Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ACS Controls Upgrade

Closed
FA485526Q0049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
LED Lighting & Occupancy Sensor Upgrade @ Batavia SPC
Solicitation # 70CMSW25R00000011
The LED Lighting and Occupancy Sensor Upgrade project for the Batavia Service Processing Center involves the removal and disposal of existing fluorescent light fixtures, lamps, and ballasts, and the installation of energy-efficient LED lighting fixtures and occupancy sensors. The scope includes all necessary labor, supervision, equipment, materials, and testing, with a requirement to provide 5% attic stock. The project must be completed within 180 calendar days from the notice to proceed and must comply with the National Electrical Code, the International Building Code, the Americans with Disabilities Act, and American Correctional Association standards. Key deliverables include a Quality Control Plan within 15 days of award, a site survey within 30 days of award, and product submittals within 30 days following the site survey. Acceptance is based on 98% of all fixtures and sensors being fully operational, supported by a detailed spreadsheet verifying 100% testing of all controls. The contractor is responsible for providing a commissioning report within 10 days of testing completion, as well as as-built drawings and warranty documentation at project closeout. This contract is subject to the Davis-Bacon Act for prevailing wage rates in Genesee County, New York, and requires adherence to OSHA safety standards.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 3 days
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is seeking a Firm-Fixed-Price task order under an 8(a) MACC IDIQ for the replacement of two emergency generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves removing two existing units and installing one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures and anchored to existing concrete slabs. The scope includes the installation of two new NEMA 3R automatic transfer switches, integration with existing fuel and electrical systems, and the performance of generator load tests. The estimated magnitude of the project is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, a feasible program implementation plan, and a robust quality control and safety program. Contractors must comply with the Buy American Act and adhere to Davis-Bacon prevailing wage rates for building construction in Puerto Rico. Key administrative requirements include the submission of certified payroll with electronic invoicing via the Invoice Processing Platform, the provision of performance and payment bonds, and strict adherence to security protocols, including the signing of non-disclosure agreements and obtaining PIV cards for personnel. Work is scheduled for regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, requires the provision and installation of two 40ft x 8ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the U.S. Virgin Islands. These units will serve as high-security, environmentally controlled spaces for forensic science technicians and must include A.C., electrical outlets, lighting, insulation, vinyl flooring, four security windows, and a steel door equipped with a Cypher lock. The offices are to be installed on 3k PSI reinforced concrete slabs measuring 42' x 10' x 6" with #4 rebars and connected to the nearest electrical circuit via 2-inch PVC or uPVC conduit. Each unit must also be equipped with a fire extinguisher. The project has an estimated magnitude between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price among qualified offerors who meet technical and safety requirements. Contractors must comply with the Buy American Act, adhere to the VI20260001 wage determination for prevailing wages, and ensure all personnel sign the required DHS Non-Disclosure Agreements. Project management requirements include submitting a detailed schedule within 15 days of the Notice to Proceed and utilizing the Invoice Processing Platform for electronic payments accompanied by certified payroll. All work must meet NFPA 70 and International Building Code standards.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management and Training Corporation (MTC), acting as the operator for the Inland Empire Job Corps Center, is soliciting subcontractor bids for a fixed-price, single lump sum contract to correct fire alarm deficiencies at the facility in San Bernardino, California. The scope of work includes the installation of SD500-PS and Notifier BNG-1 manual pull stations, the installation of Cooper Wheelock HSW and Model 757-3A-T horn/strobe notification appliances, and the replacement of six existing fire alarm bells with Cooper Wheelock HSW units. All new devices must be integrated into the existing system and undergo complete functional testing. The project is estimated between 0 and 25,000 dollars, with a performance period of 90 consecutive business days following the notice to proceed. Bids are due by September 16, 2026, and will be evaluated based on overall best value. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 238210. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to California prevailing wage determinations. For bids of 25,000 dollars or more, a bid bond of 20 percent is required, along with performance and payment bonds from a surety company with at least an A- rating. Awardees must provide a Unique Entity ID (UEI) and complete the MTC Supplier Packet. Final acceptance is contingent upon a two-stage inspection process involving a substantial completion punch list and a final inspection approved by the center and government representatives.
Inland Empire Job Corps

POSTED

about 8 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The U.S. Department of Defense, through the office at Cannon AFB, New Mexico, is conducting market research under a Sources Sought Notice for the ACS Controls Upgrade, soliciting information from small businesses capable of providing and integrating five Alerton Control Boards to consolidate an existing multi-vendor HVAC control environment into a unified system. This notice is strictly for informational purposes and does not constitute a solicitation for proposals, quotes, or bids; no contract will result from this effort, and responders will not be reimbursed for any costs incurred. The requirement targets a Total Small Business Set-Aside under NAICS code 238210, and respondents must be certified as small businesses under SBA programs such as 8(a), HUBZone, SDVOSB, or WOSB. Interested parties must submit a two-page Capabilities Statement detailing their company profile including CAGE code, UEI number, point of contact, and socioeconomic status; specific experience with Alerton Control Board installation and integration; and any applicable government-wide acquisition contracts or strategic sourcing vehicles currently held. Responses must be emailed to the designated Contracting Officer and Contract Specialist by the deadline of July 15, 2026, at 4:00 PM EDT, with the subject line formatted as “Sources Sought Response - ACS Controls Upgrade - [Company Name]”.

General Info

DoD seeks small businesses to provide Alerton Control Boards for HVAC integration, no contract expected.

Agency

Department Of Defense → FA4855 27 Socons LgcView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Cannon AFB, NM, 88103, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4855 27 Socons Lgc
Contacts2 people available
OfficeCANNON AFB, NM, 88103-5321, USA
Organization / Agency
Department Of Defense → FA4855 27 Socons Lgc
View Agency Profile
Office AddressCANNON AFB, NM, 88103-5321, USA

Full Description

Show more

This is a Sources Sought Notice for market research purposes only. This is NOT a Request for Proposal (RFP), Request for Quotation (RFQ), or an Invitation for Bid (IFB). No contract will be awarded from this announcement, and the Government will not reimburse any costs associated with responding to this notice.


The purpose of this notice is to identify potential sources, including small businesses, capable of providing, installing, and integrating 5 Alerton Control Boards to reduce the current diverse, multi-vendor HVAC control landscape to one system in order to reduce costs and incur resource savings.


REQUESTED INFORMATION


The Government is seeking vendors capable of providing this service. Interested parties are request to submit a Capabilities Statement (maximum of two (2) pages) that explicitly address the following:


1. Company Profile: Company Name, CAGE code, UEI number, point of contact, and socioeconomic business size status (e.g., 8(a), HUBZone, SDVOSB, WOSB, or Small Business) under NAICS code 238210.


2. System Experience: Demonstrated experience installing and integrating Alerton Control Boards.


3. Contract Vehicles: List any existing strategic sourcing vehicles or Government-Wide Acquisition Contracts (GWACs) (e.g., GSA Schedule) your company currently holds for these services.


SUBMISSION INSTRUCTIONS


Responses must be submitted via email to the Contracting Officer (primary point of contact) and Contract Specialist (alternate point of contact) listed in this notice prior to the day and time identified in this notice. Please include "Sources Sought Response - ACS Controls Upgrade - [Company Name]" in the subject line.



More opportunities from Department Of Defense → FA4855 27 Socons Lgc

Same awarding agency

NAICS: 238210
New
Federal
Exhaust Troubleshooting
Solicitation # FA485526Q0072
Solicitation FA485526Q0072 is a firm-fixed-price contract for exhaust system troubleshooting and repair at Building 4607, Cannon Air Force Base, New Mexico, issued by the 27th Special Operations Contracting Squadron. This 100 percent Small Business Set-Aside requires a contractor to test and troubleshoot the communications control bus using the Andover Continuum platform for all controllers and terminal equipment. The scope includes verifying the sequence of operations for various systems, such as paint booth air handlers, exhaust fans, chilled and heating water systems, and machine shop and office air handlers. While minor repairs like re-terminating devices are included, major repairs involving long wire runs or high bay ceiling work are excluded. The primary deliverable is a detailed written deficiency report identifying equipment failures and recommended corrective actions. The performance period must be completed within 90 days after receipt of the order. Award will be based on the most advantageous offer, considering technical capabilities, past performance, and price. To be considered responsive, offerors must be registered in the System for Award Management and certified as a Service-Disabled Veteran-Owned Small Business. Required submission documents include a conforming proposal, a completed pricing worksheet, offeror certifications, and a signed conflict of interest statement. Invoicing is to be processed electronically through the Wide Area Workflow system.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS