Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

ADA Concrete Improvements

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The ADA Concrete Improvements subcontract involves the installation of reinforced concrete sidewalks and curbs for prime contractors on Maine Department of Transportation projects. The scope of work includes pouring reinforced sidewalks, installing vertical, circular, and slipform curbs, and placing curb ramp detectable warning fields. All deliverables must strictly adhere to ADA accessibility standards, utilizing specialized slipform curbing equipment and detectable warning tiles to ensure compliant sidewalks and curb ramps. This project is managed by the Maine Department of Transportation and will be performed in Rumford. The solicitation is categorized under NAICS code 238110. Interested parties must submit their responses by the deadline of December 9, 2026. There is no specific set-aside status designated for this contract.

General Info

Documents

This scope was carved out of 025431.00.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Rumford — Replace Signals at Route 2 and 120 (HCP 1), Portland Street at River Street (HCP 3), and Congress Street and Bridge Street (HCP 2) in the Town of Rumford.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 21 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 4 documents on the prime contractFrom Rumford — Replace Signals at Route 2 and 120 (HCP 1), Portland Street at River Street (HCP 3), and Congress Street and Bridge Street (HCP 2) in the Town of Rumford.
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaine Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs reinforced concrete sidewalks and curbs for prime contractors on Maine Department of Transportation projects. Pours reinforced sidewalks, installs vertical, circular, and slipform curbs, and installs curb ramp detectable warning fields. Must adhere to ADA accessibility standards. Uses slipform curbing equipment and detectable warning tiles. Delivers completed ADA-compliant sidewalks and curb ramps.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Cardella Courts Concrete Walkway Replacement Project
Solicitation # 2026-IFB-27
Fresno Housing is soliciting bids for the Cardella Courts Concrete Walkway Replacement Project located at 419 P Street, Firebaugh, California. The scope of work involves the demolition and removal of existing concrete walkways, site preparation including excavation and aggregate base installation, and the construction of new concrete walkways. All work must be performed by a contractor holding an active California C-8 Concrete Contractor license and must adhere to the California Building Standards Code, ADA accessibility standards, and HUD requirements. Key technical specifications include concrete strength between 3,000 and 4,000 PSI, a nominal thickness of 4 inches, and a light broom finish for slip resistance. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically through the Procurement Portal, ensuring a price is entered for every required item and that combined overhead and profit does not exceed 14%. Compliance with the Davis-Bacon and Related Acts, the Copeland Act, and Build America, Buy America (BABA) requirements is mandatory. The successful contractor must provide a performance and payment bond for 100% of the contract price or separate bonds of at least 50% each. Payments are issued on a Net/30 basis, subject to a five percent retainage.
Property Management

POSTED

about 23 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Maine Department of Transportation

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS