This Solicitation opportunity from New Mexico was posted on January 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Farmington is seeking qualified general contractors to undertake a comprehensive renovation project at 312 E. Apache Street in Farmington, New Mexico. The project focuses on demolishing and renovating two restroom facilities to ensure full compliance with ADA standards, upgrading the HVAC system, and replacing the sewer line. Funded through the Community Development Block Grant, all work must adhere to specific CDBG requirements outlined in the bid documents. The contractor is responsible for providing all labor, materials, tools, supervision, and related resources necessary to complete the scope of work as specified, including detailed drawings and specifications. The project emphasizes accessibility improvements, infrastructure upgrades, and compliance with relevant standards and codes, with the ultimate goal of creating accessible, upgraded restroom facilities for all users.
The solicitation, identified as "ADA Building Renovations for All Abilities Restroom," was posted on January 28, 2024, with a deadline for responses set for February 28, 2024. The contract involves detailed contractual conditions outlined in the Conditions of Contract - Construction documents, which specify responsibilities, change procedures, payment terms, and dispute resolution processes. The project is managed by Christina Lazenby, whose contact information is provided for inquiries. The procurement process emphasizes compliance with federal and state standards, and the bid documents include references to relevant specifications, amendments, and contractual obligations to ensure clarity and adherence throughout the project duration.
HighAI Summary for 24-156456 ADA Building Renovations for All Abilities Restroom - Addendum 3: Addendum 3 for solicitation 24-156456, issued January 28, 2024, by the City of Farmington, NM. The project involves ADA-compliant demolition and renovation of two restroom facilities, HVAC upgrades, and sewer line replacement at 312 E. Apache St., funded by CDBG. The document outlines critical deadlines, including a question deadline of February 16 and a response deadline of February 28, 2024. It details pre-bid conference information, virtual bid opening procedures, and a comprehensive list of required attachments including bid bonds, wage decisions, and CDBG certifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ADA Building Renovations Drawings - City of Farmington - 01/05/2024: This document contains the 100% submittal construction drawings for the ADA Building Renovations at 312 E. Apache Street, Farmington, NM, dated January 5, 2024. It includes a comprehensive drawing index with over 250 sheets covering architectural, mechanical, electrical, and structural details. The document provides keynotes, legends, and detailed plans for all abilities restrooms and related building renovations to ensure compliance with ADA standards. It serves as a critical technical specification for construction and renovation work.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum One for ADA Building Renovations Bid #24-156456: Addendum One dated February 22, 2024, for the ADA Building Renovations for All Abilities Restroom Bid #24-156456. This amendment introduces a new manufacturer approved in the Technical Specifications for Electric Hand Dryers, specifically the Mach Flow by Saniflow. It includes detailed product requirements and specifications for toilet accessories such as electric hand dryers, toilet paper dispensers, combination towel dispenser/waste receptacles, soap dispensers, and mirrors. The addendum instructs bidders to acknowledge receipt and update bids accordingly if already submitted.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond Form AF-6 for ADA Building Renovations, Bid 24-156456: This document is the Bid Bond Form AF-6 for the City of Farmington, New Mexico, associated with Bid #24-156456 for the ADA Building Renovations project. The bond guarantees the Principal's commitment to enter into a contract and provide performance and payment bonds if awarded the project. The project involves demolition and renovation of restroom facilities to comply with ADA standards, HVAC upgrades, and sewer line replacement at 315 E. Apache St., funded by federal CDBG. The bond includes obligations of the Principal and Surety to the City of Farmington as Obligee, ensuring faithful performance and payment for labor and materials. The document also contains a Certificate of Surety confirming authorization to transact business in New Mexico and compliance with state laws. The bond must be accompanied by a Power of Attorney.
PDF
PDF, High priority: read this firstbidding-requirements
HighAI Summary for Bidding Requirements (CDBG) - Construction: This document titled 'Bidding Requirements (CDBG) - Construction' provides comprehensive instructions and requirements for bidders on a construction project managed by the City of Farmington, New Mexico. It includes sections on instructions to bidders, required documents, bid preparation, bid security, subcontractor information, withdrawal of bids, and compliance with federal and state regulations. The document references New Mexico Standard Specifications for Public Works Construction and City of Farmington Technical Specifications. It outlines bid submission rules, licensing requirements, tax considerations, and bonding requirements. The document is essential for understanding the bidding process, submission deadlines, and legal obligations for contractors interested in the project.
PDF
PDF, High priority: read this firstfederal-clauses
HighAI Summary for CDBG Federal Clauses for Construction Contracts: This document contains the federal requirements and certifications applicable to Community Development Block Grant (CDBG) construction contracts. It references CFR 200.317 through 200.326 and Appendix II of Part 200, detailing compliance provisions such as Equal Employment Opportunity, Affirmative Action, Civil Rights, Section 3 compliance, and various labor and safety standards. The document includes clauses on nondiscrimination, labor standards, termination, subcontracting, and other federal mandates relevant to construction contracts funded under CDBG programs. It serves as a comprehensive guide for contractors to ensure adherence to federal regulations during contract performance.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Community Development Block Grant Requirements 24-156456: This document outlines the requirements for the Community Development Block Grant (CDBG) awarded to the City under Title I of the Housing and Community Development Act of 1974. It details the conditions for construction services, including the necessity of an approved environmental review by HUD. The contractor must provide monthly itemized expense reports and maintain accurate records of costs and activities. Compliance with the Davis-Bacon and Related Acts for wage standards is mandatory. The document also mandates accessibility for persons with disabilities and adherence to civil rights laws and executive orders, including equal employment opportunity and affirmative action. It specifies obligations under Section 3 of the Housing and Urban Development Act to prioritize employment and economic opportunities for low-income persons. The contractor must ensure a discrimination-free work environment and comply with various federal and state regulations. This version includes detailed compliance and reporting requirements essential for contract performance.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Conditions of Contract - Construction: This document titled 'Conditions of Contract - Construction' outlines the contractual terms and conditions applicable to construction projects, replacing the General Conditions of the New Mexico Standard Specifications for Public Works Construction. It includes definitions, abbreviations, contractor and owner responsibilities, bonds and insurance, changes in work, payments, warranties, dispute resolution, and other essential contract provisions. The document is structured into multiple sections covering preliminary matters, interpretation of contract documents, physical conditions, bonds, contractor and owner duties, changes in contract price and time, warranties, payments, suspension and termination, dispute resolution, and relevant New Mexico statutes. It serves as a comprehensive guide for managing construction contracts under the City of Farmington, New Mexico standards.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract Forms - City of Farmington Notice of Award and Agreement: This document contains contract forms for the City of Farmington, New Mexico, including the Notice of Award, Agreement, and Performance Bond. It notifies the contractor of bid acceptance, outlines contract terms, payment conditions, and obligations, and includes bond requirements for projects over $25,000. The forms require signatures from the contractor, city officials, and a notary public. The document is essential for formalizing the contract and ensuring compliance with local procurement laws and regulations.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Federal Wage Determination NM20240046 for Building Construction in San Juan County, NM: This document is the Federal Wage Determination NM20240046, effective January 5, 2024, superseding NM20230046. It applies to building construction projects in San Juan County, New Mexico, excluding single-family homes and apartments up to four stories. It outlines prevailing wage rates and fringe benefits for various construction trades under the Davis-Bacon Act, including adjustments required by Executive Orders 14026 and 13658 for minimum wages in 2024. The document includes classifications, union and survey rate identifiers, and contractor obligations such as paid sick leave under EO 13706. It serves as a mandatory wage schedule for federal contracts subject to these labor standards.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bid Form AF-1(a) - Farmington Restroom Renovation: This Invitation to Bid (Form AF-1(a)) issued by the City of Farmington solicits qualified general contractors for demolition and renovation of two restroom facilities to meet ADA standards, upgrade HVAC, and replace sewer lines at 312 E. Apache St., Farmington, NM. The project is funded by the Community Development Block Grant (CDBG) and requires compliance with CDBG and all applicable codes. The contractor must provide all labor, materials, permits, insurance, and supervision for a turnkey project including daily site cleaning and waste removal. The bid includes multiple schedules with unit prices and requires a 5% bid bond. Completion is expected within 213 calendar days with liquidated damages of $500 per day for delays. The Engineer's Opinion of Probable Construction Costs is $580,160.16. The document includes detailed bid submission requirements and subcontractor listing thresholds.
PDF
PDF, High priority: read this firstspecial-conditions
HighAI Summary for Special Conditions (CDBG) Construction - City of Farmington: This document titled 'Special Conditions (CDBG) Construction' for the City of Farmington outlines specific conditions modifying the General Conditions of Bidding Requirements and Contract Documents for construction contracts. It includes compliance requirements with CDBG grant funding under federal law, adherence to 2 CFR 200 administrative requirements, civil rights laws, and executive orders. The document details audit and inspection protocols, lobbying restrictions, performance monitoring, and contractor obligations such as drug testing policies and traffic control. It is intended to ensure compliance with federal funding rules and proper contract execution for construction projects funded by Community Development Block Grant (CDBG) funds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Technical Specifications ADA Renovations - Demolition Section: This document is a technical specification section (02 41 00) for selective demolition related to ADA renovations. It includes definitions, reference standards (NFPA 241), submittal requirements, and detailed execution procedures for demolition work. Key content covers demolition methods, safety procedures, protection of existing structures and utilities, coordination with utility companies, and environmental considerations. The document emphasizes compliance with codes, permits, and safety regulations, and outlines responsibilities for salvage, removal, and disposal of materials. It is intended to guide contractors in performing demolition work safely and effectively as part of the renovation project.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Decision SJ-24-0164-B for ADA Building Renovations: This document is the Wage Decision Approval Summary SJ-24-0164-B for the ADA Building Renovations for All Abilities Restroom project in Farmington, San Juan County. Approved on 01/16/2024, it sets wage standards for the project with bids expiring on 05/15/2024. The project involves demolition and renovation of restroom facilities to meet ADA standards, HVAC upgrades, and sewer line replacement, with an estimated cost of $580,160 funded by federal funds. The contract award is estimated for 02/26/2024, and the project aims to ensure ADA compliance for all abilities access.
PDF
PDF, Low priorityother
LowAI Summary for CDBG Required Federal Forms and Certifications: This document contains required federal forms related to Community Development Block Grant (CDBG) procurements, including the Nondebarment Certification and Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion for lower tier covered transactions. It outlines the responsibilities and certifications required by recipients of federal assistance funds under Executive Orders 12549 and 12689, and related regulations. The document also includes a disclosure form (SF-LLL) for lobbying activities, detailing instructions for completion and reporting requirements under 31 U.S.C. section 1352. The forms are intended to ensure compliance with federal regulations and transparency in federal funding transactions.
LowAI Summary for Conflict of Interest Questionnaire for CDBG Funding: This Conflict of Interest Questionnaire is required by the City of Farmington for applicants seeking Community Development Block Grant (CDBG) funding. It aims to identify any financial interest conflicts involving the applicant, its staff, Board of Directors, or affiliates with City employees, consultants, or City Council members. The questionnaire includes questions about current or recent City affiliations, subcontract awards to related parties, and any other potential conflicts. The document requires the authorized official's name, signature, and date to certify the information provided.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The City of Farmington (COF) is seeking qualified general contractors to submit proposals for demolition and renovation of two restroom facilities to comply with ADA design standards, upgrade HVAC system and replace sewer line at 312 E. Apache St. in Farmington, NM. The primary goal of the project is to bring restroom facilities into ADA compliance. The project is funded by the Community Development Block Grant (CDBG), all work shall follow CDBG requirements included in bid documents. The Contractor shall provide all labor, materials, tools, equipment, supervision and other related items required to the complete project as per scope of work, specifications, and attached drawings.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award