This Solicitation opportunity from Missouri was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the supply and installation of access control systems for the Humphreys Renovation project at the University of Central Missouri, with solicitation number 26-025. Bids must be submitted exclusively through the UCM eBid system (Ionwave), and responses made outside of this platform may lead to disqualification. The procurement process emphasizes the importance of reviewing bid responses after unsealing, with bid pricing accessible via the system, and mandates that no award will be granted until thorough evaluation for responsiveness and responsibility is completed. The contract size is estimated between $500,000 and $1,500,000, with the project located in Missouri, and the primary contact is Robert Walla.
Supporting documentation includes affidavits for affirmative action and work authorization, ensuring compliance with federal and state employment laws, including participation in E-Verify. Safety protocols mandated by the university specify minimum safety practices for construction activities, such as fencing, barriers, and dust control, aligned with federal regulations like MUTCD. The contract also incorporates federally mandated provisions for construction projects funded through federal grants, emphasizing equal employment opportunity, remedies, and compliance with federal regulations. Additional related solicitations include requests for recycling processing services, construction bids for city projects, and bids for specialized equipment and grocery supplies, all managed through respective online platforms with strict submission deadlines and detailed requirements. Overall, the contract emphasizes compliance, safety, and transparency in procurement, with a focus on responsible vendor selection and adherence to federal and institutional regulations.
PDF, High priority: read this firstcontract-document
HighAI Summary for 2023 Construction Liquidated Damages Policy: This document outlines the liquidated damage requirements and dollar amounts applicable to construction contracts. It specifies that if the contractor fails to complete the work by the substantial or final completion dates, liquidated damages will be assessed daily. The damages are deducted from payments due to the contractor, with specific daily amounts based on contract sum tiers: $300/day for contracts up to $100,000, $500/day for contracts up to $500,000, $750/day for contracts up to $1,000,000, and $1,000/day for contracts over $1,000,000. The damages are predetermined, reasonable, and intended to compensate for detriment and expenses incurred due to delays. The policy is designed to ensure timely completion and protect the interests of UCM students, staff, faculty, and the public.
PDF
PDF, High priority: read this firstifb
HighAI Summary for 26-025 Access Control Supply and Installation - Humphreys Renovation: Invitation for Bid (IFB) issued on 8/20/2025 for the supply and installation of access control systems for the Humphreys Renovation (Federal) project. The response deadline is 9/12/2025. The document outlines submission requirements via the UCM Ebid system, including a 5% bid bond, insurance certificates, federal compliance documents, and a project management plan. Installation is scheduled for February 9, 2026, through March 15, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Access Control Sets & Schedule: Technical hardware schedule detailing access control sets for the Basement and First Floor. The document specifies door names, device types (including Schlage and LEBMS models), door position switches (DPS), and motion request-to-exit (REX) sensors for various locations.
PDF
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for General Construction Contractual Requirements: This document titled 'General Contractual Requirements Construction Projects' provides comprehensive instructions to bidders and general terms and conditions for construction projects. It includes detailed articles on bidding procedures, bidder obligations, contract award, and compliance requirements. The document outlines necessary forms for bid submission, such as bid bonds, subcontractor lists, and MBE/WBE compliance forms, and specifies conditions for prevailing wage applicability. It also covers contract security, minority business participation, and legal compliance. The version date is not explicitly stated, but the content is structured to guide bidders through the pre-bid and bidding process, ensuring adherence to University of Central Missouri procurement policies.
PDF
PDF, High priority: read this firstcompliance-evaluation-form
HighAI Summary for MBE-WBE Compliance Evaluation Form for Projects $100,000 or More: This MBE/WBE Compliance Evaluation Form is required for projects valued at $100,000 or more. It must be completed by bidders and submitted with their bid proposals to remain eligible for contract award. The form collects data on minority and women-owned business participation, including subcontract work descriptions, dollar amounts subcontracted, and certification status of the MBE/WBE firms. It also requires confirmation of certification by relevant agencies or completion of an eligibility determination form if not certified. The form includes fields for project details, general contractor information, and signatures.
PDF
PDF, High priority: read this first15 pages · wage-determination
HighAI Summary for Prevailing Wage Law Rules - Missouri Department of Labor: This document contains the Prevailing Wage Law Rules from the Missouri Department of Labor and Industrial Relations, Division 30, Chapter 3. It outlines the prevailing wage requirements for workers on publicly funded construction projects in Missouri. The rules specify the process for obtaining annual wage orders, the necessity of incorporating these wage rates into contract specifications, and the responsibilities of public bodies and contractors regarding payroll submissions and compliance inspections. The document includes definitions relevant to wage determinations and references legal authority and amendments up to 2016. It serves as a regulatory guide to ensure contractors pay at least the minimum prevailing wages as determined by the department.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Humphreys Hardware Sets: Technical hardware schedule detailing specific hardware sets (01-05) for various door numbers. The document includes detailed quantities, catalog numbers, finishes, and manufacturers for items such as hinges, electric panic hardware, cylinders, and closers, along with operational requirements for access control.
PDF
PDF, High priority: read this first2 pages · insurance-requirements
HighAI Summary for UCM Construction Contract Insurance Requirements Revised 08-10-2022: This document outlines the insurance requirements for contractors working on construction contracts for the University of Central Missouri (UCM), revised on August 10, 2022. It specifies the types and minimum amounts of insurance coverage contractors must maintain, including Workmen's Compensation, Public Liability and Property Damage, Owner's Protective Liability, and Builder's Risk or Installation Floater Insurance. The document details coverage for special hazards, certification requirements, and conditions for maintaining insurance throughout the contract duration. Contractors must provide certificates of insurance within ten days of contract receipt and maintain coverage without interruption to avoid work delays or bid rejection.
PDF
PDF, Low priority13 pages · contract-document
LowAI Summary for 2022 UCM Federal Grant Contract Provisions Construction: This document outlines the federally required contract provisions for the University of Central Missouri Federal Grant procurements related to construction. It includes clauses mandated by 2 C.F.R. § 200.326 and Appendix II to the Uniform Rules for Non-Federal Entity Contracts Under Federal Awards. Key provisions cover remedies, termination for cause and convenience, and equal employment opportunity requirements under 41 C.F.R. Part 60 and Executive Order 11246. The document emphasizes compliance with federal regulations and the necessity for contractors to acknowledge and accept these terms. It spans 13 pages and includes mandatory contractor signatures.
PDF
PDF, Low priority1 page · other
LowAI Summary for Affidavit for Affirmative Action: This document is an Affidavit for Affirmative Action related to a contract project. It includes a sworn statement by an authorized individual of a company regarding employment numbers and compliance with Affirmative Action requirements as per the University of Central Missouri's General Conditions. The affidavit is to be notarized with details of the notary public's commission and signature.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Affidavit of Work Authorization for University of Central Missouri: This document is an Affidavit of Work Authorization related to services for the University of Central Missouri. It affirms that the contractor and their personnel are enrolled in and will comply with a federal work authorization program, specifically referencing RSMo Chapter 285.530 (2). The affidavit includes a sworn statement by a contractor representative and a notary public section. It also references the E-Verify federal work authorization program for verification purposes.
PDF
PDF, Low priorityother
LowAI Summary for Johnson County Annual Wage Order No. 32: This document is the Annual Wage Order No. 32 for Johnson County, filed with the Missouri Secretary of State on March 10, 2025. It establishes prevailing wage rates for various occupational titles in building and heavy construction sectors, including hourly rates and overtime provisions. The order includes instructions for objections and details on holiday pay and overtime calculations for public works projects. It is prepared by the Missouri Department of Labor and Industrial Relations and signed by the Director of the Division of Labor Standards.
PDF
PDF, Low priorityapplication-for-waiver
LowAI Summary for MBE-WBE Application for Waiver Form: This document is the MBE/WBE Application for Waiver Form used for projects of $100,000 or more. It is submitted by bidders who fail to meet Minority Business Enterprise (MBE) or Women Business Enterprise (WBE) participation goals, demonstrating good faith efforts to include MBE/WBE subcontractors. The form requires detailed information on efforts such as attending pre-bid conferences, advertising, contacting MBE/WBEs, negotiating sub-bids, and assisting MBE/WBEs. The bidder requests a waiver of the MBE/WBE participation percentage goals based on these efforts. The form includes certification by the general contractor regarding the truthfulness of the information provided.
PDF
PDF, Low priorityeligibility-determination-form
LowAI Summary for MBE-WBE Eligibility Determination Form for Projects $100,000 or More: This document is the MBE/WBE Eligibility Determination Form intended for projects valued at $100,000 or more. It collects detailed information about a firm's ownership, business nature, years in business, control, and financial data including gross receipts and bonding information. The form also requires disclosure of any previous MBE/WBE certification or denial and includes a sworn affidavit section for accuracy and authorization. The form is used to assess minority and women-owned business eligibility for contracting purposes.
PDF
PDF, Low priorityother
LowAI Summary for Reference Humphreys Floor Plans: The document titled 'Reference Humphreys Floor Plans' appears to contain floor plans but has no readable content or detailed information available. The file is essentially empty or unreadable based on the provided content.
PDF
PDF, Low priority1 page · other
LowAI Summary for University of Central Missouri Safety Practices Ver 1 Nov 2016: This document outlines the University of Central Missouri's Safety Practices for construction and contractor work areas as of November 2016. It specifies minimum safety requirements including fencing around hazardous work areas, optional barriers for inside work, adherence to federal and state traffic regulations such as MUTCD, management of noxious fumes, and dust control methods for concrete work. The document emphasizes the university's commitment to a safe and healthy working environment and notes that additional safety requirements may be imposed depending on conditions.
Response deadline changed from May 29, 2025 to Sep 12, 2025. The notice title changed. NAICS code changed from 541330 to 238210. The notice description changed. The point of contact changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
** BIDS ACCEPTED VIA UCM Ebid SYSTEM ONLY ** Communication made with parties outside of Procurement may result in your solicitation response being disqualified.
UCM bids are secured by Ionwave until the closing date and time. Bid pricing is available for viewing when the bid is unsealed. To access bid pricing after the bid is unsealed, go to the UCM eBid system (Ionwave), click Closed Bids, the bid number, Bid Tabulation by Supplier.
Note: Pending any award, the bid is reviewed and evaluated for responsiveness and responsibility. No award will be made until the evaluation and review is complete by UCM.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award