Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Access Doors & Panels

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Fremont, CA, 94539, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-006.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fire Station 4 & 5 Hvac Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 15 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Fire Station 4 & 5 Hvac Replacement Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fremont
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Fremont
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs access doors and panels for prime contractors on City of Fremont municipal facility projects. Installs architectural metal access panels per Section 08 31 00 to provide equipment access. Delivers installed access panels.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
Three Double Pane Glass replacements units 2
Solicitation # three-double-pane-glass-replacements-units-2
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to replace three double-pane glass units at its center located in Minot, North Dakota. The scope of work includes providing all labor, materials, equipment, and supervision to install one insulated unit and two fire-rated units, specifically for the Male Dormitory and Recreation Center. The selected contractor must provide product specifications and fire-rating certifications prior to installation, along with a minimum one-year workmanship warranty and all applicable manufacturer warranties. Eligible bidders must possess a current North Dakota contractor's license and maintain insurance coverage including Workers Compensation and a minimum of $1 million in General Liability. Proposals must be submitted using the official bid sheet and include a certificate of liability insurance, license, warranty details, and a bond if the proposal exceeds $150,000. This opportunity is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Bids are due by December 4, 2026, at 4:00pm CST. The contract is subject to several federal regulations, including the Service Contract Act and prevailing wage requirements under FAR 52.222-41 and FAR 52.222-55. Other applicable clauses include certifications regarding debarment, anti-lobbying, and the dissemination of information. Payment terms are Net 30 following the verification of service completion and receipt of an invoice. The Quentin Burdick Job Corps Center reserves the right to accept or reject bids or contract separately unless the bidder specifies an all-or-none award.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238150
New
SLED
UCSD - Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 - Bid Packages 1.09 – Unitized Curtainwall / 1.10 – Structural Steel / 1.11 – Elevator
Solicitation # D1-A25012-00
The University of California, San Diego is soliciting bids for the Hillcrest Medical Center Renewal (HMCR) Hospital and CUP Wave 3 project, managed by DPR Construction. This solicitation, numbered D1-A25012-00, covers three specific bid packages: Unitized Curtainwall (1.09), Structural Steel (1.10), and Elevators (1.11), with estimated Phase 2 values of $37M, $65M, and $16M respectively. The total estimated construction cost for the overall project ranges between $1.5 billion and $2 billion. The Phase 1 project is estimated to last 28 months, beginning in May 2026 and concluding in September 2028 at 4300 1st Avenue, San Diego, California. Key deliverables for all scopes include HCAI submission, seismic engineering, and detailed BIM coordination, with additional visual and performance mockups required for the curtainwall. To be considered responsive, bidders must have participated in the mandatory pre-bid conference on October 28, 2026, and must be registered with the Department of Industrial Relations (DIR) per Labor Code sections 1725.5 and 1771.1. This is a prevailing wage project with skilled and trained workforce requirements. Technical proposals are due by November 20, 2026, and the final bid form, bid bond, and schedule of values must be submitted via Building Connected by December 9, 2026. The project emphasizes the participation of Small Business Enterprises (SBEs) and Disabled Veteran Business Enterprises (DVBEs).
DPR Construction

POSTED

about 19 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238150
New
SLED
Police Building Impact Windows Installation
Solicitation # 20260340
The City of Port St. Lucie is soliciting bids for the installation of impact windows and doors at the Police Department Facility under solicitation number 20260340. The scope of work includes the removal of existing windows and doors, the installation of hurricane-rated Level E windows meeting Florida Building Code and High Velocity Hurricane Zone standards, and subsequent restoration work such as patching, stucco repair, and painting. The contractor must coordinate with the city's security contractor to maintain functional electronic access and alarm systems. Key deliverables include a detailed construction schedule and impact-resistance certifications signed and sealed by a Professional Glazing Engineer registered in Florida. The contract will be awarded to the lowest responsive and responsible contractor based on a best value analysis that considers experience, technical adherence, operational and financial capacity, and pricing. Local businesses may receive a five percent preference in their total score. Bidders must submit responses electronically by December 30, 2026, including mandatory documents such as an E-Verify form, Non-Collusion Affidavit, and proof of insurance and licensing. Bid bonds may be submitted as hard copies or electronically via the Surety2000 platform. Financial terms include a five percent retainage from progress payments, with invoices submitted monthly and paid within twenty business days. The successful contractor must provide a performance and payment bond for 100 percent of the contract price, which must remain in effect for one year after final acceptance. All hardware must comply with ADA and Florida Accessibility Code requirements, and the contractor is responsible for obtaining all necessary permits and licenses.
City Manager's Office

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → City of Fremont

Same awarding agency

NAICS: 238220
New
SLED
Fire Station 4 & 5 Hvac Replacement Project
Solicitation # 27-006
The City of Fremont is soliciting bids for the Fire Station 4 and 5 HVAC Replacement Project, which involves the demolition and removal of existing gas-fired furnaces and rooftop condensing units. The scope of work requires the installation of all-electric heat pump fan coil and condensing units, including the specific replacement of Fan Coil FC-4 at Fire Station 4. The contractor must integrate new equipment into the existing Allerton controls system and install new electrical power from existing panels. The project requires the provision of all labor, materials, and equipment, with the City providing a Commissioning Agent for both sites. All work must be completed within 60 working days from the Notice to Proceed, with authorized working hours limited to Monday through Friday, 7:30 a.m. to 4:00 p.m. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bidders must submit a sealed proposal including a signed bid form, a completed bid schedule, a subcontractor list for any entity performing more than 0.5% of the work, and bid security equal to 10% of the maximum bid amount. Bidders must also provide a Statement of Responsibility detailing their financial resources, bonding capacity, and past performance on public works projects. Technical requirements include compliance with BACnet protocol, the National Electrical Code, and specific piping and duct marking standards such as ASME A13.1. The project is subject to California prevailing wage requirements under Labor Code section 1720 et seq.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541350
SLED
Facilities Condition Assessment Consultant Services
Solicitation # 27-006
The City of Fremont is soliciting proposals for Facilities Condition Assessment Consultant Services to perform detailed, non-destructive inspections of 65 existing public facilities totaling approximately 84,000 square feet. The selected architectural and engineering firm will conduct visual assessments of all structural, architectural, mechanical, plumbing, and electrical systems to identify components requiring maintenance, repair, or replacement. Key deliverables include a project work plan, an asset inventory compatible with CityWorks or MaintStar CMMS, a city-wide summary report utilizing the Facility Condition Index (FCI), and a strategic plan for the optimal use of facility funds. All assessments must follow ASTM Uniformat II Level 4 classification standards. Proposals are due by November 17, 2026, and must be submitted as a single PDF via BidNet Direct. The evaluation process will be conducted by a City selection panel focusing on project understanding, approach, firm and project manager experience, schedule adherence, and compliance with insurance and contract requirements. The project is expected to commence in March 2027 with a performance period of 9 to 10 months. Consultants must provide a not-to-exceed cost proposal and adhere to strict regulatory requirements, including California Department of Industrial Relations registration, prevailing wage laws, and California Government Code conflict of interest regulations. Monthly invoicing is required, and accounting records must be maintained for four years following final payment.
Building Inspection Services

POSTED

about 1 month ago

DEADLINE

in about 5 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS