, 2026, and End Date: January 29, 2027
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award